Search Documents

  • TMS
    Remediation of Chicken Processing Wastewater using Electrochemically Produced Layered Double Hydroxides

    By Jewel A. G. Gomes

    Green rust (GR) are layered Fe(II)-Fe(III) double hydroxides, having a pyroaurite-type structure consisting of positively charged hydroxide layers and hydrated ions in interlayers. This special featur

    Jan 1, 2010

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • SAIMM
    Development of a corrosivity classification for cement grouted cable strand in underground hard-rock mining excavations - Synopsis

    A systematic study of groundwater conditions at eight underground mine sites exhibiting a wide range of groundwater qualities throughout Australia has been completed at the WA School of Mines. This ha

    Jan 1, 2008

  • AUSIMM
    Nickel Mattes from the Flash Smelter at Kalgoorlie, Western Australia

    The mineralogy and microstructure of mattes from the nickel flash smelter at Kalgoorlie, Western Australia, have been studied. The flash furnace matte consisted mainly of an intimate mixture of pentla

    Jan 1, 1977

  • NIOSH
    OFR-88-92 Regulatory Processes Associated With Metal-Mine Development In Alaska: A Case Study Of The WestGold BIMA

    By Lee Ann Gardner

    This U.S. Bureau of Mines publication presents a case study of the processes used in permitting the Nome Offshore Placer Project, a gold mining project offshore Nome, Alaska which operated from 1985 t

    Jan 1, 1992

  • NIOSH
    RI 9660 - Evaluation Of Systems To Monitor Blind Areas Behind Trucks Used In Road Construction And Maintenance: Phase 1

    By Todd M. Ruff

    The majority of fatalities that occur in road construction work zones in the United States involve a worker being struck by a piece of construction equipment or other vehicle. The Spokane Research La

    Jan 1, 2004

  • DFI
    Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6

    By Daniel Mageau

    Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case

    Jan 1, 1998

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c

    Jan 1, 1995

  • SME
    How To Ensure Seismic Requirements

    By A. Fuerst

    The recent seismic events have shown that earthquakes have an immense destructive power. Chile was hit in February 2010 with a seismic intensity of 8.8 on the Richter scale, and had loss of about 700

    Jan 1, 2012

  • AUSIMM
    Washability Characteristics of the Liddell Seam

    CONTENTSSummary.Introduction.Location and Geology.Historical and Exploitation.Part 1. Washability Characteristics of the Liddell.Seam.Foybrook Open Cut, Top Bench.Sampling.Size and Ash Distribution.Wa

    Jan 1, 1954

  • AUSIMM
    New Technologies for Environmentally Friendly Use of Brown Coal for Power Generation

    By Johnson T, Huynh D

    The State Electricity Commission of Victoria is conducting a program of research and development into alternatives to the use of conventional boilers for the generation of electricity from brown coa

    Jan 1, 1992

  • AUSIMM
    Supplement to: The Surface Plant at the Zinc Corporation Mine, Broken Hill

    Supplement to Proceedings Number 120, December, 1940. Drawings accompanying paper by T M Carey 'The Surface Plant at the Zinc Corporation Mine, Broken Hill'

    Jan 1, 1940

  • AUSIMM
    Robustness of Geostatistical Calculations: A Case Study

    A study of drilling data at various stages of development of an orebody show that the semi-variogram, used for calculating the accuracy of block estimates can be ill-defined if too few data are availa

    Jan 1, 1977

  • AUSIMM
    Geochemistry

    The term geochemistry - chcmbtry' of the earth - is almost limitless in its implied subject, but of recent years a major trend of research in this field has been towards economic application in t

    Jan 1, 1950

  • AUSIMM
    The Differentiation of Macerals by Thin-Film Colouring

    When a thin film of volatile matter is deposited under vacuum on a polished coal surface, and the coated surface is examined microscopically in plane-polarized reflected light, colour changes are obse

    Jan 1, 1970

  • SME
    Using the Modern Metric System

    By John Dasher

    In 1980, some US cars were designed and built to metric dimensions; wine and gas were sold by the liter; and the March of Dimes Walkathon was measured in kilometers. Although the US Congress has taken

    Jan 2, 1981

  • DFI
    The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil Parameters

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s

    Jan 1, 2018

  • NIOSH
    IC 9026 Primary Lead And Zinc Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By G. R. Peterson

    To determine the availability of lead and zinc from demonstrated resources, the Bureau of Mines evaluated 235 mines and deposits in 31 market economy countries. Of the 235 mines and deposits evaluated

    Jan 1, 1985

  • AUSIMM
    An Experimental Detailed Magnetic Survey by Light Aircraft

    From March to May of 1963, the Bureau of Mineral Resources carried out an experimental aeromagnetic survey at Cobar, New South Wales, to field test a proton-precession magnetometer installation in the

    Jan 1, 1964

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008