    A Blasting-induced vibration control approach for resuming blasting activity near tailing dams in the Quadrilátero Ferrifero region after “Brumadinho Dam Colapse”.

    By Marcus Neves, Eventomar Junior, Adilson Castro, Leandro Silveira, Sérgio Augusto

    The collapse of the Vale S.A. mining tailings dam in 2019, a tragic event that shook Brazil and the world, had consequences that transcended the immediate pain and devastation. Among them, the suspens

    Jan 21, 2025

  • ISEE
    Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems

    By Bruce Vandenberg, R. Frank Chiappetta, John Foley

    Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of

    Jan 1, 2000

  • ISEE
    Analysis of Air Blast Overpressures within a Negative Pressure Boundary

    By Frederick B. Kuhnow

    Harmonic energetic delamination of T2 building is being considered for demolition at a formerly known atomic lab. The T2 building is within a containment structure that is under a negative pressure of

    Jan 1, 2017

  • ISEE
    Gradation Control Using Low Density Bulk Emulsion

    By Adam T. Young

    This paper will describe the process of using low density bulk emulsion as a means to maximize the production of an oversize or “rip rap” aggregate size range (8 inch to 72 inch) that the quarry custo

    Jan 1, 2017

  • ISEE
    Correlation of Measurement-While-Drilling Parameters to Fragmentation

    By Kain Petterson, P D. Katsabanis

    Blast fragmentation, determined using image analysis was correlated to drill monitoring parameters in an open pit operation. Average fragment size and 80% passing size showed strong correlation with s

    Jan 1, 2013

  • ISEE
    Violence Factor – The New Tool for Blast Performance Analysis

    By Dr. Calvin J. Konya, Anthony Konya

    Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,

    Feb 1, 2020

  • ISEE
    Violence Factor – The New Tool for Blast Performance Analysis

    By Dr. Calvin J. Konya, Anthony Konya

    Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,

  • ISEE
    The Truth About Signature Hole Method

    By Thierry Bernard

    Since the signature hole method principle has been described in the 80's, there has always been a lot of controversy about it. The theory is easy to understand but when it comes to apply it for predic

    Jan 1, 2012

  • ISEE
    Comparison of Traditional Signature Hole Technique and Monte Carlo Approach

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    Analysis of Annual-Delayed Successive (4D) Geophysical Charges in a Borehole

    By D. Preece

    The mining and oil industry employs techniques such as geologic mapping, core drilling and electromagnetic and potential field techniques to explore for new deposits. Since new discoveries of major ne

    Jan 1, 2011

  • ISEE
    The Possibility of use of the Electronic Initiation Systems in Slovene Mining Industry

    By Julijan Bratun, Joze Kortnik

    Production of technical stone is an important economic branch in Slovenia. In 2009, we had 95 dolomite quarries, 27 limestone and 6 silicates quarries, according to the Ministry of Economic Affairs. T

    Jan 1, 2011

  • ISEE
    Performing decking with the use of an inflatable plug in high or total submergence applications in blastholes to improve final wall profile & stability

    By Glenn Tobin

    The overarching goal in modern drill and blasting operations is that of optimising mining operations to achieve higher levels of productivity, safety, profitability and sustainability. Air decking, a

    Jan 1, 2012

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    Prototype of MEMS-based Accelerometric Network for Continuous Monitoring of Blasting Efficiency and Seismic Velocities

    By M. Szumny, P. Mertuszka, K. Fuławka

    Mining-induced seismicity is one of the adverse side effects of mining with the use of explosives at great depths. Disturbance of the primary stress state by the development of the network of excavati

    Jan 1, 2024

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Delineating Extent of Cracks in Post-Blast Rock Surface Using GPR – A Case Study

    By Sayantan Chakraborty, Kaushik Dey, SaKaushik Dey tyabrata Behera

    Drilling and blasting is a popular excavation technique in the drift of underground mine. Faster completion of drift reduces the gestation period and thus longer blast pulls are attempted with longer

    Jan 1, 2019

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    Monte Carlo Approach to Signature Hole Analysis

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    Measuring Blast Fragmentation by Analyzing Shovel Bucket Contents

    By Hairong Zeng, Shahram Tafazoli, Edmond Chow

    Blast fragmentation is one of the main parameters for optimizing mineral processing, but reliable data is difficult to acquire, resulting in unpredictable performance and efficiency. Crusher and grind

    Jan 1, 2011