Search Documents

Sort by

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • AUSIMM
    Construction Methods for Remote Locations

    Projects to be undertaken in remote locations require special attention with regard to constructability from the very first stages of design. This is to ensure not only that the project is compat

    Jan 1, 1986

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • CIM
    Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final Reconciliation

    By Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto

    "The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • DFI
    Construction Of A Spillwall In The Columbia River

    By Francis B. Gularte

    The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw

    Jan 1, 2010

  • DFI
    Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off Wall

    By Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney

    "Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly

    Jan 1, 2017

  • AUSIMM
    Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

    By N Wharmby

    In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh

    Mar 8, 2011

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007