Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
Spotlight on Athel pines growing on slimes dumpsBy W. K. Brinsden
In August 1965, the late Mr Alan Smith, then Mill Superintendent at Gold Mines of Kalgoorlie (GMK), Australia, asked me to investigate the planting of vegetation on the GMK slimes dams in order to eas
Jan 1, 1991
-
Review of Gold Reef Sampling and its Impact on the Mine Call Factor"Sampling error and bias, especially the Increment Preparation Error (IPE), are introduced when the tool allocated to do the job fails to extract a representative sample. This is the case with chip sa
Jan 1, 2016
-
Soil Reconstitution As A Key Driver For Successful Rehabilitation At Hillendale Mine - IntroductionBy I. Beukes, H. Kotze, B. Krause, R. P. Hattingh
Hillendale Mine is operated by Exxaro KZN Sands, and is situated on the north coast of KwaZulu-Natal in South Africa near the towns of Empangeni and Richards Bay, some 200 km north of Durban. During t
Jan 1, 2007
-
Green Topics - Iscor's Heavy Minerals Project ApprovedThe Iscor Board has given its Mining Division the authority to proceed with detail engineering and design for a Heavy Minerals Project which comprises a mine in Northern Province near Gravelote, a min
Jan 1, 1996
-
Notices Confrrence On Computrrs In EngineeringBy NIM REPORTS
Notices CONFRRENCE ON COMPUTRRS IN ENGINEERING The above Conference, which is being organized by the Electrical and Electronics Board of the Institution of Engineer!!, Australia, ill to be held in Syd
Jan 9, 1973
-
A Long Hole Stoping System For Mining Narrow Platinum Reefs - IntroductionBy P. van Dorssen
In South African metalliferous mines, stoping operations are largely confined to narrow, tabular orebodies making mechanization extremely difficult. Limited flexibility in terms of stope width has nec
Jan 1, 2002
-
Modelling And Assessment Of The Long-Term Leachate Generation Potential In Deposits Of Ferro-Chromiun SlagsThe environmental impact of solid waste materials is closely linked to their potential to produce a hazardous leachate once deposited in a landfill. This potential is conventionally assessed with simp
Jan 1, 2000
-
Monitoring The Effect Of Irrigation With Gypsiferous Mine Wastewater On Crop Production Potential As Affected By Soil Water And Salt BalanceBy N. Z. Jovanovic
Irrigation of agricultural crops may be a cost-effective option for the utilization of gypsiferous minewater as it may also create an opportunity to produce crops during the dry winter season on farm
Jan 1, 2004
-
Soil quality as a key success factors in sustainable rehabilitation of kimberlite mine waste - SynopsisBy P. W. van Deventer
?Soil quality is the capacity of a soil to function, within ecosystem and land use boundaries, to sustain biological productivity, maintain environmental quality, and promote plant, animal and human h
Jan 1, 2008
-
The Use And Applicability Of Flow Models To Quantify Intermine Flow In The Western Witbank CoalfieldsAfter the closure of collieries, they naturally start to fill up with water. As a result, hydraulic gradients develop between them and different hydraulic pressures are exerted onto peripheral areas o
Jan 1, 2005
-
Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System ? Synopsis (cd7f692e-c8f8-43df-8e10-650656e74357)By N. Hanief
This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per
Jan 1, 2012
-
Raw Material and Process SamplingBy Maggi Loubser
"In a technologically advanced era, where process control is accurately maintained within the smallest error margins, and accuracy and precision are continuously improved, sampling is still left to th
Jan 1, 2014
-
Use of 'Artificial Intelligence' in Open-pit MiningBy H. Brüggemann
The exploration of deposits generates geological data which are suitable for creating a preliminary tectonic and stratigraphic model. Linked with the topographical map and analysis data from explorati
Jan 1, 1987
-
SPOTLIGHT on 'Ferrous Pyrometalurgy: A Chalenge for South AfricaThe Technical Programme Committee-Metals Technology of The South African Institute of Mining and Metallurgy, in association with its Vaal Triangle Branch, held a one-day colloquium on 18th April, 1989
Jan 1, 1989
-
Iron ore tailing, beneficiation – a potential resource for future V. Shukla, C.R. Kumar, D.P. Chakraborty, U. Shivangi, and J. DuBy J. Du, V. Shukla, C. R. Kumar, U. Shivangi, D. P. Chakraborty
During the processing of iron ores, a large quantity of low-grade tailings containing abundant iron values in fine particle size range is produced. Due to the increasing demand in the high-grade ores
Jan 1, 2020
-
Who is a Competent Person?By T. R. Marshall
SAMREC (The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves) Clause 7 notes that ‘Documentation detailing Exploration Results, Mineral Resources and
Sep 1, 2021
-
Open-pit post-blast dust cloud lightningBy N. C. Steenkamp
Lightning has been observed in dust clouds following open-pit blasting. It is proposed that the occurrence of this phenomenon is related to the physical composition and characterization of the mineral
Apr 14, 2024
-
The Age Of Intelligence. Online Diagnostic And Automated Maintenance PlanningBy A. Marek
Reduced downtime and maximized availability of mining machines are the key factors in optimizing production rates. As technology moves industry towards an age of ?intelligent machines? it sets the fou
Jan 1, 2012
-
A Proposed Method of Dynamic Ore Reserve Assessment for a Caving System of MiningBy A. F. Spinks, S. P. Nicholls
"The Lower Orebody at Chingola Division of Nchanga Consolidated Copper Mines, Limited, is a stratified orebody that is mined by a continuous caving system. The accurate determination of the developed
Jan 1, 2014