Search Documents

  • SME
    Phase changes in the decrepitation of solidified high titania slags

    By D. Bessinger, J. M. A. Geldenhuis

    High titania slag is produced from the smelting of ilmenite. These slags contain approximately 85 per cent TiO2 and consist mainly of a M3O5 solid-solution phase. During cooling the slag can decrepita

    Jan 1, 2005

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • CIM
    GET: A Function for Preferential Site Selection of Additional Borehole Drilling

    By M. Sharafodin, A. A. Hassanipak

    Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese

    Jan 1, 2004

  • SME
    A Study-BHP Robinson And BHP Tintaya

    By II Browne

    After a decade of high copper prices, major mining companies are renewing their interest in purchasing operating properties and/or development of ore bodies. An existing operation carries with it a hi

    Jan 1, 1997

  • AUSIMM
    Development of a slimhole downhole nuclear magnetic resonance tool for iron ore – some applications and limitations

    By T A. J Hopper, B J. Birt, K K. Trofimczyk

    Nuclear magnetic resonance (NMR) has been utilised in the oil and gas industry for over 60 years. The technology was recently identified as having potential value in iron ore, where latent bound moist

    Jul 24, 2017

  • SME
    Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121

    This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i

    Jan 1, 2009

  • SAIMM
    Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)

    By C. Musingwini

    An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope

    Jan 1, 2007

  • SME
    The Technology And Economic Incentives For Recovering Coal From Tailings Impoundments

    By A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson

    Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it

    Jan 1, 2001

  • AUSIMM
    Classification and Nomenclature of Ore Reserves

    In 1953, Dr. N. H. Fisher of the Bureau of Mineral Resources, acting on behalf of the Society of Economic Geologists, which is considering the sponsoring of a uniform system of nomenclature for ore re

    Jan 1, 1955

  • AUSIMM
    Copper Mineralization in the Lachlan Geosyncline, New South Wales

    Copper ores are widespread through the Lachlan Geosyncline in New South Wales, but the size of the orebodies is generally small. The largest deposits occur in the Cobar district where an iron-rich cop

    Jan 1, 1970

  • TMS
    A Study on Nickel Containing Iron Alloy Production From West Anatolian Region Lateritic Ores

    By Cem Colakoglu

    In this study, nickel containing iron alloys were produced by carbothermal reduction of lateritic nickel ores obtained from Manisa - Caldag region of Turkiye in order to investigate the reaction mecha

    Jan 1, 2009

  • AUSIMM
    The Supreme Deposit - Exploration Success at a Near Mine Target in the Reefton Goldfield

    By L Reynolds

    Oceana Gold (New Zealand) Limited (OceanaGold) has commenced mining operations at the Globe-Progress mine in the Reefton Goldfield, an area that historically produced 2.1 million ounces of gold from u

    Jan 1, 2007

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • SME
    Field Data Collection: Techniques And Applications

    By M. Maier

    Geographic Information Systems (GIS) has evolved into a powerful tool for analyzing spatial and attribute data in many industries including mining. Modern field data collection techniques add another

    Jan 1, 2001

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • NIOSH
    IC 7001 Review Of Literature On Conditioning Air For Advancement Of Health And Safety In Mines ? Introduction

    By D. Harrington

    This circular presents part I of a series of papers of a review of the literature on air conditioning in mines, with particular reference to the health, safety, and efficiency of miners. It deals with

    Jan 1, 1938

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • CIM
    Changes in grade, volume and contained gold during the mining life-cycle of gold placer deposits

    By J. D. Bliss, G. J. Orris, W. O. Menzie

    "Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and

    Jan 1, 1987