Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The ABC of Mine to Mill and Metal Price CyclesBy J Pease, P Cameron, D Drinkwater
"In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.
Oct 10, 2016
-
Planned Field Investigation of Connectivity between the Condamine Alluvium and Walloon Coal MeasuresBy S Gossmann, J Barlow, S Denner
"Unconventional gas resources, including coal seam gas (CSG) reservoirs, can be located above and below aquifers that provide groundwater for agricultural, industrial, urban and other uses. Developmen
Nov 26, 2013
-
A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental AssessmentBy M Ind, B Usher
Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture
Jul 16, 2014
-
Maximising Value Through Maintaining Your Flotation EquipmentBy B Murphy, S O’Connell, J L. Heath
In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat
Sep 1, 2014
-
Interacting with the Daily Operations and the Need to Plan for Future RehabilitationMine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
BHP and management standard: a global approach to reducing geochemical risk and minimising closure uncertaintiesBy J Heyes, T Cooper, M Stimpfl, R Staines, J P. Pearce
Acid and Metalliferous Drainage (AMD) is one of the key risks facing the mining industry worldwide. If not properly managed and/or not identified in a timely manner, AMD has the potential to decrease
Jul 1, 2021
-
The Implementation of FloatStar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation CircuitsBy D Phillpotts, S M. Mantsho, P Strobos
A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical
Oct 29, 2012
-
Geochemical Characteristics of River Deposited Mine Wastes and Associated Contact Waters Downstream of the Ok Tedi Mine, Papua New Guinea ù Implications for ARD ManagementBy H Kundapen, B R. Bolton, H Davies
The Ok Tedi porphyry copper-gold mine is located in the Star Mountains of Western Province, Papua New Guinea. Open-cut mine commenced in 1984 and is due to cease around 2010. The mine produces a total
Jan 1, 2003
-
Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, AustraliaBy C D. McCullough, M Gerner
Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak
Jul 16, 2014
-
Key insights for the successful implementation of proximity detection and collision avoidance technology for reducing vehicle interaction risk – a surface technology provider perspectiveBy C Hoffmann
Given that each year, 30–40 per cent of mining industry deaths are attributable to failures of vehicle interaction controls (EMESRT, 2023), the mining industry is now armed with a growing body of know
Apr 16, 2024
-
Staying in the Game – the Importance of Engineering-based DecisionsBy P J. Fairfield
This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses
Jun 22, 2016
-
Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible InformationBy C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan
In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder
Jul 16, 2014
-
Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in BrisbaneBy A Purwodihardjo
Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t
Mar 8, 2011
-
Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation AttemptsBy E J. B van Etten
This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le
Oct 5, 2011
-
Calibration and Testing of a Geometallurgical Leaching Protocol for Determining Copper Mineralogical DeportmentBy N L. Turner, D J. Robinson, A J. McFarlane, N M. Chapman, L L. Kuhar, R L. Meakin, R Martin
A number of geometallurgical tests have been developed within the AMIRA P843A Geometallurgical Mapping and Mine Modelling (GeMIII) project, an interdisciplinary collaborative research project involvin
Sep 29, 2013
-
Cyanide Biodetoxification in Spent Ore, Tailings and Process SolutionsBy I R. F MacCulloch, K Jones
Pintail Systems, Inc, a Colorado USA based company has developed and commercially applied bioremediation processes for biological detoxification of cyanide compounds in mine waste. Site-specific micro
Jan 1, 2004
-
Setting Best Practice: FIFO at the Mount Keith ConcentratorBy S O. Hille
Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc
Jan 1, 2002
-
Building better bow-ties – common pitfalls in risk analysisBy B Beale
Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective
Apr 16, 2024
-
Closure Cost Estimation - All Things to All Men?By H Jones
Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates
Nov 20, 2012
-
AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years onBy J Missen, P Currie, J Bohan, D Clark
AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates
Jun 22, 2016