Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The irrefutable value of introducing a dynamic transport term into mill modelling

    By D K. Weatherley, A N. Mainza, I Govender, L M. Tavares, M S. Powell

    It is understood that rocks do not instantaneously transport along a grinding mill and are consequently not perfectly mixed, but this is conveniently overlooked in mill modelling. A lack of understand

    Aug 24, 2022

  • AUSIMM
    Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologies

    By E Amini, N Beaton

    Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre

    Nov 10, 2020

  • AUSIMM
    Twenty-Five Years of Mine Filling: Developments and Directions (b390a014-dbd9-4431-8acc-7b7e158ab629)

    The sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part

    Jan 1, 1998

  • AUSIMM
    Strategy and Tactics Implemented to Achieve Energy-efficient Ventilation and Cooling of Mines

    By J J. L du Plessis

    Escalating energy and electricity costs have become one of the biggest expenditure drivers in mining operations. During the last eight years, energy costs have trebled when expressed as a percentage o

    Aug 31, 2015

  • AUSIMM
    Thiosulfate Process for Treating Gold Concentrates

    By P Breuer, X Dai, A Bergamin, D Hewitt

    "Copper-ammonia-thiosulfate?leaching of gold has been researched for several decades as a potential alternative to cyanidation. However, this technology has not yet been applied commercially due to ma

    Sep 26, 2013

  • AUSIMM
    Reducing Crest Loss at Barrick Cowal Gold Mine

    By R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan

    Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre

    Aug 24, 2015

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Into the Belly of the Flash à Insights into the Mechanisms at Work Within a Flash Flotation Cell

    By D J. Bradshaw, E M. Wightman, B Newcombe

    Flash flotation plays an integral role in many of the gold and sulfide mineral concentrators around the world, and yet despite this widespread use, very little information on this unit process is avai

    Oct 29, 2012

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    Twenty-five Years of Mine Filling: Developments and Directions

    The sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part to

    Jan 1, 1998

  • AUSIMM
    Safety of a Tailings Storage Facility against Dam Instability

    By D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli

    Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case

    Jul 27, 2015

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel Operations

    By P A. Jenkins, I W. O Jones

    WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur

    Jan 1, 2000

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Evolution of SAG Milling Performance ù A Comparison of Alumbrera and Ernest Henry

    By J Mar·n, R Anderson, S Strohma, R Harvey

    Xstrata is the operator of both Minera Alumbrera Ltd (50 per cent Xstrata, 50 per cent Wheaton River) and Ernest Henry Mining Pty Ltd, (99.99 per cent Xstrata), both copper-gold deposits, using conven

    Jan 1, 2003

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013