Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia
The Department of Mineral Resources is the lead agency in mine site environment management and control in New South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managem
Jan 1, 1995
-
Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited
By Bradley AJ
Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are u
Jan 1, 1978
-
An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia
The Department of Mineral Resources is the lead agency in mine site environment management and control inNew South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managemen
Jan 1, 1995
-
From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process
The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi
Jan 1, 1998
-
Australian Hot Dry Rock Geothermal Energy Potential and a Possible Test Site in the Hunter Valley
By Somerville M, Muray A, Bocking M
Australia has an extremely large total hot dry rock (HDR) resource above a depth of 5 km, equivalent to 7500 times its present annual energy consumption, of which 80 per cent underlies the Great Art
Jan 1, 1995
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators
By P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
Cover Design of a Backfilled Open Pit Based on a Systems Approach for a Uranium Mining Site
By R Kahnt, S Jahn, D Baacke, M Eckart
Relocation into the Lichtenberg open pit mine of about 110 million m3 of sulfide-bearing and ARD-generating waste rock piled up on the surface is the most important and cost-intensive single surface r
Jan 1, 2003
-
Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design
By E C. F Hamman
Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock
Jan 1, 2007
-
Status of In Situ Treatment of Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota, USA
By B T. Park, S D. Fundingslan, K W. Wangerud
The EPA National Risk Management Research Laboratory (NRMRL) Mine Waste Technology Program (MWTP) and the EPA Region VIII Superfund office are jointly conducting a field-scale technology demonstration
Jan 1, 2003
-
Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example
By A Fitzpatrick
An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa
Jul 10, 2012
-
The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes
By P Willems, J B. Crow, R Dale
Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a
Mar 22, 2022
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment
By A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management
By M Grigorescu, J H. Hodgkinson, H Alehossein
A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and
Nov 26, 2013
-
Effectiveness of Site-Specific Criteria for the Protection of Aquatic Life - Treated Wastewater from Golden Cross Gold Mine and the Waitekauri River
By A Goldstone, M Fitzpatrick
Contemporary mine wastewater flows are subject to stringent water quality standards before discharge to local waterways. Strict criteria are often applied as a result of fears of extensive acid mine d
Jan 1, 2003
-
Long-Term Monitoring of Water Infiltration Through Covers at White Æs Waste Rock Dump at the Rum Jungle Mine Site Using Lysimeters
By A I. M Ritchie, G P. Timms
Monitoring of water infiltration into WhiteÆs waste rock dump at the Rum Jungle mine site in the Northern Territory, Australia, started in 1983, and has since produced a unique and long-running data s
Jan 1, 2003
-
Speciation of Arsenic in an Anaerobic Treatment System at a Pb-Zn Smelter Site, Gold Roaster Products, Cu Smelter Stack Dust and Impacted Soil
Mining and metallurgical processing of gold and base metal ores often results in solid wastes and effluents containing high concentrations of arsenic. In addition, arsenic can be released to the atmos
Jan 1, 2008
-
Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments
By N Swiegelaar
Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen
Jan 1, 2003
-
Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near Crandon
By D T. Feinstein, M B. Gotkowitz
In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including
Jan 1, 2003
-
Satellite Image Based Strategies to Evaluate the Impact of Dismissed Mine Site - An Application to the Mae Moh Coal Mine Area in the Lampang Province, Thailand
Satellite Image Based Strategies to Evaluate the Impact of Dismissed Mine Site - An Application to the Mae Moh Coal Mine Area in the Lampang Province, Thailand
Sep 13, 2010
-
BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia
Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a
Jan 1, 1994