Search Documents

  • NIOSH
    OFR-11-71 Designing And Planning Open Pit Mining Operations With Computer Simulation Solutions ? Summary

    By Y. L. Su

    Deterministic and stochastic simulation were combined to develop a computer model of an open pit mining system using bucket wheel excavators and related materials handling equipment. The model is clos

    Jan 1, 1971

  • NIOSH
    OFR-97(A)-82 Improved Solution Mining Production Cost Model - Introduction

    On April 1, 1982, the Bureau of Mines and the Department of Energy entered into an Interagency Agreement to develop an enhanced computer cost model for uranium in situ leach mining. The original compu

    Jan 1, 1982

  • SAIMM
    Grab sampling for underground goldmine grade control ? Synopsis

    Geologists in some underground gold mines collect grab samples from broken ore piles or trucks as a method of grade control. It is often known as muck sampling. Generally, the goal of grab sampling is

    Jan 1, 2010

  • IMPC
    New Test Method for Investigation of Grindability in Alkaline Media at High Temperature

    By József Faitli, Barnabás Csoke, Károly Solymár, Zoltán Hatvani, Dimitri Papanastassiou

    In most cases, the sizing of dry or wet mills for ore processing is primarily based on the determination of the Bond grindability index, using the Bond-Kjos-Rowland relations. In several cases, grindi

    Jan 1, 2003

  • ISEE
    Advanced Technology for Blast Design, Execution & Assessment

    AQUILA Mining Systems Ltd., designs, develops and delivers systems for measurement, analysis, simulation, control and automation to the mining, construction and petroleum industries. The objective of

    Jan 1, 1994

  • AUSIMM
    Geology and Structure on the Mahakipawa Gold Deposit, Marlborough: Preliminary Results

    The Mahakipawa gold deposit is located 21 km northwest of Blenheim. It became the site of a small hardrock gold rush in 1889 following nearby alluvial gold discoveries in 1888. The study investigates

    Jan 1, 1993

  • SME
    Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240

    By Keith Jones, Michael Francis

    Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an

    Jan 1, 2005

  • SME
    Hydraulic Impacts Of Quarries And Pits: Critical Planning For Resource Development

    Introduction Aggregate mining impacts on water resources are a source of concern to local governments. To evaluate those impacts, the Minnesota Department of Natural Resources conducted a four-year

    Jan 1, 2007

  • CIM
    Thompson Mill MgO Rejection

    By Johnna Muinonen

    "The Thompson Mill processes ores from the Thompson and Birchtree Mines. While the Thompson ore has very little magnesium containing gangue, the Birchtree orebody consists of veins of massive sulphide

    Jan 1, 2006

  • NIOSH
    OFR-108-82 Feasibility And Applicability Of Hydraulic Mining And Transport In Underground Noncoal Mines

    By William C. Cooley

    This study Identifies and evaluates deposits of noncoal minerals in the U.S. which are most amenable to be mined underground hydraulically and transported hydraulically. A method was developed to scre

    Jan 1, 1981

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • AUSIMM
    Coal Bed Boundary Detection using Infrared Technology for Longwall Shearer Automation

    Automation in underground mining enhances safety and leads to economic efficiency. In the past many efforts have been made on the automation of longwall shearer operation. With respect to the ultimate

    Dec 6, 2010

  • CIM
    On The Floatability of Gold Grains

    By Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov

    "Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold

    Jan 1, 2003

  • SME
    Discussion - Performance evaluation of indicator kriging in a gold deposit

    By Y. C. Kim, I. S. Roditis, P. K. Medhi

    P. Mousset-Jones I found the article most interesting and timely. I consider it imperative that mine case studies like this one are undertaken and published so that the practicing mining engineer and

    Jan 3, 1988

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • DFI
    New Technology of Force Monitoring of Post-Tensioning Ground Anchors

    By Shahid Islam, Lucian Bogdan

    There is a rapid expansion of world’s infrastructure and simultaneously existing infrastructure is aging. The maintenance of infrastructures has been of particular concern to the engineering community

    Jan 1, 2018

  • SME
    An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical Modeling

    By Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson

    Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen

    Jan 1, 2000

  • AUSIMM
    The Treatment of the Auriferous Sulphide Ores of Kalgoorlie

    As requested by my fellow members I shall endeavour to read a paper on the Treatment of the Auriferous Sulphide Ores of Kalgoorlie from a metallurgical standpoint. Before going into the subject it wil

    Jan 1, 1901

  • SME
    Kinetics, of Microbiological Production of Ferric Ion for Heap and Dump Leaching

    By Jai Ghosh, Aprad E. Torma, Roger Guay

    The catalytic effect of ferrous ion in the industrial biohydrometallurgical heap and dump leaching processes is explained. During the bacterial leaching of metal sulfides, ferric ion will partly be hy

    Jan 1, 1989

  • NIOSH
    RI 8762 Calamity Hollow Mine Fire Project - (In Five Parts) - 1. Development and Construction of the Burnout Control Ventilation System

    By Meherwan C. Irani

    The Bureau of Mines is developing a new technological approach to handling the problems of fires in abandoned coal mines and waste banks. This new technology involves the accelerated combustion of "wa

    Jan 1, 1983