Search Documents

  • IOM3
    Characterization of strength of Australian iron ores by tumble-drum and drop tests

    By R. D. Dukimo, M. V. Sevian

    The nature of fracture and factors that control the extent of fracture in the tumble-drum and drop-tower tests have been identified. The product-size distribution, on which the standard strength indic

    Jun 19, 1905

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • AUSIMM
    Hydrocyclone Classification Studies of a Complex Nickel Ore

    By Nageswararao K

    A series of tests was carried out on one of the rock-pebble milling circuits treating complex nickel ores at Kambalda Nickel Operations of Western Mining Corporation. A mathematical model to describe

    Jan 1, 1981

  • NIOSH
    IC 8726 Mine Inspection Records Study

    By George J. Conroy

    This Bureau of Mines report summarizes the results of a study of mine inspection records covering 2,200 mining installations over a 3-year period ending December 1974. Tables show the relative frequen

    Jan 1, 1976

  • CIM
    Noranda Minerals Inc. - Geco Division Mill Pressure Filter Project Selection, Installation and Start-Up

    By M. G. Dellow, D. W. Hendriks

    "In early 1988 the decision was made by Noranda Minerals Inc. to install pressure filters at the GECO mill to replace the vacuum disk filters and bunker-C fired rotary kiln dryers. Two filters were in

    Jan 1, 1990

  • NIOSH
    RI 3345 Permissible Electrically Operated Rock-Dust Distributors ? Introduction (6b9ba481-2913-4300-a3ee-fd52b983a832)

    The general nature of the special constructional features that are required to provide safety from explosion hazards on machines approved as permissible by the Bureau of Mines is fairly well known to

    Jan 1, 1937

  • SME
    Use of Tunnel Boring Machines at Depth: Extending the Limits

    By Peter Dowden, Trevor Carter, Allan Moss, Bruce Downing, Richard Beddoes

    Traditionally (with a few exceptions) tunnel boring machines (TBMs) have been utilized on tunnel projects where the risks associated with deep tunnels (rock burst, squeeze, etc) are low (or expected t

    Jan 1, 2007

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • AUSIMM
    The Aluminium Smelter at Tiwai Point

    My speech this morning is not a technical one, rather I will aim to tell you about the New Zealand Aluminium Smelters Limited and how I see it fitting into the Western World aluminium scene.

    Jan 1, 1983

  • NIOSH
    IC 8768 Coal Mine Fire And Explosion Prevention - Proceedings: Bureau Of Mines Technology Transfer Seminars, Pittsburgh, Pa., March 2, 1978 And Denver, Colo., March 14, 1978

    These proceedings consist of papers presented at two Bureau of Mines Technology Transfer Seminars for the purpose of disseminating recent advances in mining technology related to coal mine fire and ex

    Jan 1, 1978

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • AUSIMM
    Development of Technology for Complex Uranium Ores Processing on the Flotation Process Basis

    Development of Technology for Complex Uranium Ores Processing on the Flotation Process Basis

    Sep 13, 2010

  • ISEE
    Underwater Blasting and Train-induced Ground Vibrations on 80 Years-old Building

    By Paulo José Costa Couceiro Junior, Manuel Lopez Cano

    In 2011, two historic outcrop rocks known as Teffé and Itapema located in the navigation channel of the Port of Santos, Brazil (Latin America’s largest port) – were excavated by drilling and blasting

    Jan 1, 2016

  • AUSIMM
    The Importance of Sampling in the Mineral Industry

    By R J. Holmes

    An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant

    Jul 15, 2013

  • CIM
    Control of copper electrolyte impurities using the Eco-Tec APU®

    By C. J. Brown

    Controlling the level of impurities in copper refinery electrolytes is essential to achieving acceptable cathode purity. Purge of electrolyte is not an entirely satisfactory solution since the cost of

    Jan 1, 2005

  • AUSIMM
    The Real Costs of Mining and Mineral Processing in Australia

    By B A. Tapp

    The minerals industry in Australia is currently regarded as the country's economic saviour; the bastion of economic security. As Fitzgerald (1974) stated, 'Australia's natural endowment

    Jan 1, 1980

  • AUSIMM
    Presidential Address (c6bc4496-0254-49d2-8045-842af5b52d7d)

    The selection of Sydney and Port Kembla for the First Ordinary Meeting of the Institute for 1938 was, no doubt, a recognition of the celebrations marking the 150th Anniversary of the first settlement

    Jan 1, 1938

  • AUSIMM
    Government Coodrination and Liaison: The Lihir Project

    By Van Dusen M

    The involvement of concerned parties in all aspects of the Lihir Project from an early stage has promoted good relations between all groups. Activities involving landowners, the Lihir community, t

    Jan 1, 1991

  • AUSIMM
    Operations at Mount Isa Copper Smelter

    Operations of the new copper smelter at Mount Isa commenced on the 6th February, 1953. Prior to this date a paper by R. V. Anderson (1953) outlined the smelter layout, proposed operation and expected

    Jan 1, 1957

  • SAIMM