    Blast Vibration Monitoring & Calibration in the 21st Century

    By W. J. Birch, R. Farnfield

    Nuisance caused by perceived high vibration levels as a result of blasting on quarries and opencast coal mine is now the number one environmental concern of residents living adjacent to such operation

    Jan 1, 2014

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • ISEE
    Blast Vibration Monitoring, Prediction and Control at Old Cliffe Hill Quarry

    By Rob Farnfield, Mark Pegden

    Old Cliffe Hill quarry produces between 4 and 5 million tonnes of crushed granite per year and is located in the county of Leicestershire in the East Midlands region of England. Blasting is carried ou

    Jan 1, 2010

  • ISEE
    Blast Vibration Predictions, Damage Assessment and Vibration Monitoring for a Medical Center Expansion

    By D. Lee Petersen, Travis Davidsavor

    The 2003-2004 expansion of a Duluth medical center required rock blasting adjacent to the existing structures, a Mn/DOT retaining wall and other urban structures. This case history describes the metho

    Jan 1, 2010

  • CIM
    Blast-Furnace Slag Cement

    By J. A. Brothers, M. R. Foran

    "AbstractThis paper reviews the progress made in the manufacture of hydraulic cement from iron blast-furnace slag by simply grinding the granulated material with other constituents. The influence of t

    Jan 1, 1950

  • SME
    Blast-induced rock damage and optimized blast design in a hard-rock mine - SME Transactions 2014

    By K. M. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Jan 1, 2014

  • SME
    Blast-Induced Rock Damage and the Optimized Blast Design in a Mine: A Case Study

    By K. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Feb 23, 2014

  • SME
    Blast-Induced Rock Movement Measurement For Grade Control

    By Ananta L. Yennamani

    Blast movement measurement (BMM) transmitters are a practical method to measure three-dimensional (3D) rock movement because of blasting. The BMM transmitters are activated, programmed and installed i

    Jan 1, 2011

  • ISEE
    Blastability Index to Assess Fragmentation from Drill Monitoring Data in Bench Blasting

    By PHILIPP HARTLIEB, Peter Schimek, Thomas Seidl, Pablo Segarra, José A. Sanchidrián, Juan Navarro

    This paper develops a new Blastability Index to assess hole-to-hole fragmentation in bench blasting based on a new Rock Factor exclusively obtained from drill-monitoring data, that can provide an auto

    Feb 1, 2020

  • CIM
    BLASTCAD - Noranda's three-dimensional computer-aided underground blast design system

    By P. Favreau

    "This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out undergroun

    Jan 1, 1993

  • CIM
    BLASTCAD ? Noranda's three-dimensional computer-aided underground blast design system

    By P. Favreau

    This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out underground

    Feb 1, 1993

  • SME
    Blasted Ore Losses and Mineral Reserve: Reconciliation Approaches and Impact on Stope Performance - Mining, Metallurgy & Exploration (2021)

    By Marcel Laflamme, Sebastián Ibarra‑Gutiérrez

    Improvement on controlling the stope limits has enabled the assessment of technical performance in several underground mining operations. Technical performance, integrated to stope geotechnical and ge

    Aug 9, 2021

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • SME
    Blasthole Mining In Poor Ground Conditions At Magma Copper -Superior Division

    By D. Donison

    The practice of blasthole mining is typically applied in competent ground conditions, primarily because of the open stope dimensions. At Magma Copper -Superior Mine, a field pilot project was complete

    Jan 1, 1994

  • AUSIMM
    Blasthole Sampling for Grade Control - The Many Problems and Solutions

    Conventional blasthole sampling for grade control has acquired an extremely bad reputation for the last 50 years. The introduction of many sources of bias is a structural reality. Delimitation biases

    Jan 1, 2008

  • IOM3
    Blasthole stoping - drilling accuracy and measurement

    By F. Boudreault, M. J. Scobie, J. Szymanski, C. Hendricks

    The development of new stoping methods and more effective control over dilution, recovery and fragmentation depends on improved accuracy in blasthole drilling. The mechanisms and factors which control

    Jan 12, 1992

  • CIM
    Blasthole stoping for narrow vein mining

    By Y. Lizotte

    "This paper examines the application of blasthole sloping to narrow vein mining in Canada, for ore deposits where widths are less than two metres. While the technique has now been utilized for more th

    Jan 1, 1991

  • SME
    Blasthole Sub-Level Stoping At Kidd Creek Mine

    By Peter N. Blakey

    The Kidd Creek orebody is a massive, base metal deposit with widths up to 600 feet and a strike length of 2,200 feet. The orebody dips eastwards at 70° to 80° and is amenable to sub-level open stoping

    Jan 1, 1976

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • AUSIMM
    Blasting a Cavern Using Bulk Emulsion Explosives

    The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and allows large capacity, safe and environmentally benign storage of Liquefie