Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estimating the Hydrophobicity of CoalBy J. A. Gutierrez-Rodriguez, R. J. Purcell, F. F. ApIan
"Based on contact-angle measurements and the work of adhesion equation, the hydrophobicity of a wide variety of coals was found to decrease with decreasing rank, fixed carbon and total carbon content
Jan 1, 1989
-
Estimating the Rock Mass Strength of Hawkesbury SandstoneBy R Bertuzzi
"This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa
Nov 5, 2014
-
Estimating the thickness of the Martian subsurface layer based on the fault patternBy B Bradák, D Asahina, S Saydam, S Akdag
Human exploration of Mars has been on the horizon of scientific goals for decades now, and as part of the objectives of human missions to various planets, one of the possible goals is opening new econ
Sep 1, 2024
-
Estimating the Unconfined Compressive Strength (UCS) of Emplaced Cemented Rockfill (CRF) from QA/QC Cylinder StrengthsBy M. J. Raffaldi, L. A. Sandbak, K. K. Dehn, S. N. Warren, J. B. Seymour
"Confidence in the design and stability of an undercut cemented rockfill (CRF) span requires a thorough understanding of its emplaced material properties. The unconfined compressive strength (UCS) of
Jan 1, 2018
-
Estimating Tunneling Costs Using An Interactive Computer ModelBy William E. Little, William R. Sharp, Edward R. Kennedy
Cost o f mechanical tunneling requires the knowledge of many machine/rock parameters such as rock types, machine power, penetration rate, cutter life, maintenance schedule, etc. Capital investment, la
Jan 1, 1983
-
Estimating Water Demand and Availability for Open Water-based Mill Cooling SystemsMineral processing is an energy and water intensive activity. Mill comminution equipment usually has high energy requirements which necessitate extensive cooling to remove heat. Cooling requirements a
Jan 1, 2014
-
Estimation And Control Of Ground Water Inflow And Discharge From Underground MinesBy R. E. Snow
The analysis of ground water inflow and discharge from underground mines has received increased attention in recent years due to environmental issues which must be addressed under current state regula
Jan 1, 1990
-
Estimation and Planning Tool for Industrial Construction ScaffoldingBy C Kumar
Scaffolds are temporary structures built to facilitate construction activities on site. A considerable amount of resources are allocated to scaffolding on industrial projects. Variability in geometric
Aug 1, 2013
-
Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement PlotsBy Lenin T., Madhav M. R., Padmavathi V.
Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging
Sep 1, 2022
-
Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"By Kwangmin Kim, Junnhyeok Park
In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used
May 16, 2020
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge MethodBy Jogeshwar P. Singh, Mohamed Ashour
The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio
Jan 1, 2015
-
Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case StudyBy Zhiye Zhao, Jianping Sun, Zhipeng Xu
"The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of
Jan 1, 2015
-
Estimation of large open pit haulage truck requirementsBy G. H. Blackwell
Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement
Jan 1, 1999
-
Estimation Of Long-Term Stability Of Mine Pillars In Underground PitBy S. Yamashita
Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th
Jan 1, 1996
-
Estimation of mechanical rock properties using wireline geophysical measurementsBy L. Wade, R. Wang, M. A. Horton
Laboratory methods to find the mechanical properties of rock are inherently biased towards stronger strata, which best survive the sample preparation process. Geophysical techniques are not subject to
Jan 4, 1993
-
Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression TestsBy Padmavathi V, M. Najamuddin, M. R. Madhav
Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation
Sep 1, 2022
-
Estimation Of Modulus Of Deformation Of Ground From Axial Compression, Pullout And Lateral Load Tests On Single PileBy Madhav, V., M. R., Ahmad, Padmavathi, M. S.
Modulus of deformation (Es), also referred to as elastic modulus is dependent on many variables such as type of loading, degree of anisotropy and non-homogeneity of strata, etc. and is one of the most
Sep 1, 2022
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical ApproachBy Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Estimation Of Ore Reserves And-Mining Methods In Alaska Juneau MineBy P. R. Bradley
This paper gives a brief history of the mining and milling operations in the Juneau gold belt, and a general description of the geology of the district, followed by a suggestive discussion of the gene
Jan 3, 1924