Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Water Quality Changes After Partial Site Remediation at Tui Mine Site, Mt Te Aroha
By J G. Webster-Brown
The Tui Mine is located near Te Aroha at the base of the Coromandel Peninsula. It was a lead-zinc mine, which closed in 1973 due to declining concentrate prices, high overheads, and high mercury level
Jan 1, 2007
-
Computing from a Remote Mine Site
By Giedl JG
Technical applications of computers within the coal industry are expanding rapidly with an increase in the number of users and user locations. Collinsville Coal Company Pty Ltd is an example of a
Jan 1, 1983
-
Mine Water - Optimising for Site and Environment
By P Thompson, B W. Atkinson
Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati
Nov 26, 2013
-
Rock stress measurements – a site geotechnical toolkit
By P B. Hills
Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ
Nov 29, 2022
-
Site Investigation Drilling on the Derwent River
By Billingham R
The Department of Mines Tasmania employs a Drilling Section for specialised drilling re- quired by government and semi-government bodies. The section has a complement of nine crews oper- ating auger
Jan 1, 1977
-
Site Water Balance Response to Variable Climatic Conditions
By S Hawker, M Gibbs, A Craven
Current climate change projections suggest both an increase in the intensity of significant rainfall events and an increase in the variability of rainfall in some regions of Australia. It is necessary
Nov 26, 2013
-
Blast design and execution drives mine site profits
By J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
The Rise of the On-Site Geotechnical Engineer
The current boom in the mining sector has required mining operations to ramp up production to meet the international demand for minerals. This increase in production is putting enormous pressure on on
Jan 1, 2006
-
Environmental Management of a Traditional Coal Mining Site
By R Byrnes, P Hensley
The outstanding environmental management initiatives undertaken by Novacoal at its Western Main Site near Lithgow in
Jan 1, 1995
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?
By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014
-
Site Investigation and Design for Melbourne’s New Metro
By H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Solute Transport Studies for a Tailings Disposal Site
By P H. Warton
It is proposed to construct a gold extraction plant at Matatoki, near Thanes. Ore to be processed at the mill will come from reopened and enlarged underground mines north of Thanes. The project has be
Jan 1, 1987
-
Water Treatment at Waikato North Head Mine Site
By B Orchard
New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.
Jan 1, 2002
-
A Robust Methodological Approach for Mine Site Water Accounting
By N Collins, A Woodley, A N. Danoucaras, C McCombe, N C. Kunz
Over the past decade, the mining industry has come to recognise the importance of water both to itself and to others. Water accounting is a formalisation of this importance that quantifies and communi
Nov 26, 2013
-
Requirements for On-Site Testing of Axial Flow Fans
The problems associated with achieving adequate accuracy for on-site axial flow fan performance measurements are discussed. The ability to test accurately rests heavily on equipment and installation d
Jan 1, 1973
-
Mine Site Stream Diversions - A Balance of Competing Objectives
By A Markham
Stream diversions are a common feature of mine sites worldwide. From an operational perspective, a fundamental requirement of a stream diversion is that it should convey water flows between two points
Jul 10, 2012
-
Development of an On-Site Mineralogy Solution for Metallurgists
By D van der Wal, R Dobbe, K Moeller
"Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s
Jul 15, 2013
-
Optimising Leach Pad Construction Methods for Site Specific Applications
By Thompson P, Sharma Y
The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.
Jan 1, 1994
-
Reclaimed Lignite Mining Areas A73 in Lusatia - Development of Soil Physical Parameters of an Agricultural Site within the First Years after Site Reconstruction
By J Krnmmelbein, T Raab
In Lusatia, lignite mining causes major disturbances on the landscape scale. Reclamation procedures are applied to recover the reconstructed landscape for different land use options. In this study we
Jul 10, 2012
-
When Does Further Processing at the Mine Site Make Sense?
By G Lane, S La Brooy
A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L
Jan 1, 2008