    Applying The Carbon Hierarchy To Geotechnical Contractors

    By J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer

    There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low

    May 1, 2022

  • DFI
    Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall

    By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye

    "Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta

    Jan 1, 2015

  • DFI
    Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.

    By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney

    The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke

  • DFI
    Anchored Hollow Bar Tangent Pile System For Underpinning

    By Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin

    This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a

    Oct 1, 2022

  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • DFI
    Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane Tests

    By John Erikson, Alan J. Lutenegger, Nicholas Williams

    "In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida

    Jan 1, 2017

  • DFI
  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • DFI
  • DFI
    New Focus: Environmental Impact Reduction of Proper Slurry Waste Management

    By Zachary Q. Maassen

    The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p

    Jan 1, 2018

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program

    By William Billiet

    "The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp

    Jan 1, 2017

  • DFI
    The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.

    By W. G. K. Fleming

    The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and

    Jan 1, 1999

  • DFI
    State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation Construction

    By Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.

    Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita

    Sep 1, 2022

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Systematic Laboratory And Field Study On The Shear Resistance Of The Soil-Concrete Interface Of Diaphragm Walls And Bored Piles

    By Matthias Pulsfort, Jiarui Du, Torsten Wichtmann, Achim v. Blumenthal, Diethard König, Rowena Verst

    The influence of the interaction between support fluid and soil, e.g., filter cake formation, on the shear stress transfer in the soil-concrete interface of diaphragm walls and bored piles is still co

    May 1, 2022

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010