Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technical Papers - Haul Truck Fuel Consumption And CO2 Emission Under Various Engine Load ConditionsBy V. Kecojevic
Environmental and economic costs related to equipment fuel consumption and carbon dioxide (CO2) emission present a substantial challenge to the mining industry. Haul trucks are an integral part of the
Jan 1, 2010
-
Changes In Stress, Strain, And Displacement With Change In Slope Angle At The Kimbley Pit, Ely, NevadaBy David W. Wisecarver
Kennecott Copper Corporation and the U. S. Bureau of Mines cooperated in a full-scale slope stability research project at the Kimbley Pit near Ely, Nevada. The west wall of the Kimbley Pit was mined f
Jan 1, 1968
-
Characterization And Prediction Of Froth Pump PerformanceBy J. W. Furlan
Due to the time consuming nature of froth testing in a laboratory environment, it is required, due to practical limitations, to develop a method of applying a single set of performance test data (Visi
Feb 27, 2013
-
A Statistical Determination Of The Optimal Velocity In Coal Mine Entries ? IntroductionBy J. M. Mutmansky
A number of previous publications have attempted to provide the practicing ventilation engineer with simple guidelines on the optimal velocity to be used in mine openings. Some of these velocities wer
Jan 1, 1984
-
Recycling And Secondary Recovery Applications Using An Eddy-Current Separator (c467563b-2080-44fb-b6e2-d516bff25e8e)By D. A. Norrgran
The term "secondary recovery" has recently brought on a new meaning in view of the depletion of natural resources, energy conservation, plant optimization, and the environmental consciousness that has
Jan 1, 1991
-
Longwall Strata Control And Maintenance System- A Stethoscope For Longwall Mining (fc36aa07-8e36-4418-a4f1-6db8963e0d89)By D. W. Park
Longwall Strata Control and Maintenance System (LoSCoMS) is a software and data communication system developed at the University of Alabama. This system integrates real-time shield monitoring, data pr
Jan 1, 1998
-
Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski
High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode
Jun 13, 2023
-
Will Rogers Style Data Dissemination In An Age Of Buck Rogers Style Data Acquisition (Data Resources For Environmental Impact Assessment) - IntroductionBy James E. Jones
The coal mining industry is being called upon to vastly increase production in the coming years. Many mining operations will have to prepare an environmental impact report of some kind and all will ha
Jan 1, 1976
-
DISCOL: A Long-Term, Large-Scale, Disturbance-Recolonization Experiment In The Abyssal Eastern Tropical South Pacific OceanBy G. Schriever, H. Thiel, E. J. Foell
A long-term, large-scale, disturbance-recolonization experiment with relevance to the environmental effects of deep seabed mining is described. The study is funded by the German government and was lau
Jan 1, 1993
-
Cutter Rescue By Borehole - Disaster AvoidedBy John J. Peregoy, James E. Downes
INTRODUCTION The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) is being constructed to provide permanent storage of radioactive TRU waste materials emanating from military wea
Jan 1, 1989
-
Supply, Installation, & Commissioning Of The World's Largest Grinding MillBy V. Svalbonas, S. M. Jones, A. Boughey
In June 1998, the world's largest grinding mill, the 40 ft (12.2 m) diameter 20 MW Cadia gearless SAG mill, was commissioned. This was a leap of over40% above the largest operating SAG mill. A
Jan 1, 2000
-
Instrumentation And Automation In The U.S. Coal Preparation IndustryBy Charles H. Wells
This paper presents a review of the state of the art in coal preparation plant instrumentation and a discussion of automation practice that could be applied based on current mineral beneficiation expe
Jan 1, 1980
-
High Throughput, High Solids Flotation Of 20 X 200 Mesh North Carolina Phosphate In A Short Column Cell (e8f0823f-317a-4179-8746-73c484ba7427)By J. F. Hutwelker
A pilot plant was constructed and operated to investigate the column flotation of 20 x 200 mesh North Carolina phosphate ore, using high throughput, high solids operating conditions developed at the N
Jan 1, 1993
-
Development of a smelting reduction process for low-grade ferruginous manganese ores to produce valuable synthetic manganese ore and pig ironBy Veerendra Singh, NILAMADHABA SAHU, ARIJIT BISWAS
Manganese (Mn) ferroalloys are chiefly consumed in the steelmaking process as a deoxidizing agent or as an alloying element to produce high-quality steels. These alloys are typically produced in a sub
-
Texas Gulf Sulphur Beneficiation Of North Carolina PhosphateBy Thomas J. Wright
The evaluation and development of the Eastern North Carolina phosphate deposit resulted in one of the world's largest and most modern phosphate mines and fertilizer complexes at an investment in
Jan 1, 1971
-
World’s largest live tunnel connection at TARP McCook TunnelBy Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Carmen Scalise, Miquel Sanchez
"The McCook Main Tunnel system consists of a 10-m (33-ft) finished diameter, 490-m (1,600-ft) long, hard rock tunnel constructed from a 27.5-m (90- ft) diameter and 92-m (300-ft) deep main gate and tu
Sep 1, 2016
-
Computer Simulations for Optimal Gold Process DesignBy John T. Bartlett
During the last decade, the increasing price of gold has renewed interest in the various metallurgical techniques for recovering precious metals. Much of the recent technology advance has been aimed a
Jan 1, 1987
-
Removing Diesel Particulate from Underground Mining; A View from the FrontlinesBy Stuart Lister
"When MacLean Engineering chairman and founder Don MacLean got the first question from a minesite about the possibility of addressing ventilation limits through incremental fleet electrification, he w
Jan 10, 2018
-
New Engine For Ultra-Class Trucks; Cummins Unveils Its 3,728 Kw (4,000 Hp) PlatformIn its largest product launch in company history, Cummins Engines welcomed more than 200 customers, vendors and media to witness the unveiling of its new QSK95 engine at its Seymour Engine Plant in Se
Jan 1, 2012
-
Practical Semiautomatic Stope Design And Cutoff Grade Calculation MethodAn incremental-analysis-based stope design and cutoff grade calculation method was developed for an underground metal mine project. Traditional stope design methods are typically very time consuming a
Jan 1, 2012