Search Documents

Sort by

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • SME
    Construction And Operation Of A Series Of Biological Leaching Tests Dumps

    By A. Bruynesteyn

    Many papers 'have been publihed on the role of the bacterium.Thiobacillus ferrooxidans in the oxidation of reduced sulfur compounds, and years of research have established the following environme

    Jan 1, 1972

  • SME
    Construction And Operation Of An Innovative Long Distance Conveying System At Twin Buttes

    By F. Brost

    In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower Partnership Mine to Twin Buttes. The system, supplied and installed by Cable Bel

    Jan 1, 1979

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • DFI
    Construction And Verification Of Large Bored Pile For Bridge Foundation Through Deep Weak Alluvial Soil Layers And Artesian Aquifer

    By C. Dai, S Raathiv

    The Waikato Expressway is one of the New Zealand Transport Agency’s (NZTA) seven roads of National Significance. Coffey is part of the City Edge Alliance engaged by NZTA for the Hamilton Section of th

    Nov 1, 2022

  • ISEE
    Construction Blasting in Central Oregon

    By Paul Schmiesing, Matt Higgins

    Central Oregon is a fast growing resort community centered in Bend, Oregon. Bend is bordered by the Cascade Mountains to the west and the high dessert to the east. Central Oregon is blanketed with lav

    Jan 1, 2000

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • DFI
    Construction Induced Vibration during Sheet Pile and Pile Driving in Deep Excavation

    By Ambarish Ghosh, Subhaprasad Chakraborty

    "Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i

    Jan 1, 2015

  • CIM
    Construction Labour Relations in the Mining Industry

    By W. J. Gibson

    "This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc

    Jan 1, 1972

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • AUSIMM
    Construction Methods for Remote Locations

    Projects to be undertaken in remote locations require special attention with regard to constructability from the very first stages of design. This is to ensure not only that the project is compat

    Jan 1, 1986

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006