Search Documents

Sort by

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • SME
    Construction of Leach Pads on Steeply Sloping Ground

    By Nancy C. Shaver, Alan Tapp

    Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large

    Jan 1, 1987

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • SME
    Construction Of Port Huron, Michigan Intake Shaft

    By D. E. Piggott, B. E. Hartmann

    The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise

    Jan 1, 1974

  • SME
    Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project

    By Hendrick A. D. Kirsten, A. Clayr Alexander

    Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so

    Jan 1, 2001

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • CIM
    Construction of Sherritt's Concentrators

    By J. A. MacLellan

    "CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design

    Jan 1, 1972

  • SME
    Construction Of Straight Creek Tunnel, Colorado

    By R. C. Hopper, A. A. Mathews, T. A. Lang

    DESCRIPTION OF PROJECT The Straight Creek Tunnel site is located approximately sixty (60) miles west of Denver, Colorado, on Interstate Route 70 in the vicinity of Loveland Pass, in the Rocky Mount

    Jan 1, 1997

  • SME
    Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023

    By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth

    A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di

    Jun 13, 2023

  • SME
    Construction Of The 1122 / 1130 Tunnels on the Superconducting Super Collider Project

    By Tom B. Corry

    INTRODUCTION Located approximately 48 km (30 miles) south of Dallas, Texas, use to be the site of the Superconducting Super Collider. For those of you unfamiliar with the project, this was a multi-

    Jan 1, 1995

  • SME
    Construction of the Bypass Tunnel for the Upper Llagas Creek Flood Protection Project - RETC2023

    By Clayton Williams, Dale M. Hata, Glenn M. Boyce

    The Upper Llagas Creek Flood Protection Project in Northern California encompasses portions of the communities of Morgan Hill and Gilroy, and unincorporated areas of Santa Clara County. The project pr

    Jun 13, 2023

  • DFI
    Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, Malaysia

    By Vijayakumar Viramuthu, Martin Heinrich

    Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T

    May 1, 2022

  • DFI
    Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New Orleans

    By Dan A. Brown

    The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi

    Jan 1, 2010

  • SME
    Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

    By Brian Fulcher, John Eastlund, J. B. Copeland

    Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro

    Jan 1, 1999

  • SME
    Construction of the Longest Road Tunnel in Mexico

    By Miguel Angel Banuet Rodriquez, Hector Conceso Aragon

    "Construction of the longest road tunnel in Mexico is part of Acapulco’s alternate roadway to the scenic roadway project. This article provides a brief summary regarding details of the construction si

    Jan 3, 2018