Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving Drive Stability through Efficient Development Blasting Design and Practices

    By P Klaric

    Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th

    Aug 24, 2015

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Performance of the IsaMills in the George Fisher Flowsheet

    By M Gao

    Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation

    Jan 1, 2000

  • AUSIMM
    An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical Performance

    By O N. Savassi

    A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope

    Jan 1, 2005

  • AUSIMM
    The Influence of Vacation Employment upon Career Paths

    As students progress further into a degree, the decision of vocation selection, and even more importantly û securing employment in a particular industry sector, can become quite daunting. However, wit

    Jan 1, 2005

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Fluid Bed Roasting at Mount ISA

    By Casley G. E, Pritchard J

    A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15

    Jan 1, 1974

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Are Tennant Creek Style Ironstone-Related Gold-Copper-Bismuth Deposits Unique? A Review of Available Data and a Comparison with Possible Analogous Deposits

    By P A Ferenczi

    The Proterozoic iron oxide related Au-Cu-Bi (Tenant Creek style') deposits at Tennant Creek can be classified as syntectonic polymetallic hydrothermal replacement type mineralisation. These dep

    Jan 1, 1994

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Factors Affecting Acid Generation and their Relevance to the Mines of the Northern Territory

    By Jiaxin Zhou

    Acid mine drainage is a serious and chronic environmental problem of mining. This paper discusses the factors affecting the rate of acid generation by mine rocks and illustrates the relevance of the

    Jan 1, 1994

  • AUSIMM
    What Have we Learnt About Managing Rock Burst Risks?

    By Y Potvin

    Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i

    Mar 21, 2011

  • AUSIMM
    ROES® – Automated Rock Extraction

    By I Gipps

    A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur

    Nov 22, 2011

  • AUSIMM
    Coal Seam Gas in New Zealand - Perspective from New Zealand's Most Active CSG Explorers

    By S Hayton

    While coal seam gas is considered to be an unconventional gas, the proliferation of areas under exploration and development mean that it is rapidly becoming main stream. The potential of New Zealand&a

    Jan 1, 2003

  • AUSIMM
    Harnessing data complexity – how machine learning applies all project data for accurate resource modelling

    By S Sullivan

    A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in

    Mar 22, 2022

  • AUSIMM
    Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool

    By B Maybee, L Fava, D Millar

    In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises

    May 24, 2012

  • AUSIMM
    Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central Queensland

    By K White, R Hardie, J Merritt, B Kirsch, R Lucas

    Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res

    Nov 26, 2013

  • AUSIMM
    The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

    CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill

    Jan 1, 1946

  • AUSIMM
    Sampling and Grade Control Pratices at Misima Mines

    The Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en

    Jan 1, 1991