Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
-
Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, ColoradoBy Kyle Kershaw
Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty
Jan 1, 2007
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
-
Design, implementation and field performance of a face destress blasting method for mine developmentBy E Villaescusa, C Drover, I Onederra
Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at
Nov 29, 2022
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa MineBy B Nielsen, H Lehto, B Musuku
"The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo
Oct 10, 2016
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled ShaftBy Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Design, Specification And Installation Of Square Shaft Helical Piers In Expansive SoilsBy John S. Pack
The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and
Jan 1, 2007
-
Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Design-By-Analysis of Water-Cooled Gas Handling DuctsBy T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani
"Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,
Jan 1, 2017
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build Highway Blasting - Case StudyBy Cathy Aimone-Martin, Frank Achuff
The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i
Jan 1, 2004