Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia

    The Department of Mineral Resources is the lead agency in mine site environment management and control in New South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managem

    Jan 1, 1995

  • AUSIMM
    Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. Limited

    By Bradley AJ

    Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are u

    Jan 1, 1978

  • AUSIMM
    An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia

    The Department of Mineral Resources is the lead agency in mine site environment management and control inNew South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managemen

    Jan 1, 1995

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • AUSIMM
    Australian Hot Dry Rock Geothermal Energy Potential and a Possible Test Site in the Hunter Valley

    By Somerville M, Muray A, Bocking M

    Australia has an extremely large total hot dry rock (HDR) resource above a depth of 5 km, equivalent to 7500 times its present annual energy consumption, of which 80 per cent underlies the Great Art

    Jan 1, 1995

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Cover Design of a Backfilled Open Pit Based on a Systems Approach for a Uranium Mining Site

    By R Kahnt, S Jahn, D Baacke, M Eckart

    Relocation into the Lichtenberg open pit mine of about 110 million m3 of sulfide-bearing and ARD-generating waste rock piled up on the surface is the most important and cost-intensive single surface r

    Jan 1, 2003

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Status of In Situ Treatment of Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota, USA

    By B T. Park, S D. Fundingslan, K W. Wangerud

    The EPA National Risk Management Research Laboratory (NRMRL) Mine Waste Technology Program (MWTP) and the EPA Region VIII Superfund office are jointly conducting a field-scale technology demonstration

    Jan 1, 2003

  • AUSIMM
    Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example

    By A Fitzpatrick

    An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa

    Jul 10, 2012

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • AUSIMM
    Effectiveness of Site-Specific Criteria for the Protection of Aquatic Life - Treated Wastewater from Golden Cross Gold Mine and the Waitekauri River

    By A Goldstone, M Fitzpatrick

    Contemporary mine wastewater flows are subject to stringent water quality standards before discharge to local waterways. Strict criteria are often applied as a result of fears of extensive acid mine d

    Jan 1, 2003

  • AUSIMM
    Long-Term Monitoring of Water Infiltration Through Covers at White Æs Waste Rock Dump at the Rum Jungle Mine Site Using Lysimeters

    By A I. M Ritchie, G P. Timms

    Monitoring of water infiltration into WhiteÆs waste rock dump at the Rum Jungle mine site in the Northern Territory, Australia, started in 1983, and has since produced a unique and long-running data s

    Jan 1, 2003

  • AUSIMM
    Speciation of Arsenic in an Anaerobic Treatment System at a Pb-Zn Smelter Site, Gold Roaster Products, Cu Smelter Stack Dust and Impacted Soil

    Mining and metallurgical processing of gold and base metal ores often results in solid wastes and effluents containing high concentrations of arsenic. In addition, arsenic can be released to the atmos

    Jan 1, 2008

  • AUSIMM
    Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments

    By N Swiegelaar

    Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen

    Jan 1, 2003

  • AUSIMM
    Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near Crandon

    By D T. Feinstein, M B. Gotkowitz

    In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including

    Jan 1, 2003

  • AUSIMM
    Satellite Image Based Strategies to Evaluate the Impact of Dismissed Mine Site - An Application to the Mae Moh Coal Mine Area in the Lampang Province, Thailand

    Satellite Image Based Strategies to Evaluate the Impact of Dismissed Mine Site - An Application to the Mae Moh Coal Mine Area in the Lampang Province, Thailand

    Sep 13, 2010

  • AUSIMM
    BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia

    Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a

    Jan 1, 1994