Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis And Modeling Of Longwall Face-To-Face TransfersBy C. Patrick
Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer
Jan 1, 1993
-
Mine Planning At Newmont GoldBy S. P. Winkelmann
The expansion in gold production in the Carlin 'Trend over the last few years has been one of staggering proportion. To increase gold production while minimizing capital requirements and providin
Jan 1, 1990
-
The Nitric Sulfuric Leach Process For Recovery Of Copper From ConcentrateBy H. M. Brennecke
A new hydrometallurgical process has been developed to recover copper from sulfide ores. Copper is leached in a staged reactor system utilizing nitric and sulfuric acids at 105°C. Iron is removed from
Jan 1, 1978
-
Genetic Relationship Of The Andersonville, Georgia And Eufaula, Alabama Bauxitic Kaolin AreasBy John F. Burst
For several generations now, the high alumina clayey sediments of Southeastern Alabama and Southwestern Georgia have supplied those regions with steady, mineral-based income although the impact of tha
Jan 1, 1972
-
Applied Seismic Monitoring for Decision Making in Deep Hard Rock Mines - RASIM 2022By Brad Simser
Several case histories from Glencore’s Sudbury Operations show how passive seismic monitoring data is used for geotechnical decision making. The data comes from three different seismic arrays monitori
Apr 26, 2022
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Meeting The Challenge Of The 80's - Cost Reduction Measures At The Iron Ore Company Of Canada's Carol Project 1980-85By I. A. Tinto
Labrador City is located in the southwestern portion of Newfoundland-Labrador, approximately 965 kilometers north-east of Montreal. The mine and beneficiation complex of the Iron Ore Company of Canada
Jan 1, 1985
-
Real‑time Photoacoustic Measurements of the Mass Concentration of Respirable Crystal Silica Dust: TheoryBy Charles Kocsis, Pedro Nascimento, W. Patrick Arnott, Samuel J. Taylor
Respirable crystalline silica (RCS) is an inhalation health hazard for mining and industrial work environments and must be monitored. We provide theoretical analysis of real-time measurements for dete
Jul 31, 2022
-
Augmented Reality Platform for the Unmanned Mining Process in Underground MinesBy Ji Fang, Chong Fan, Fengrui Wang, Dongxin Bai
Unmanned mining technology in underground mines offers high efficiency, safety, and low cost. However, ground operators face challenges in accurately perceiving the underground environment through vid
Jan 30, 2022
-
San Francisco Downtown Rail Extension Project: Evolution of Mined Tunnel Construction Approach and Design - RETC2023By Meghan Murphy, Yiming Sun, Kush Chohan
DTX is a 1.3-mile-long rail extension being constructed by Transbay Joint Powers Authority to extend Caltrain rail service and future California High Speed Rail service to downtown San Francisco. It i
Jun 13, 2023
-
Determination Of Friction Factor For Kentucky's Coal MinesA knowledge of airway friction factor (K-factor) is necessary to designing mine ventilation systems for least cost and optimum effectiveness. The friction factor used must be accurate and reliable to
Jan 1, 1991
-
Destabilization Mechanism and Prevention Technology of Open‑Pit Mine Slope with Soft Interlayer Under Rainfall Infiltration Conditions: A Case Study - Mining, Metallurgy & Exploration (2024)By Xinghai Lei, Yuqi Shang, Guiming Li, Lu He
There are many factors affecting the stability of open-pit mine slopes, among which slopes with soft interlayers have become an important factor inducing deformation and instability due to their poor
Feb 20, 2024
-
The Pinon Pine IGCC Project: Coal And The Role Of Advanced, Coal-Fired Electric Power Generation PlantsBy J. W. Motter
Currently, virtually all new electric power generation systems under construction are designed with natural gas as the primary fuel. Factors driving these construction decisions involve sustained low
Jan 1, 1996
-
Development Of High Productivity Shotcreting At The Cannon MineBy J. Baz-Dresch
A custom-designed shotcrete system, consisting of an 8-m3 (10-cu-yd) transit mixer and a shotcrete spray boon carrier, is used by a two-man crew to transport and place up to 25 m3 (32 cu-yd) of steel
Jan 1, 1992
-
High-Confidence Flotation Testing At Xstrata Process SupportBy N. O. Lotter
The reliability of a set of flotation results is key to minimizing project risk, either at the commissioning of a concentrator or at the point of implementing an improvement to an existing concentrato
Jan 1, 2010
-
Evaluation of Post-Blast Re-Entry Times Based On Gas Monitoring of Return AirBy L. Yuan, J. H. Rowland, R. A. Thomas, D. Bahrami
Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o
Jan 1, 2019
-
The Future Of Solution And In-Situ Mining Restoration ? IntroductionBy R. Jacobson
This paper presents comparison of proposed future solution and in-situ mining methods for in-situ leaching and recovery of uranium, gold, silver, and copper. We propose to show that in the future new
Jan 1, 1987
-
Geology And Mineralization At The San Andres Mine, HondurasBy M. D. Johnson
The San Andres mine, located in the western mountain region of Honduras, Central America, contains epithermal gold mineralization as disseminations, in quartz-chalcedonic veins and stockworks. Host ro
Jan 1, 1993
-
Gold Heap Leach Simulation And Optimization Using A Multiphysics ModelBy S. Garcia
The Minera Yanacocha operation presents various operating challenges, due to the complex structure of several heaps interconnected with ponds and gold recovery plants. A comprehensive process model ha
Jan 1, 2010
-
Mining And EnvironmentCVRD was established on June 01, 1942, during the Second World War, through an agreement between Brazil, the United States and the United Kingdom, to produce 1.500.000 tons/year of iron ore from Itabi
Jan 1, 1994