Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A PC-Based Worker Scheduling System For Underground MinesBy R. L. Grayson
Following lip on a USBM-sponsored research project, the authors have utilized the knowledge-base structure and system concepts from the Sun Sparcstation-based worker scheduling system of the Mine Mana
Jan 1, 1996
-
Hydrologic Impacts Of Phosphate Gypsum Disposal Areas In Central FloridaBy T. M. Gurr
Large quantities of phosphate rock are mined and processed in Central Florida (Figure 1). The phosphate rock from the mines is further processed in "chemical plants" to produce phosphoric acid (Figure
Jan 1, 1990
-
Dielectric And Relaxation Time Characterization Of Bound Water On Hydrophilic And Hydrophobic SurfacesBy H. S. Puttanna
Bound water plays an important role in the processing and utilization of numerous materials and mineral processing systems. The fundamental nature of this near surface bound (vicinal) water is yet to
Jan 1, 1992
-
Spectroscopic, Flotation And Wettability Studies Of Alkyl And Allyl ThionocarbamatesBy R. S. Farinato
Thionocarbamate flotation reagents have enjoyed a niche position in the recovery of copper sulfides and activated sphalerites since their introduction in the mid 1950's (Harris, 1954). Thionocarb
Jan 1, 1993
-
Simplified Cost Models For Prefeasibility Mineral Evaluations (b557fcd9-b3e0-4a1b-bf9a-ab6d01c4d8a5)By T. W. Camm
The Bureau of Mines conducts studies of the economic impacts of regulations on federal lands. These studies are part of the Bureau Potential Supply Analysis (PSA) program. To meet the needs of these s
Jan 1, 1993
-
The Clean Air Act Amendments of 1990 -An Eastern Coal Producers ViewBy G. W. Luxbacher
With the advent of acid rain legislation included within the Clean Air Act Amendments of 1990, a great deal of uncertainty with regard to price, source and production quantities has been cast into the
Jan 1, 1992
-
Thiosorbic® Lime For FGD ProcessesDravo Corporation was founded in 1891 and has long been recognized as a major domestic engineering and construction firm headquartered in Pittsburgh. In 1977, Dravo had revenue of $852.2 million with
Jan 1, 1978
-
Bacteria In Hydrogeochemical ProspectingBy V. Price
Abstract: Action of certain strains of bacteria has been implicated as a significant factor in the oxidation of ore deposits. Other bacteria are thought to be significant in the formation of syngeneti
Jan 1, 1972
-
Open Pit Copper Mine Dewatering Using Production EquipmentBy Bryson D. Trexler
Slope stability in open pit mines is governed by rock structure, rock quality, ground water conditions, blasting, pit geometry and excavation method. Of these factors, the control of ground water pres
Jan 1, 1983
-
Centrifugal Dewatering and Reconstitution of Fine Coal: An Industrial Application of the GranuFlow Process to Column Flotation ConcentrateBy W. W. Wen
A continuous pilot-scale test of the GranuFlow Process was conducted using a screen- bowl centrifuge for the dewatering and reconstitution of column flotation concentrate at a coal preparation plant i
Jan 1, 1997
-
Arizona Conference Continues to Foster Camaraderie in the SouthwestBy Chee Theng
"It is not surprising that the most popular key takeaway from the Developing Diversity in Mining workshop (see box) held on the first day of the SME Arizona Conference in December was, “Have more part
Feb 1, 2019
-
Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022By Chris D. Breeds
Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align
Dec 1, 2022
-
Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe
Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl
Jun 13, 2021
-
An Improved Load Measuring Device for Underground Mining Standing SupportsBy B. Mirabile, B. Stables
Standing support is often used in conjunction with underground retreat mining. Knowledge of the load-displacement behavior of a standing support, and loading induced by the mine opening is critical to
Jan 1, 2019
-
Electrical Fault Detection On Downed DC Trolley LinesBy J. S. Peterson
The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll
Jan 1, 1997
-
Alternative Reductive Bleaching Process For KaolinBy E. S. Forbus
A process for producing reductive bleach in-situ in kaolin slurries has been developed. The bleach is formed by mixing an iron sponge powder (-325M) with slurry treated with SO2. The process has been
Jan 1, 1993
-
Friction Rock Stabilizers -A New Rock Reinforcement Method"By James J. Scott
In the fall of 1976 the author started test work with Friction Rock Stabilizers in uranium mines of the West, principally in the Ambrosia Lake and Churchrock districts of New Mexico. Tests were also c
Jan 1, 1977
-
A Database Application For Long Term Production Scheduling At LKAB's Kiruna MineBy Mark Kuchta
A new database application for long term production scheduling has been developed for LKAB's Kiruna mine. The scheduler uses a new block data structure whereby the monthly production data for thr
Jan 1, 2002
-
Reagent Development in the 90's - A PerspectiveBy M. J. Virnig, G. A. Kordosky
Throughout time, the mining industry has been very successful in meeting the world's requirements for metals and materials while meeting the challenges of decreasing ore grades and increased emph
Jan 1, 1994
-
Wet Screening Operations At Freeport Indonesia's Copper ConcentratorBy C. H. Sheerin
Remotely located in the jungle near mount Puncak Jaya [16,500 ft (5,030 my), Irian Jaya, Indonesia rests Freeport's Indonesian copper mining operation. Shortly after start up of Freeport's c
Jan 1, 1993