Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Deep Cover Bleeder Entry Performance and Support Loading: A Case StudyBy Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti
"How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr
Jan 1, 2017
-
Deep Cover Pillar Extraction In The U. S. CoalfieldsBy Keith A. Heasley, Frank E. Chase, Christopher Mark
Deep cover retreat mining (overburden in excess of 750 ft) is an important emerging issue which will intensify in the future as the more easily mined shallow seam reserves are depleted. Analysis of M
-
Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By E. R. Bauer
The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove
Jan 1, 1999
-
Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, ConnecticutBy Theodore von Rosenvinge
Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har
Jan 1, 2011
-
Deep Drilling at Mica Dam, British ColumbiaBy Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer
"Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow
Jan 1, 2017
-
Deep Dry Soil Mixing Performance and Quality Control Acceptance CriteriaBy Patrick K. Wong, Richard Kelly
"The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care
Jan 1, 2015
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Deep Excavation Support: Innovative Shoring Design in an Urban EnvironmentBy Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Deep Foundation Element Supported Mat Design And Construction In An Urban SettingBy Satyajit A. Vaidya
This paper presents a case-study in the design and construction of deep foundation element supported mats for two residential towers on an18,000-square-foot site in Brooklyn, New York. Based on site
Jan 1, 2010
-
Deep Foundation Ground Anchors In The Wind Energy Industry - Current Status Of Design And Construction Practices And Introduction Of A Patented System To Improve Foundation PerformanceBy Josef K. Alter
Long-term performance and behavior of post-tensioned ground anchors subjected to axial cyclic loading constitutes an important aspect of the stability, reliability and overall performance of wind turb
Jan 1, 2010
-
Deep Foundation Shoring in South FloridaBy Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Deep Foundation Support for the Iconic New York WheelBy Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran
"This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor
Jan 1, 2016
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006