  • CIM
    Roasting Renaissance- Fluid Bed Roasting For Enhanced Gold Recovery from Double Refractory Ores

    By A. R. Barnes, N. Stubina

    Increasingly, gold producers are forced to treat ever more refractory ores. While ores containing pyrite, arsenopyrite and carbonaceous material have been subjected to complete pressure oxidation (PDX

    Jan 1, 2011

  • SME
    Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, India

    By William Brundan

    INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide

  • SME
    Robbins Double Shield Breaks Through On Sochi Project

    In early March 2011, a 6.2 m (20.3 ft) diameter Rob-bins Double Shield tunnel boring machine (TBM) crossed the finish line in Sochi, Russia. The machine completed a 4.5-km- (2.8-mile-) long section o

    Jan 1, 2011

  • SME
    Robinson: An Integrated Operation

    By M. R. Grundy

    The Robinson project is based on the porphyry copper and gold deposits in the Robinson Mining District, near Ely in Eastern Nevada. The district was mined from the late nineteenth century to 1978 by K

    Jan 1, 1994

  • SME
    Robotic Application of a 50mm Thick Sprayed Concrete Fireproofing Layer

    By Eleanor Kentish, Edward Batty, Alan Skarda

    "The design of the tunnels at Bond Street Station includes a final sprayed concrete fireproofing layer. The performance of this layer was verified by a program of testing to Crossrail’s KT24 specifica

    Jan 1, 2016

  • SME
    Robotic Mining and Micro Tunneling Using Hypersonic Projectile Impact Technology: Field Trial Results, Technical Evaluation and Economic Valuation - RETC2021

    By Mark C. Russell, Charles T. Russell, Brooke Colburn, Parker Bailey, Desiree Bernhard, Kaito Durkee, Tristen Cutshall, Rob P. H. Urselmann

    Hypersonic tunnel boring (HTB) uses directed, high velocity projectile impacts to remove rock. HTB is highly independent of rock strength and targets hard, abrasive rock and variable rock environments

    Jun 13, 2021

  • CIM
    Robotic Upgrading of Postwar Social Dwelling Envelopes

    By K. Iturralde

    The article discusses the possibility of automation in refurbishment processes of social dwelling built from 1950 to 1970. These massively produced buildings were mostly designed prior to the law enfo

    Aug 1, 2013

  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • SME
    Robust Showfloor Reflects Optimistic Mood at 2017 Annual Conference and Expo

    "In addition to outstanding technical sessions and networking opportunities, the SME Annual Conference and Expo offers attendees a chance to see the latest and greatest technology that the industry ha

    Jan 5, 2017

  • AUSIMM
    Robust versus Flexible Open Pit Mine Design

    Strategic planning in mining is an important value accretive process. One of the most important aspects during the planning phase is determining the correct mine and plant design. The traditional mine

    Dec 6, 2010

  • SME
    Rochester - Nevada's Newest And Largest Precious Metal Project - Introduction And History

    By M. R. Carter

    The Rochester Mining District is located some twenty-five miles NE of Lovelock, Nevada. The District was discovered and named in the 1860's by prospectors from Rochester, New York. For a number

    Jan 1, 1987

  • SME
    Rock Belt

    By Susumu Ukita

    We have developed first a conveyor belt for transporting large lumps, i.e. Rock Belt successfully, in June 1976. The First Rock Belt had been delivered to Myodani site of Kobe City Developing Board

    Jan 1, 1981

  • CIM
    Rock Bolting Techniques and Applications for Gateroads in Fully Mechanized Top Coal Caving Face

    By Hongpu Kang

    The fully mechanized top coal caving mining method has been the main mining approach for thick coal seams with high output and efficiency in Chinese coal mines. The gateroads for the top coal caving m

    Aug 1, 2013

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AIME
    Rock Bursts - A Symposium (60f4f2fa-16ca-42d3-a35b-d369fc39531a)

    By Philip B. Bucky

    CONTENTS [PACEPACE r. What Is a Rock Burst?2 4. How Can Rock Bursts Be Predicted? . 35 Jack Spalding2Jack Spalding35 A. F. Robertson 2, 5A. F. Robertson35 W. R. Crane 2A. B. Yates and P. J. She

    Jan 1, 1942

  • SME
    Rock Cutter Evaluation from Performance Curves: PDC Core Bits

    By Alfred W. Eustes III

    The first of a series on the evaluation of rock cutting tools, this paper discusses the results of full-scale laboratory drilling tests that compare the performances of several polycrystalline diamond

    Jan 1, 1998

  • NIOSH
    Rock Damage Characterisation From Microseismic Monitoring

    By P. L. Swanson, A. T. Iannacchione, W. J. Gale

    This paper outlines the concepts used to correlate rock failure with microseismic events and presents examples of microseismic monitoring together with associated computer modelling of the rock failur

  • ISEE
    Rock Drilling Automation as a Factor of Sustainability and Efficiency

    By Carlos Enrique Arroyo Ortiz, Jadir Pedro Alves

    This paper presents some of the results obtained during the research work about the use of technologies and digital transformation in the process of rock drilling in open pit mines. The use of automat

    Feb 6, 2023

  • ISEE
    Rock Drilling on a Vertical Wall: Problem solving at Crazy Horse Memorial

    By Jeff Hermanson

    Every construction project has site specific problems that need to be dealt with. These problems may be created by the geology, location, weather, time constraints, etc. Once these problems have been

    Jan 1, 1996

  • SAIMM
    Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold Mine

    By D. F. Malan, Y. Jooste

    "SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac

    Jan 1, 2015