Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sinking and equipping the Kidd Creek No.2 Shaft

    By D. L. Mckay

    "Texasgulf's 25-foot-diameter Kidd Creek No. 2 Shaft is situated next to the company's No .1 Shaft, so that both shafts can share common surface and underground facilities. Shaft constructio

    Jan 1, 1981

  • CIM
    The Equity leach plant

    By C. R. Edwards

    "Equity Silver Mines Limited, Canada's largest silver mine, has designed, built and operated a leach plant to reduce the levels of antimony and arsenic in its silver-gold-copper flotation concent

    Jan 1, 1985

  • CIM
    Canadian Clean Power Coalition: Clean Coal Power Plant Technology

    By Paul R. Clark

    Outline ? Coal As An Energy Resource ? Canadian Clean Power Coalition ? Phase I of the CCPC Project ? CO2 capture options ? Gasification ? CO2 use ? Results ? Phase II Plans ? Next Steps Tra

    May 1, 2004

  • CIM
    Magnesite-talc deposit in southern Deloro Township, Ontario

    By A. T. GRIFFIS, R. J. GRIFFIS

    A large magnesite-talc body is locared in Delora Township, 11 km sourh-southeasr of Timmins, Onrario. The deposit occurs in part of an Archean greensrone belt dominated by volcanic and sedimenrary roc

    Jan 1, 1984

  • CIM
    Activated Carbon’s Use in Gold Adsorption and Recovery (Presented with Consideration to the Operator’s Point-of-View) Scotia International of Nevada, Inc

    By Michael Drozd

    "The operation of an activated charcoal system has five separate unit operations. These unit operations have common points for CIP, CIL and CIS system, which vary widely in application.The unit operat

    Jan 1, 2008

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    The Development of WFC/ROMS Ground Support Strategy at Cigar Lake Mine

    By Cale J. Dubois

    At Cameco Corporations' Cigar Lake Project, large excavations are developed on the 480 Level and 500 Level must remain stable for at least 15 years to host underground processing infrastructure.

    Nov 1, 2011

  • CIM
    Monitoring Wear and Corrosion With Integrated Ultrasonic Transducers

    By Silvio E. Kruger

    Real time measurement of wear and corrosion provides crucial information needed to determine an optimal schedule for corrective maintenance and is a powerful tool to maximise equipment availability an

    Aug 1, 2013

  • CIM
    Best Practices in Sustainability Reporting in the Mining Sector

    Presentation Outline ERM ? corporate profile Background to sustainability reporting GRI G3 Guidelines (Oct 2006) Best practice examples Contact information ERM ? corporate profile Over 35 years

    May 1, 2008

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • CIM
    Influence of Geological and Meteorological Factors on the Failure Mechanisms and Frequency of Rockfalls

    By J-P. Rossetti, A. Guerin, M. Jaboyedoff, L. Baillet, A. Mariscal, J. D'Amato, D. Hantz

    "The processes leading to the fall of rock compartments from rock walls are poorly known as well as their velocity. It ensues that quantitative prediction of the failure time for a rock compartment wh

    Jan 1, 2015

  • CIM
    Erosion Resistant Coatings for Blisk Applications in Aero Engines

    By T. Haubold, K. Ortner, T. Jung, D. Roth-Fagaraseanu, C. Mattern

    Application of integrally bladed disks (blisks) is of increasing interest in compressors of aero engines. Blisks are preferred due to their potential for size and weight reduction, for increased perfo

    Jan 1, 2006

  • CIM
    Link Between Parameters in Rock Mass Classification

    By Doug Milne

    Linking Classification Systems with each other Similar Parameters between systems Different Rock Mass Properties Rock Mass Classification parameters and geology Different sources of data Co

    May 1, 2013

  • CIM
    Peat Moss: A Natural Absorbent for Oil Spills

    By B. Coupal, F. D'Hennezel

    Sorption measurements show that peat moss has much stronger affinity for oil than straw, which is currently used. Microscopic studies of peat moss show a highly porous and fibrous material, and this p

    Jan 1, 1972

  • CIM
    Geology and genesis of the Red Dog deposit, western Brooks Range, Alaska

    By L. E. Young

    "The Red Dog deposit of the western Brooks Range, Alaska was discovered in the 1970s. Two mineralized areas are present, the Main and Hilltop deposits. With indicated and inferred reserves of 77 milli

    Jan 1, 1989

  • CIM
    Processing the Arsenic Rich MMH Copper Concentrate into a High Quality Calcine by Fluidized Bed Roasting

    By C. Mattich, Å. Holmström, L. Hedström

    "The fluidized bed at Division Ministro Hales (DMH) division of Codelco in Calama, Chile is currently the largest operating roaster for partial roasting of arsenic rich copper concentrates. The roaste

    Jan 1, 2016

  • CIM
    Tectonic setting and sulphide deposits of the Hackett River Belt, Slave Province

    By R. A. Frith

    "Belts of Yellowknife Supergroup volcanic and sedimentary strata in the Slave Structural Province are separated by granitoid complexes. The strata and most intrusive rocks are 2.7 and 2.5 Ga old, but

    Jan 1, 1980

  • CIM
    The Tasu Mine Operation

    By J. E. Dodge

    Tasu, currently an open-pit operation, services the primary crusher from two areas by ore-pass raises. The problems encountered and advantages gained are discussed. Mine equipment and operating practi

    Jan 1, 1968

  • CIM
    Lead Flotation from Rod and Ball Mill Discharge at Nanisivik Mines Limited

    By J. Goyman, K. R. Rawling

    "1.1 Location and Transportation ServicesNanisivik Mines Ltd. is located at latitude 73°, 3,200 km north of Montreal and 700 km north of the Arctic circle, on the south side of Strathcona Sound, which

    Jan 1, 1984

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994