High-resolution Satellite Imagery For Mineral Resource Evaluation And Mine ManagementBy Dewey W. Marino
Conventional remote sensing applications for the exploration of natural resources has largely been the domain of low resolution Earth orbiting systems such as Landsat™ which can sample a broad range
Jan 1, 1998
-
Indicators For Sustainability Assessment And ReportingBy V. Carabias-Hütter, A. J. Basu
The paper aims at promoting sustainability assessment and reporting into practice using a globally acceptable set of guidelines and a common framework for internal and external reporting at a project/
Jan 1, 2004
-
Long Term Performance of the Nickel Rim Reactive Barrier: A SummaryBy Shawn Benner, David Blowes, Carol Ptacek
A full-scale reactive barrier was installed into an aquifer impacted by acid mine drainage in August 1995 at the Nickel Rim mine site near Sudbury, Ontario. The primary mechanism of water quality impr
Jan 1, 2000
-
Estimating Tunneling Costs Using An Interactive Computer ModelBy William E. Little, William R. Sharp, Edward R. Kennedy
Cost o f mechanical tunneling requires the knowledge of many machine/rock parameters such as rock types, machine power, penetration rate, cutter life, maintenance schedule, etc. Capital investment, la
Jan 1, 1983
-
Steep slope stabilization for reclaimed terrainBy K. C. Vories, C. D. Elifrits, F. F. Haston
The required reclamation of land disturbed by surface coal mining often results in the creation of some oversteepened slopes that are prone to rapid erosion and sediment production. This natural activ
Jan 1, 1987
-
The Evaluation Of Dust Exposure To Truck Drivers Following The Lead Haul TruckBy Wm. Randolph Reed, John A. Organiscak
Haul trucks have the potential to generate large amounts of respirable dust. This respirable dust has been shown to be a health hazard to personnel, especially if it contains a high silica content.
Jan 1, 2005
-
Seismic Determination Of Geological Discontinuities Of Rapid ExcavationBy S. Barkhoudarian, R. R. Gupta, R. F. Steinberg
A study of the feasibility of using acoustic signals to detect discontinuities ahead of excavation has shown that reflecting interfaces in a homogeneous rock can be easily identified. Moreover, discon
Jan 1, 1997
-
Real time psychrometric data collectionBy K. H. McDaniel
Eight mine weather stations (MWSs) installed at the Waste Isolation Pilot Plant (WIPP) to monitor the underground ventilation system are helping to simulate real time ventilation scenarios. Seasonal w
Jan 1, 1999
-
A Linear Programming Approach To Mine Scheduling Optimization - IntroductionBy Mark Gershon
This paper describes a linear programming (LP) application that schedules mining operations in an optimal manner. The model is developed such that it can be applied to a broad spectrum of mining activ
Jan 1, 1982
-
Methane Occurrences In The Carsington Aqueduct Tunnel Project – A Case StudyBy Julian S. Edwards, C. Frederick C. Pearson, Sevket Durucan
Information gained at the site investigation stage of the Carsington aqueduct project led the designers to suspect that methane might be encountered during tunnelling and therefore gas detection techn
Jan 1, 1989
-
Controlling rib stability in high coal seamsBy W. C. Smith
Even with conservative mine planning, rib instability can progress from a nuisance to a major safety hazard. This Bureau of Mines paper examines the mechanisms of progressive rib failure in high mine
Jan 1, 1991
-
Closure risk factor - a simple model for optimizing mine closure outcomesThe issues involved in mine closure are usually complex, and the risks are significant. Although environmental risks are paramount, other issues such as safety, community, legal, fiscal and technical
Jan 1, 2002
-
Placer SamplingBy Joseph J. Wojcik
INTRODUCTION A great deal more is involved in a sampling effort directed at a placer deposit than physically capturing a quantity of representative material and extracting the desired component. The
Jan 1, 1992
-
Going Hard at Soft Ground in Buenos AiresBy Stephen P. E. Redmond
A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operati
Jan 1, 1999
-
A Numerical Modeling Approach for Assessment of Seepage Characteristics and Performance of Protective Water Barrier Pillars in Underground Coal MinesBy S. K. Sharma, ANKUSH GALAV, G. S. P. Singh
Providing a suitable protective water barrier pillar (PWBP) is common to reduce inundation hazards in underground coal mines. The imperative factors influencing its performance include the water head
Aug 18, 2022
-
Mine Closure: Plan For The End From The BeginningBy Hugh Jones
Mine planners are challenged to hold two seemingly opposing objectives: maximizing the mine?s operational efficiency while minimizing post-closure impacts. One of the most effective approaches to meet
Jan 1, 2011
-
Reagent Manufacture At Nevada Mines Division ? IntroductionBy J. J. Harrington
Manufacture and mixing of flotation reagents at the mill site provides an economic and convenient method of maintaining a continuous and fresh supply of reagents for concentrator operations. Kennecott
Jan 1, 1976
-
Statistically Based Estimates Of Uncertainty Of Coal Resources By Bed And Zone For The USGS National Coal Resource AssessmentBy J. H. Schuenemeyer
Uncertainty estimates on coal resources were computed as part of the U.S. Geological Survey’s National Coal Resource Assessment study of more than 60 coal beds and zones in the Appalachian Basin, the
Jan 1, 2001
-
Managing Cyclones: A Valuable Asset the Copper Mountain Case Study (44830731-0f7b-4606-82e1-1422dec82d1f)By M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney
"The Copper Mountain Mine is located in Princeton British Columbia, Canada and produces 80 – 90 million pounds of copper annually, as well as gold and silver by-products. The ore processing plant has
Jan 1, 2015
-
Reducing the fire and explosion hazards of flame-cutting and welding in underground coal minesBy W. D. Monaghan
One of the major ignition sources of fires and explosions in underground U.S. coal mines is flame cutting and welding. On May 20, 2006, a flame-cutting operation at the Darby Mine No. 1 led to an exp
Jun 1, 2010