Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ground freezing resolves complex challenges ahead of SEM tunneling

    By Gregory T. Ziegler

    A complex soil profile and high water table, together with a below-grade active subway tunnel, an above-ground elevated railway line, and the heavily travelled Northern Boulevard all passing above the

    Sep 1, 2013

  • SME
    United Nations’ Emergency Preparedness Program Available to Mining Industry

    The Awareness and Preparedness for Emergencies at the Local Level (APELL) program is a process that helps people prevent, prepare for and respond appropriately to accidents and emergencies. APELL was

    Jan 1, 2003

  • SME
    Seismic Upgrades of the Claremont Tunnel

    By Bill Cain, R. John Caulfield, D. Scott Kieffer

    The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl

    Jan 1, 2001

  • SME
    Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction

    By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo

    INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f

    Jan 1, 2007

  • SME
    Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan Operations

    By A. Koski

    A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U

    Jan 1, 2007

  • SME
    Equipment Maintenance – Tips on Maximizing Mining-Equipment Engine Life

    By Reginald Dias

    Mining equipment life may be extended through preventive maintenance and the proper application of quality lubricants. There are several practices mine operators should consider implementing to prese

    Jan 1, 2004

  • SME
    Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data

    By Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami

    For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve

    Jan 1, 2007

  • SME
    Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2009

  • SME
    Alberta Lake Re-Established After Draining to Mine Coal

    By Sukru Sumer

    East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west

    Jan 1, 1995

  • SME
    Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling

    By Remo Grandori

    The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve

    Jan 1, 2001

  • SME
    More Than 110,000 Attend ConExpo in Las Vegas

    By Steve Kral

    More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We

    Jan 1, 2002

  • SME
    Challenges And Triumphs Of A Large-Diameter Microtunnel Relief Interceptor Sewer In Indianapolis

    By Jeremy Morris

    The city of Indianapolis has more than 25,000 homes currently on septic systems. Many of these systems do not function well because of their age and surrounding soil conditions. As Indianapolis has wo

    Jan 1, 2011

  • SME
    Evaluation of Roof Bolter Canopy Air Curtain Effects on Airflow and Dust Dispersion in an Entry Using Blowing Curtain Ventilation Mining, Metallurgy and Exploration (fbebd4c9-e3f3-48b5-bb14-baf48bbb456f)

    By M. R. Shahan, W. R. Reed, J. P. Rider

    Roof bolter operators may be exposed to high respirable dust concentrations on continuous miner sections with blowing face ventilation when bolting is performed downwind of the continuous miner. One s

  • SME
    Mining Review

    Minerals are fundamental to the U.S. economy, contributing to the real gross domestic product (GDP) at several levels?mining, processing and manufacturing finished products. The estimated growth rate

    Jan 1, 2008

  • SME
    Grinding Mill Scale-up Problems

    By N. Arbiter, C. C. Harris

    The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o

    Jan 1, 1982

  • SME
    2012 Fox Conference Turns Its Focus To International Projects

    For the first time in its history, the George A. Fox Conference let its focus venture away from the friendly confines of the East Coast of the United States to spend part of the one-day conference loo

    Jan 1, 2012

  • SME
    Battery Park Truck Sewer Emergency Tunnel Project

    By Mark Rybak

    On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse

    Jan 1, 2008

  • SME
    Metallurgical Development And Design For The Pascua Lama Project

    By R. A. Williams

    The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is

    Jan 1, 2001

  • SME
    Measurement of Overburden Failure Zones in Close Multiple-Seam Coal Mining

    Because of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka

    Jan 7, 2020

  • SME
    Separation of Fe and Mn from Manganiferous Iron Ores via Reductive Acid Leaching Followed by Magnetic Separation Mining, Metallurgy and Exploration (d04b1b84-2a8b-409f-b5c1-e20532b1d7ae)

    By Soner Top

    In this study, a process to separate manganese and iron from manganiferous iron ores by reductive acid leaching followed by magnetic separation was conceived and experimentally tested. In the leaching