Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Total System Design for Comminution

    Traditionally, the term ætotal systemÆ design applied to comminution conjures images of a design that addresses the usual business and operational drivers, including health, safety and environment (HS

    Jan 1, 2007

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids (7e54b8c0-a935-48c5-857a-f805178a4625)

    By Ramsay WRH, Morand V

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (Dl) predate

    Jan 1, 1995

  • AUSIMM
    Rehabilitation at the Macraes Gold Project: from Pit to Park

    Gold mineralisation at the Macraes Gold Project is hosted in the Hyde-Macraes shear zone and can be traced for ~30km along strike, although economic resources are confined to a 7 km section in the vic

    Jan 1, 2002

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids

    By V Morand, W R. H Ramsay

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (D1) predates

    Jan 1, 1995

  • AUSIMM
    Australian Rock Bolt Steel Chemistry and Stress Corrosion Cracking

    It's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a

    Nov 25, 2010

  • AUSIMM
    Acid Rock Drainage Treatment Technologies ù Identifying Appropriate Solutions

    By N Murphy and, S Santomartino, M Cramer

    Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at

    Jan 1, 2003

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    Evaluation of Remote Sensing Technology as a Tool for Mining Applications

    By D Laurence, L Ge

    This paper demonstrates use of remotely sensed imagery in promoting sustainable mining. Remote sensing technology can be used during all phases of a mining project û from evaluating the resource, to m

    Jan 1, 2009

  • AUSIMM
    Improving dust management in gate road development – a computational fluid dynamics-virtual reality based training tool for mine workforce

    By M Qiao, A Sugden, W Zong, J Hines, J Roberts, T Ren

    Long-term exposure to respirable dust continues to present an occupational health and safety hazard to mine workers in underground mines. Workers who are exposed to mine dust can develop occupational

    Apr 16, 2024

  • AUSIMM
    Managing Information to Support a Social Licence to Operate

    By A Golsby

    Although much talked about, social licence to operate (SLTO) is a relatively new concept that has been deemed as one of the four biggest business risks to a mining project over the life-of-mine. There

    Jul 16, 2014

  • AUSIMM
    Regular Measurement Defines Upgrades on Scrubber Screens

    By R Wilson, S Luke, R Williams, B Freeburn

    "In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e

    Oct 10, 2016

  • AUSIMM
    High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage Wastewaters

    By A Dal-Corobbo

    Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co

    Nov 26, 2013

  • AUSIMM
    Of Detritals, Derivatives and Determination ù An Example of Detrital Iron Discovery

    By P J. Hawke, M F. Flis

    The Hamersley Basin of Western Australia holds significant tonnages of detrital iron deposits. Formed by a cyclic weathering and eroding sequence of nominally barren banded iron formation, they may fo

    Jan 1, 2002

  • AUSIMM
    Rehabilitation At Stawell Joint Venture

    It was once considered sufficient to revegetate old mine sites using grass or trees. At the commencement of the Stawell JV (SJV) operation in 1981, management determined that pre-existing vegetation w

    Jan 1, 1992

  • AUSIMM
    Blasting Risk Management ù Hazards, Variations and Opportunities

    The risks faced by organisations are part of a risk continuum. They can be evaluated in terms of hazard, uncertainty and opportunity as well as by the degree of influence they have on conformance, ope

    Jan 1, 2001

  • AUSIMM
    Metal Balance for Olympic Dam Using a Standard Industrial Software Package

    By R Gilbertson, N Freeman

    Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi

    Jan 1, 2002

  • AUSIMM
    Mill Auto-Pilot at CSA Mines

    By A Thornton, D Engelhardt, J Woodg

    Grinding is a critical part of nearly all mineral processing operations. It is the largest consumer of energy on the mine site (and thus indirectly a producer of greenhouse gas through the generation

    Jan 1, 2004