Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite OreStudy on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore
Sep 13, 2010
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Influence of Direct Aged Treatment on Creep Behaviors of Hot Continuous Rolling GH4169 SuperalloyBy Tian Sugui
By direct aging treated, creep properties measurement and microstructure observation, the influences of the direct aging treatment on the creep behaviors of Hot Continuous Rolled GH4169 superalloy are
Jan 1, 2010
-
Canadian Diamond Industry: An OverviewBy Robert Boyd
The Diamond Markets ? Supply has continuously increased over the past 25 years ? However, global supply is expected to drop by 1 to 2% by 2015 ? Demand Driven Market ?Demand is expected to grow 3%
May 1, 2006
-
Discussion - Lemniscate-guided powered roof supports adapted for proper operation with the roof on longwall faces (857baea3-2787-49de-993d-00b3908db795)By J. B. Gwiazda
S.S. Peng The highlights of this paper are : • The shield supports with lemniscate links will exert a tangential force on the roof strata, causing unnecessary and harmful roof movements, thus dama
Jan 12, 1986
-
Testing And Evaluation Of Driven Plate Piles In A Full Size Test Slope: A New Method For Stabilizing Shallow Landslides ? IntroductionBy Richard Short
Shallow rainfall-induced landslides in residual and colluvial hillslopes and steep embankments are a common occurrence in many settings [1, 2, 3]. While occasionally posing a threat to property and l
Jan 1, 2007
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
IC 9324 Diesels In Underground Mines: Measurement And Control Of Particulate EmissionsBy Staff
The goal of the U.S. Bureau of Mines diesel engine research program is to reduce exhaust emissions from diesel-powered equipment used in underground mines. This research has led to significant advance
Jan 1, 1992
-
Metallic Wires Elaboration Directly From Thin Liquid JetsBy Ludovic Charpentier
Production of metallic wires directly from liquid jets would avoid drawbacks of extrusion (space needed, damaging, cost?) and enable recycling. But liquid jets tend to break, due to capillary instabil
Jan 1, 2006
-
Plant OptimisationBy K Pery, J Leahy
Established metallurgical plants operate in a complex environment of interdependent drivers including technology change, operating and maintenance practice, evolving markets, HSEC requirements, statut
Jan 1, 2004
-
Minimising Mineral Project Risk - New Zealand in a Global ContextMining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat
Jan 1, 2005
-
High Yield Bacterial Leaching of Copper ConcentratesBy Madgwick J. C
A new strain of Thiobacil/us ferrooxidans (SPK I) has been isolated which has a higher copper to iron release ratio (2.04) than the standard T ferrooxidans (CPBI) (1.12). The diminished iron oxidizing
Jan 1, 1983
-
Environmental Considerations in Project Planning, Development and Management (Bull, Proc. Australas, Ins!. Min, Melall,. Vol. 292, No. 5, July 1987)By Hannan J. C
In New South Wales, development applications for major coal mining proposals are determined by the Minister for Planning and Environment and applications for mining leases and other mineral titles are
Jan 1, 1987
-
The New Zealand Mining Regime with Particular Reference to the Development of Minerals ProgrammesBy W P. Player
The legislative operating environment, or the mineral regime, that a country has to offer is one of the key determinants that a company wanting to invest in an area takes into account in formulating i
Jan 1, 1995
-
Nanoparticle Flotation Collectors for PentlanditeBy Manqiu Xu, Songtao Yang, Zongfu Dai, Robert Pelton
"Hydrophobic polystyrene nanoparticle suspensions were evaluated as potential flotation collectors for pentlandite. Experiments involving both clean model mineral suspensions and complex ultramafic ni
Jan 1, 2012
-
Connection of TARP Tunnel to Thornton Quarry ReservoirBy Djavid Mohammad
Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad
Jan 1, 2008
-
Government and the Resource IndustryThroughout history, many of the world's achievements, conflicts and problems can be traced to the demand for minerals. With the rapid expansion of our industrialised society in recent years the d
Jan 1, 1986
-
Some Notes on Recent Changes in Ore Extraction Practices in the Zinc Corporation and New Broken Hill Consolidated MinesUp to the end of World War n, flat-back cut and fill stoping with or without square sets was the universal method of ore extraction. Rapid changes in practice occurred during the post-war years; first
Jan 1, 1957
-
Goldstream Concentrator Design and OperationBy Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Managing the Impact of Environmental Law on Major Resource Development ProjectsEnsuring the success of a major resource development project, whether in the Gippsland Basin or elsewhere, is typically both a complex and costly process. It is therefore imperative from the point o
Jan 1, 1992