Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separator

    By I Sherrell, R Jain, P Jansson

    With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their

    Jul 24, 2017

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered Coalmine

    By F Wu, H Wang, W Chen

    A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe

    Aug 31, 2015

  • AUSIMM
    QAQC – proactive Quality Management (QM) supporting reconciliation results

    By O Dominguez

    Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q

    Mar 22, 2022

  • AUSIMM
    Solid bowl decanter centrifuges – the alternative technology

    By M Player, R Klug, N Schwarz

    There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow

    Jul 1, 2021

  • AUSIMM
    The Application of Ausmelt's AM28 Alkyl Hydroxamate Flotation Reagent to Fox ResourcesÆ West Whundo Copper Ore at Radio Hill, Western Australia

    By K Lee, L Mann, J Bygrave, G Sheldon

    Ausmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a

    Jan 1, 2007

  • AUSIMM
    Multi-source data fusion for geological boundary modelling via Gaussian Processes

    By K L. Silversides, A Chlingaryan, A Melkumyan

    Multiple data sources can be fused to improve boundary modelling in stratified deposits such as the banded iron formation (BIF) hosted deposits in the Pilbara Region of Western Australia. Accurate bou

    Mar 22, 2022

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)

    By García B., Wolff E.

    In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg

    Jun 17, 2024

  • AUSIMM
    Getting the Burden Right

    By J Poniewierski, Varcos D

    Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap

    Jan 1, 1994

  • AUSIMM
    Commissioning - From a Project Manager's Viewpoint

    Commissioning is one of the many phases of a project, it has inter-dependencies with the other phases, as they have amongst themselves, and has its own terminology and distinctive features. Commis

    Jan 1, 1986

  • AUSIMM
    Implementation of Advanced Flotation Control at First Quantum Minerals’ Kevitsa Mine

    By A Rantala, C Cruickshank, I Muzinda, O Haavisto, J Timperi

    The production at First Quantum Minerals’ (FQM) Kevitsa Mine, located in northern Finland, commenced during the second quarter of 2012. Presently, the mine processes approximately five and half millio

    Sep 1, 2014

  • AUSIMM
    An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and Modelling

    By J Janus, J Krawczyk

    Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga

    Jul 1, 2013

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    A Safety RegulatorÆs Perspective of Risk Management

    By R Billingham

    QueenslandÆs new safety legislation for metalliferous and coal mining (Mining and Quarrying Safety and Health Act 1999 and Coal Mining Safety and Health Act 1999, together with the Regulations) came i

    Jan 1, 2002

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Managing Groundwater Impacts in the Surat Basin

    By R Cox, S Pandey

    The coal seam gas (CSG) industry is expanding rapidly in the Surat and Bowen basins. CSG production involves pumping water from the coal seams to release the gas adsorbed to coal particles. The reduct

    Nov 26, 2013