Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Process Analysis for Recovery of Metal Values from Copper Smelter Slags

    By J. C. Agarwal

    Slags produced by modern smelting furnaces contain copper values which are unacceptably high for discard. The electric arc furnace is employed commercially to clean copper from flash furnace slags but

    Jan 1, 1976

  • TMS
    Development Of New Copper Continuous Converter

    By Yasuo Ojima

    A new copper continuous converting process was investigated to evaluate the possibility of its application in the commercial operation. The tests were performed both in the laboratory and in pilot pla

    Jan 1, 2003

  • TMS
    Recovery of Valuable Metals from Lead Flue Dust by a Intergrated Process

    By Chao Li, Lim Hongxu, Yuyue Wang, Xie Yang

    "A intergrated process of sulfuric acid leaching, sodium chloride leaching, lead chloride crystallization, lead hydroxide synthesis and roasting was carried out for the recovery of lead, cadmium, copp

    Jan 1, 2014

  • TMS
    Lead Recycling From Battery Scrap And Other Raw Materials In Metaleurop's Lead Smelting Plan In Oker

    By Gernot Schenker

    With the shut-down in the mid-1970s of the last shaft furnaces in the Harz Smelter Plant the long tradition of the Primary Lead Smelter in Oker came to an end. A continuation of the concern was nevert

    Jan 1, 1990

  • TMS
    On The Preparation And Stability Of Scorodite

    By George P. Demopoulos

    In this paper the production and stability of crystalline scorodite (FeAsO4·2H2O) is discussed both on the basis of previously published work as well as recent work performed in our laboratory. The pr

    Jan 1, 2005

  • TMS
    Removal of Lead, Cadmium and Boron from Um-Gheig Pb-Zn Spent Ore Sample

    By M. Omneya El-Hussaini, M. Galal Abdel Wahab, A. Mohamed Mahdy, M. Fathi El Shahat

    "Um-Gheig Pb-Zn representative sample was collected from the main adite of Um-Gheig mine along Red Sea coast in Egypt. Its chemical analysis shows that, it contains 16% Zn, 2.3% Pb, 0.1% Cd and 0.1% B

    Jan 1, 2008

  • TMS
    Analysis of Influence Factors on the Melting Point of the Freeze Slag Inside Flash Smelting Furnace Brickless Reaction Shaft

    By Chuanfu Zhang, Jinliang Wang

    "Brickless reaction shaft is the latest progress for flash smelting furnace. However, there are many factors influence the melting point of the freeze slag inside brickless reaction shaft, and their v

    Jan 1, 2012

  • TMS
    Electrochemical Aspects of Electro winning Lead Metal From Brine-Lead Chloride Electrolytes in the Temperature Range 55-80°C

    By Xiangwen Wang

    Electrochemical measurements associated with the electrowinning of lead metal from concentrated brine (NaCI) - lead chloride (PbCI,) electrolytes at temperatures in the range 328 to 353°K (55 - 80°C)

    Jan 1, 1993

  • TMS
    Flash Converting

    By W. G. Davenport

    The flash furnace is used for smelting concentrate to (i) high-Cu matte and (ii) molten metallic copper. It is also used for converting solidified/crushed matte to molten metallic copper. This is flas

    Jan 1, 2001

  • TMS
    Electrolytic Salt Splitting for Sulfuric Acid and Caustic Recovery: Can It Be Cost-Effective?

    By Alexander Burns

    Electrolytic salt splitting is a technology where acid and/or base is regenerated from a neutral salt using membrane electrolysis. Recent advances in the understanding of brine treatment, membrane sta

  • TMS
    Treatment And Recovery Of Zirconium And Hafnium From The Effluents At Nuclear Fuel Complex

    By SM Rao

    Nuclear Fuel Complex (NFC ) , Hyderabad (IN DIA ) , is engaged in the manufacture of nuclear fuel assemblies and zircaloy structural components required for the Indian nuclear power reactors. The prod

    Jan 1, 1992

  • TMS
    The Cu-Ni-S System And Its Significance In Metallurgical Processes

    By Fiseha Tesfaye, Pekka Taskinen, Daniel Lindberg

    Due to increasing complexities of raw materials for base metals production the conventional pyrometallurgical processes are challenged. To make the appropriate modifications, thorough evaluations of t

    Jan 1, 2016

  • TMS
    The Metskill Program – Rapidly Developing Effective Young Engineers In The Workplace

    By Nina Bianco, Diana Drinkwater

    MetSkill is a professional development program for metallurgical engineers that integrates with normal duties in their first one or two years of service. Graduates work together on a structured techni

    Jan 1, 2014

  • TMS
    A Comparative Study of Oxidants on Gold and Silver Dissolution in Acidic Thiourea Solutions

    By J. C. Huyhua

    The effect or various oxidants on gold and silver dissolution in thiourea solutions (0.05 M in H2SO4) was studied using the rotating disc technique, a.t 2s c and 600 rpm. These studies were carried ou

    Jan 1, 1989

  • TMS
    Advances In Sulfide Smelting -Technology, R&D, And Education

    By H. Y. Sohn

    The considerable progress made in the sulfide smelting technology since the first International Sulfide Symposium of 1983 is discussed. The new developments and innovations have largely been driven by

    Jan 1, 1998

  • TMS
    Global Primary Aluminium Industry 2010 Life Cycle Inventory

    By Linlin Wu, Marlen Bertram, Chris Bayliss, Bernard de Gelas, Samantha Jones, Kurt Buxmann

    "Environmental management is one of the industry cornerstones of sustainable development. In order to understand fully the environmental aspects associated with the raw material acquisition, productio

    Jan 1, 2012

  • TMS
    Reminiscences in Applied Mineralogy

    By P. F. Kerr

    This is not a conventional professional paper. It deals mostly with personal experiences. These concern a background in applied mineralogy. Your committee asked me to do this. I accepted with a Califo

    Jan 1, 1981

  • TMS
    Naoshima Smelter Operation Present and Future -

    By E. Oshima

    In May 1991, a New Mitsubishi Continuous Copper Smelter Line started operation at Naoshima. Recently, it has been continuing steady operation and one and a half year campaign life has been achieved. I

    Jan 1, 1998

  • TMS
    Microscopic Morphological Compensation Film Thickness For Phase-Separated Composite Film

    By Chang Chia -Fu

    The generic structure of our bimesogens is shown in and for a typical blue-phase mixture of the type we describe here. We use mixtures of the ratio 33.4% (n =2.6), 34.1% (n =6.57), 36.6% (n= 11.15) wi

    Jan 1, 2006

  • TMS
    Cobalt (Co), A Welcome Co-Product

    By Bryce Clark

    Cobalts history from the 14th Century is outlined, with a look at its various sources over that period. The present sources and quantities are given, when in 1994 it is an equal co-product of copper i

    Jan 1, 1995