Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Of The Marine Foundations For The Skyway Project Of The San Francisco Oakland Bay BridgeBy Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2013
-
Design of the Melbourne City Link TunnelsBy S Porter, R Woodall, N Weeks
Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it
Jan 1, 1999
-
Design of the New Lihir Gold Pressure Oxidation AutoclaveBy M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt
Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island
Jan 1, 2011
-
Design of the Otjikoto Gold Mill, NamibiaBy John Rajala
The Otjikoto Gold Mill was commissioned during November–December 2014 as Namibia’s first new gold producer in 30 years. Its operations consist of surface mining with a modern gravity/carbon-in-pulp mi
-
Design of the Otjikoto Gold Mill, Namibia "Mining, Metallurgy & Exploration (2021)"By John Rajala
The Otjikoto Gold Mine in the Republic of Namibia is located approximately 300 kilometers north of the capital city of Windhoek. The project features surface mining with a modern gravity/carbon-in-pul
Oct 30, 2020
-
Design of the Pierina Waste DumpBy P. Mark. Hawley
Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa
May 1, 2002
-
Design of the Pierina waste dumpBy R. Sharon, P. M. Hawley, X. Ochoa
"Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa
Jan 1, 2003
-
Design Of The Sacaton Concentrator - Design ConsiderationsBy Dennis K. Mortensen
The warm southwestern desert of Arizona is an ideal location for ASARCO's new Sacaton Unit. The climate of this arid region played a major role in the design considerations of the Unit's cru
Jan 1, 1974
-
Design of the Underground Structures of the Railway Link between the Town of Thumrait and the Port of Salalah: Segment 4c of the “Oman National Railway Project”By Pedone Ezio Michele, Mohamed Dahir Holad
"The 4c segment is a part of the ""Oman National Railway Project” linking the mining area in the surroundings of Thumrait and the port of Salalah. It is 90 km long and the last 40 km stretch crosses a
Jan 1, 2016
-
Design of the University Link Tunnels and StationsBy Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008
-
Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, TaiwanBy Jay Keng
During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi
Jan 1, 1988
-
Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026By C. H. Stephenson, Z. White
This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio
Feb 22, 2026
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en
Jan 1, 2004
-
Design Problems Associated With Port Handling FacilitiesBy Ian S. Ross
The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry
Jan 1, 1972
-
Design Review Of A Rectangular Shaft In AlluviumBy P. D. Pack, E. H. Skinner
During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio
Jan 1, 1977
-
Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide SlurriesBy Hawes GW
Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv
Jan 1, 1988
-
Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent DevelopmentsBy Nicolas Gatelier, Sophie Laurent, Thierry You
Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also
Jan 1, 2015
-
Design Strategies For Selective FlocculantsBy G. R. O?Neil
The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i
Jan 1, 1983
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessmentBy A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017