Search Documents

  • ISEE
    The New Progress in the BGRIMM Emulsion Explosives Technology

    By Wang Xuguang, Zhang Xiaozhi, Li Guozhong, Xiong Daiyu

    The emulsion explosive is a new kind of water-based industrial explosives that was developed at the end of 1960s. In the 1970s, BGRIMM invented EL-series emulsion explosive that created a new era of w

    Jan 1, 2003

  • TMS
    Pulsed Power Breaking-Up Technology For Resistant Gold-Containing Ores And Beneficiation Products

    By Valentine A. Chanturiya

    The aim of this paper is basically to show progress in the study of nanosecond processes involved in the disintegration and breaking-up of mineral complexes with fine noble metals. We studied the infl

    Jan 1, 2006

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • DFI
    Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge

    By Mohammad Eslami

    The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway

    Jan 1, 2010

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • AUSIMM
    Some Notes on Sampling for Gold

    In choosing such a threadbare subject for a paper I fear that I may in some measure be taxing your patience, yet as upon the accuracy with which the work is done depends the result of conclusions draw

  • DFI
    Damage To Initially Bent Piles ? Synopsis

    By B. B. Broms

    A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of

    Jan 1, 2010

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • ISEE
    Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping

    By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall

    Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific

    Jan 1, 2018

  • AIME
    Virginia Beach Paper - Discussion (continued) of Prof. Pošepný's paper on the genesis of ore-deposits (see vol. xxiii., pp. 197 and 587)

    Discussion, at the Virginia Beach Meeting, February, 1894, of the Paper of Prof. Posepny. (Trans., xxiii., 197, 587.) Including communications subsequently received. a T. A. Rickard, Denver, Colora

    Jan 1, 1895

  • AUSIMM
    Flotation Energy Consumption and Opportunities for Improvement

    By B Murphy

    Traditionally comminution optimisation has been focused on energy minimisation, whereas flotation optimisation has been focused on recovery improvement. One of the largest, if not the largest, operati

    Jul 15, 2013

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • AUSIMM
    Surface-Area Measurement of Chalcopyrite Concentrates by Methylene Blue Dye Adsorption from Aqueous Solution

    By Tyler R. J

    Methylene blue dye adsorbs on chalcopyrite concentrates slurried in aqueous solution. Saturation adsorption can be achieved within about 24 hours for dye equilibrium concentrations greater than about

    Jan 1, 1979

  • DFI
    Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon Construction

    By Ray Schmahl

    The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin

    Jan 1, 1990

  • SAIMM
    Assessment Of Viscosity Of Slags In Ferrochromium Process

    By L. Forsbacka, M. Nakamoto, L. Holappa

    Viscosity of the slag is one of the central parameters when producing FeCr in submerged arc furnaces. It contributes to smelting behaviour and reduction kinetics of chromite ore as well as to the Cr r

    Jan 1, 2007

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction (328bb1d3-3996-4ea1-925a-2089360bbaba)

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963