Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams

    By J L. Kerr, J Beyer-Robson, S Vink

    Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall

    Nov 26, 2013

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating Philosophies

    By M S. Fenzel

    Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos

    Jul 27, 2015

  • AUSIMM
    A System for Ore Tracking in Autonomous Mining

    By E Nettleton, A Melkumyan

    A probabilistic system for autonomous tracking of excavated ore in mining would be highly valuable. Currently, mine sites can have a vast array of sensors; examples include excavator load cells, bucke

    Sep 26, 2011

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-Extraction in the South Deep Section, Western Areas Gold Mine (277410f0-6562-47cc-84ec-f0b4e2938751)

    By James JV, Petho SZ

    The South Deep surface shaft system is being sunk to a final depth of 2750 in below surface and on completion will be the deepest single drop haft in the world. The shafts will intersect the target

    Jan 1, 1998

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    Geochemistry of Tailings and Seepage from Three Tailings Storage Facilities in Australia - Uncapped, Capped and Active Tailings

    By T Baumgartl, D Bradshaw, B Forsyth, M Edraki

    In a tailings storage facility, the chemistry of pore water is a function of oxidation and dissolution of sulfide minerals, containing metals and metalloids, the neutralising effect of gangue minerals

    Jul 10, 2012

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Planning revegetation for relinquishment

    By S D. Fox, P B. Swart

    Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc

    Jul 25, 2018

  • AUSIMM
    Critical risks unveiled – the imperative of broad-brush risk assessments

    By C Young

    In the vast expanse of Western Australia’s mining sector, a critical issue has come to light: many mining operations overlook the power of a Broad-Brush Risk Assessment (BBRA) to uncover their critica

    Apr 16, 2024

  • AUSIMM
    Sludge Conditioning Technology to Reduce Sludge and the Cost of Acid Mine Drainage Treatment

    By K Banerjee, C Dube

    Veolia Water Technologies was contracted by a global coal mining company to design a retrofit acid mine drainage treatment facility using DenseSludge™ technology on a former coal refuse disposal site.

    Jul 27, 2015

  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016