    High-resolution Satellite Imagery For Mineral Resource Evaluation And Mine Management

    By Dewey W. Marino

    Conventional remote sensing applications for the exploration of natural resources has largely been the domain of low resolu­tion Earth orbiting systems such as Landsat™ which can sample a broad range

    Jan 1, 1998

  • SME
    Indicators For Sustainability Assessment And Reporting

    By V. Carabias-Hütter, A. J. Basu

    The paper aims at promoting sustainability assessment and reporting into practice using a globally acceptable set of guidelines and a common framework for internal and external reporting at a project/

    Jan 1, 2004

  • SME
    Long Term Performance of the Nickel Rim Reactive Barrier: A Summary

    By Shawn Benner, David Blowes, Carol Ptacek

    A full-scale reactive barrier was installed into an aquifer impacted by acid mine drainage in August 1995 at the Nickel Rim mine site near Sudbury, Ontario. The primary mechanism of water quality impr

    Jan 1, 2000

  • SME
    Estimating Tunneling Costs Using An Interactive Computer Model

    By William E. Little, William R. Sharp, Edward R. Kennedy

    Cost o f mechanical tunneling requires the knowledge of many machine/rock parameters such as rock types, machine power, penetration rate, cutter life, maintenance schedule, etc. Capital investment, la

    Jan 1, 1983

  • SME
    Steep slope stabilization for reclaimed terrain

    By K. C. Vories, C. D. Elifrits, F. F. Haston

    The required reclamation of land disturbed by surface coal mining often results in the creation of some oversteepened slopes that are prone to rapid erosion and sediment production. This natural activ

    Jan 1, 1987

  • SME
    The Evaluation Of Dust Exposure To Truck Drivers Following The Lead Haul Truck

    By Wm. Randolph Reed, John A. Organiscak

    Haul trucks have the potential to generate large amounts of respirable dust. This respirable dust has been shown to be a health hazard to personnel, especially if it contains a high silica content.

    Jan 1, 2005

  • SME
    Seismic Determination Of Geological Discontinuities Of Rapid Excavation

    By S. Barkhoudarian, R. R. Gupta, R. F. Steinberg

    A study of the feasibility of using acoustic signals to detect discontinuities ahead of excavation has shown that reflecting interfaces in a homogeneous rock can be easily identified. Moreover, discon

    Jan 1, 1997

  • SME
    Real time psychrometric data collection

    By K. H. McDaniel

    Eight mine weather stations (MWSs) installed at the Waste Isolation Pilot Plant (WIPP) to monitor the underground ventilation system are helping to simulate real time ventilation scenarios. Seasonal w

    Jan 1, 1999

  • SME
    A Linear Programming Approach To Mine Scheduling Optimization - Introduction

    By Mark Gershon

    This paper describes a linear programming (LP) application that schedules mining operations in an optimal manner. The model is developed such that it can be applied to a broad spectrum of mining activ

    Jan 1, 1982

  • SME
    Methane Occurrences In The Carsington Aqueduct Tunnel Project – A Case Study

    By Julian S. Edwards, C. Frederick C. Pearson, Sevket Durucan

    Information gained at the site investigation stage of the Carsington aqueduct project led the designers to suspect that methane might be encountered during tunnelling and therefore gas detection techn

    Jan 1, 1989

  • SME
    Controlling rib stability in high coal seams

    By W. C. Smith

    Even with conservative mine planning, rib instability can progress from a nuisance to a major safety hazard. This Bureau of Mines paper examines the mechanisms of progressive rib failure in high mine

    Jan 1, 1991

  • SME
    Closure risk factor - a simple model for optimizing mine closure outcomes

    The issues involved in mine closure are usually complex, and the risks are significant. Although environmental risks are paramount, other issues such as safety, community, legal, fiscal and technical

    Jan 1, 2002

  • SME
    Placer Sampling

    By Joseph J. Wojcik

    INTRODUCTION A great deal more is involved in a sampling effort directed at a placer deposit than physically capturing a quantity of representative material and extracting the desired component. The

    Jan 1, 1992

  • SME
    Going Hard at Soft Ground in Buenos Aires

    By Stephen P. E. Redmond

    A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operati

    Jan 1, 1999

  • SME
    A Numerical Modeling Approach for Assessment of Seepage Characteristics and Performance of Protective Water Barrier Pillars in Underground Coal Mines

    By S. K. Sharma, ANKUSH GALAV, G. S. P. Singh

    Providing a suitable protective water barrier pillar (PWBP) is common to reduce inundation hazards in underground coal mines. The imperative factors influencing its performance include the water head

    Aug 18, 2022

  • SME
    Mine Closure: Plan For The End From The Beginning

    By Hugh Jones

    Mine planners are challenged to hold two seemingly opposing objectives: maximizing the mine?s operational efficiency while minimizing post-closure impacts. One of the most effective approaches to meet

    Jan 1, 2011

  • SME
    Reagent Manufacture At Nevada Mines Division ? Introduction

    By J. J. Harrington

    Manufacture and mixing of flotation reagents at the mill site provides an economic and convenient method of maintaining a continuous and fresh supply of reagents for concentrator operations. Kennecott

    Jan 1, 1976

  • SME
    Statistically Based Estimates Of Uncertainty Of Coal Resources By Bed And Zone For The USGS National Coal Resource Assessment

    By J. H. Schuenemeyer

    Uncertainty estimates on coal resources were computed as part of the U.S. Geological Survey’s National Coal Resource Assessment study of more than 60 coal beds and zones in the Appalachian Basin, the

    Jan 1, 2001

  • SME
    Managing Cyclones: A Valuable Asset the Copper Mountain Case Study (44830731-0f7b-4606-82e1-1422dec82d1f)

    By M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney

    "The Copper Mountain Mine is located in Princeton British Columbia, Canada and produces 80 – 90 million pounds of copper annually, as well as gold and silver by-products. The ore processing plant has

    Jan 1, 2015

  • SME
    Reducing the fire and explosion hazards of flame-cutting and welding in underground coal mines

    By W. D. Monaghan

    One of the major ignition sources of fires and explosions in underground U.S. coal mines is flame cutting and welding. On May 20, 2006, a flame-cutting operation at the Darby Mine No. 1 led to an exp