Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Factors affecting the viability of Canada's copper producersBy W. J. S. Craigen, G. E. Wittur
"In the context of today's continuously changing world, there are many factors which must be considered when attempting to assess the ability of Canada's primary copper producers to remain c
Jan 1, 1986
-
Simulators for the Design, Optimization and Control of Gold Ore Processing PlantsBy L. R. P. de Andrade Lima, D. Hodouin
The paper presents a survey of the possibilities of the simulation techniques for improving the design and operation of gold processing plants. The procedure to construct kinetic models that are used
Jan 1, 2005
-
Hydrometallurgical Recovery of Zinc, Manganese and Lead from Pyrometallurgy SludgeBy J. -F. Blais, M. -O. Simonnot, J. Mocellin, G. Mercier, J. -L. Morel
Large quantities of ferromanganese sludge are generated as waste material by blast furnace during the manufacturing of ferromanganese. These slags are very rich in manganese, zinc and lead (5 to 40 %)
Jan 1, 2015
-
FRP Challenges and Applications in Metals ProcessingBy Rafic Moubarac
FRP (Fiberglass Reinforced Polyester) equipment has been used in different and several applications during metals processing and extraction, and the hydrometallurgical process. Case histories of such
Jan 1, 2015
-
Improving Mine/Mill Water Network Design by Reducing Water and Energy RequirementsBy M. Veiga
"Mining is an energy and water intensive activity. Increasing energy efficiency and reducing water consumption are two of the key requirements in moving toward a more sustainable mining industry. Wate
Jan 1, 2010
-
Frother Structure-Property Relationship: Effect of Polypropylene Glycol Alkyl Ethers on Bubble Rise VelocityBy James A. Finch, Yue Hua Tan, Wei Zhang
"The paper is part of our study of the frother structure-property relationship using bubble rise velocity. Single bubble rise velocity profiles were determined in a 350 cm column for surfactants from
Jan 1, 2016
-
Optimization of the Operation of Hot StovesBy Henrik Saxén, Mikko Helle
The operation of hot stoves used for preheating the blast in the ironmaking blast furnace has a strong effect on the consumption of reductants, economic performance of and CO2 emissions from the steel
Jan 1, 2015
-
Diamonds in CanadaBy J. J. Brummer
The possibility of diamonds occurring in Canada was first raised by W. H. Hobbs in 1899, who concluded: "that the apex of the fan of diamond distribution probably lies somewhere in the strip of the t
Jan 1, 1978
-
The Tectonic, Magmatic and Mineralization History of the Sudbury StructureBy Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh
Jan 1, 1997
-
The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned
Jan 1, 1997
-
Electrical Generation and Operating Costs at Cassiar's Power PlantBy A P. Powell
This paper deals with the power plant at Cassiar Asbestos Corporation Ltd., Cassiar, B.C. It discusses the units installed in the plant, the distribution of power and the costs involved. The efficienc
Jan 1, 1965
-
Treatment of Once Rejected Material – Investigating the Recovery of Cassiterite from Tailings Disposals Using Different Flotation MethodsBy M. Rudolph, T. Leißner, TU Bergakademie Freiberg, C. Mämpel, R. Möckel, M. Embrechts, T. Leistner
Tin-mining activities have taken place in the region of the German Erzgebirge (Ore Mountains) for over hundreds of years up until 1991. For long times, gravity separation processes used to be the domi
Jan 1, 2016
-
Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold ClimatesBy T. R. Wildeman
"At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,
Jan 1, 1992
-
Improving Ventilation at Hoyle Pond Mine with Monitoring and Control SystemBy Barry Hope, Javier Rico
"Goldcorp’s Hoyle Pond mine has recently completed several projects which have impacted the overall ventilation system. The project includes extending the Fresh Air Raise (FAR) to depth, development o
Jan 1, 2019
-
Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)By L. W. T. Weitzel
"This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to
Jan 1, 2003
-
The Asbestos Hill - Nordenham Story: IntroductionBy W. Harry Foster
"Asbestos Corporation Limited, incorporated in 1925, operates four asbestos mines and three asbestos mills in the Thetford Mines 1•egion of Quebec's Eastern Townships. A unique asbestos orebody, locat
Jan 1, 1976
-
Multiscale Modeling of Nanoindentation: Significance of Local TemperatureBy W. Beres, R. E. Miller, B. Shiari, L. R. Zhao
A dynamic multiscale (MD/FE) method has been used to study dislocation generation and plastic deformation during a nanoindentation process which is physically associated with the generation of heat wi
Jan 1, 2006
-
Recycling 'Scrap' Alumina at Alcan Arvida Works - CanadaBy H. Vermette, J. Demers, R. Leclerc, P. Bergeron, P. Hudon, A. Lessard
The Arvida Smelter marked its 80th anniversary in 2006. Arvida currently operates 6 potrooms equipped with prebaked side-feeding pots producing 160 000t of aluminum per year, requiring the supply of 3
Jan 1, 2006
-
Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern OntarioBy M. B. McClenaghan
"Abstract- The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to a
Jan 1, 1994
-
Cyanide Leaching of Gold-Copper Porphyries: Chemistry and ChallengesBy K. J. R. Ford, Botz. M. M.
Porphyry copper ores are frequently a source of low-grade gold ore, but gold in these ores is often associated with significant levels of cyanide-soluble copper. Cyanide leaching of such ores increase
Jan 1, 2011