Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Advanced Technical Studies for Tunnel Enlargement in Hong KongBy Vincent Tricot, Daniel Altier, Roger Storry
"INTRODUCTION The Liantang / Heung Yuen Wai Boundary Control Point (BCP) project, located in the north-east New Territories of Hong Kong, will form the seventh land crossing between the Hong Kong Spec
Jan 1, 2016
-
Content and Structure of a Plant Grinding Management SystemThe Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant project, with verifiable ci
Feb 23, 2014
-
The Impact Of Conversion On The Coal IndustryBy James R. Garvey
The impact of conversion on the coal industry can be summarized very briefly: We are going to have to mine an awful lot of coal. Fortunately, the United States has the coal reserves available, and giv
Jan 1, 1972
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
The Eco mining Platform Accomplishment For The Promotion Of Romanian Research And Innovation PotentialBy Gy. Deák Deák
The ECOMINING platform aims to develop a scientific and technical organization in order to promote within the natural resources industry a framework for environment-friendly exploitation technologies
Jan 1, 2007
-
Capitalization: Bolivia's Innovative Approach for Privatization, the Vinto CaseBy William P. Blacutt
This paper describes the strategy, the struggles, and the obstacles encountered during the last two years in the ongoing process to capitalize Vinto. The effort involves the offering of a vertically i
Jan 1, 1998
-
Philex- Bulawan And Sibutad Gold Heap Leach Operations With Agglomeration - Philippines' Biggest Dedicated Pads In Negros Occidental And Zamboanga Del NorteBy Libby R. Ricafort, Nonato S. Retardo, Jose B. Anievas
This paper shows the metallurgical test results that led to the design of the heap leach facilities of Philex Mining Corporation. The design incorporates a water management model as process solution c
Jan 1, 1996
-
The Production of Zero Carbon Emission Pig Iron with the E-Iron Process - SME Annual Meeting 2025By John J. Simmons
There is considerable interest in the iron and steel industry in the development of technologies that can reduce carbon dioxide emissions, as the iron and steel industry is the third largest producer
Feb 1, 2025
-
The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of TrafficBy Saverio Agresti, Giuseppe Lunardi, Donato Basta, Roberto Trapasso
"At a distance of 10 years from the first application of the Nazzano Method, the widening under traffic of a tube of an existing motorway tunnel was realized near Ancona, along the A14 Motorway in Ita
Jan 1, 2016
-
NASA’s LUNAR ICE-MINING COMPETITION - SME Annual Conference 2023By D. Meadows, P. Carrato, E. Wingate, K. Churchill
Extracting lunar ice, to be processed into pure water or hydrolyzed into oxygen and hydrogen, faces many challenges. On the Moon icy-regolith deposits that contain up to 10% water are found within Per
Feb 1, 2023
-
Mine dewatering and water management at Barrick Goldstrike Mine in the Carlin Trend, NV - SME Transactions 2011By B. Listerud, G. Zhan, M. A. Jones
Barrick Goldstrike Mines Inc. (BGMI) operates the Betze-Post openpit and the Meikle and Rodeo underground mines. Because the majority of the orebody is located below the water table, mining at BGMI re
Jan 1, 2011
-
Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013By A. Jennings, J. Cornet, P. Perrone
Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi
Jan 1, 2013
-
The Roles Of Lithology And Excavation In The Triggering Of Seismic Repeaters In A Deep Mine - RASIM 2022By Bernard P, Lhoumaud E, Gunzburger Y, Conin M, De Santis F, Kinscher J
Seismic repeaters are commonly observed in natural fault zones dominated by slow aseismic motion. The corresponding seismic signal, characterized by highly similar wave forms, is usually interpreted a
Apr 26, 2022
-
Steady State, Groundwater Inflows in Deep Rock Tunnels - RETC2021By MARK J. VANARELLI
Estimating groundwater inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies for estimating ste
Jun 13, 2021
-
Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - IndiaBy Rakesh Sehgal, Pushkar Verma, Mohit Sharma
"SJVN Limited successfully commissioned its Rampur HEP (412 MW) in 2014. The project has been planned to operate in tandem by directly utilizing the Tail Water of SJVN’s prestigious Nathpa Jhakri Hydr
Jan 1, 2016
-
Rock Sand And Gravel Resources ?Strong---But Challenged" ? Introduction:By Don Reining
The sand and gravel industry in Southern California has made a sizeable contribution to the construction development of the 15 County area in this part of the State. Facing this mineral extraction
Jan 1, 1967
-
Experiences with Spray Applied Waterproofing Membranes - Experiences and investigations with a EVA based membrane in a tunnel environmentBy Karl Gunnar Holter, Frank Clement
"INTRODUCTION Typically waterproofing of conventionally excavated tunnels has been done by installing pre-fabricated sheet membranes between the primary temporary support lining and the secondary perm
Jan 1, 2016
-
Developing Functional BaselinesBy William W. Edgerton
Establishing geotechnical baselines on soft ground projects that require the use of closed-face tunnel boring machines (TBMs) is difficult. It is hard to see the face when mining and the excavated mat
Jan 1, 2012
-
An Integrated Approach For Predicting Mining Subsidence In Hilly TerrainBy Y. Luo
Based on the concept of slope stability analysis, a formula for determining an important parameter required in the mathematical model for the prediction of mining subsidence in hilly terrain has been
Jan 1, 1998
-
The Effect and Measurement of Horizontal Stress in an Underground Limestone MineBy David Newman
"Horizontal stress can have a profound effect on the stability of an underground limestone mine. The presence of horizontal stress is usually determined once the mine has been developed and the orient
Jan 1, 2019