Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Felsic Volcanics And Tungsten In Neoarchaean Hutti Schist Belt, India.

    By P. Sangurmath, C. Gundewar, M. Riyazulla, V. Vasudev, N. Shadaksharswami

    Dharwar craton in the southern Indian shield, comprises the Neoarchaean foreland in the west and a relatively younger accretionary complex composed of granitoids and intervening gold-bearing volcano-s

    Jan 1, 2007

  • SME
    Design and Construction of the Shoal Creek Raw Water Intake at Lake Lanier

    By D. Rendini, R. D. Gutridge

    INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr

    Jan 1, 2005

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008

  • SME
    Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal Seam

    Fully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when

    Jul 28, 2020

  • SME
    Methods To Improve Mine Ventilation System Efficiency - Introduction - Preprint 09-070

    By C. Pritchard

    John Marks said in his acceptance of the Hartman Award in 2008 ? ?I guess that without the occasional complaint, your mine is probably over-ventilated? (Marks, 2008). Miners are seldom in this situati

    Jan 1, 2009

  • SME
    Coal Dust Wettability: It?s Role In Dust Control And Its Determination

    By K. Mondal

    A macroscopic approach integrated with microscopic analyses for wettability characterization is presented. Wetting depends on 1) Contact between the dust and the fluid droplets, 2) Wettability of the

    Jan 1, 2012

  • SME
    Ventilation and atmosphere control inside a 3-bar compressed air TBM heading

    By B. R. Zernich

    Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec

    Jan 1, 2009

  • SME
    Subsurface Repository Ventilation Design

    By Edward Thomas

    Yucca Mountain Overview The U.S. Department of Energy?s Yucca Mountain Project is a geologic repository project designed to receive, handle, package, transport, and emplace spent nuclear fuel and hig

  • SME
    Wet Autogenous Grinding In Tumbling Mills ? 1. Introduction

    By Marcus Digre

    The autogenous grinding method has been progressively employed in mineral dressing plants during the last 15 years. The term has been used with somewhat different meanings (1), (2), (3). In this paper

    Jan 1, 1970

  • SME
    Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - Introduction

    By M. Botz

    Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the

    Jan 1, 2011

  • SME
    Double Shields to Build the High Speed Railway Network in Spain

    By E. Fernandez

    HIGH SPEED RAILWAY NETWORK Spain is a very adequate country to develop the high speed railway network thank to its geographical feature which has a 600km long radius, from Madrid- the capital that

    Jan 1, 2005

  • SME
    Frontier Research In Dynamic Control, Vision And Collision Avoidance For Truck Haulage

    By S. Agarwal, S. Frimpong

    The creation and maintenance of a healthy working environment in surface mining operations require sustained efforts in pursuing advanced research initiatives toward the development and deployment of

    Jan 1, 2007

  • SME
    Turbocharged engines require special lubrication maintenance

    By Jerry T. Shelby

    Surface and underground mining operations require equipment with high power output ratings. Haul trucks, loaders, dozers, and other equipment need increasing horse-power to meet production demands.

    Jan 3, 1987

  • SME
    Ventilation on demand (VOD) project ? Vale Inco Ltd. Coleman Mine

    By C. Allen

    Vale Inco Ltd. is trialing several energy conservation initiatives in an effort to minimize costs and reduce green house gas emissions. The Ventilation on Demand (VOD) concept is a major project being

    Jan 1, 2009

  • SME
    Preparing A Feasibility Study Request For Proposal In The 21st Century

    By G. Wahl, H. Danilkewich, T. Mann

    Developers of advanced mining projects face the challenge of how to craft a “Request for Proposal for a Feasibility Study” that will result in bids that are comparable and will lead to a successful ex

    Jan 1, 2002

  • SME
    CFD-Based Floatation Model For Prediction Of Pulp Recovery Rate

    By S. Ragab

    The objective of flotation models is to predict the recovery rate of minerals from a flotation cell. In this paper a CFD?based flotation models is presented. The model uses first order rate equation,

    Jan 1, 2012

  • SME
    Underground stope optimization at Agnico Eagle’s Kittilä Mine

    By K. Huttu, A. van Wageningen

    "The Kittilä underground mine in northern Finland is extracting one of the largest known gold deposits in Europe. Kittilä achieved commercial production on May 1, 2009, becoming Agnico Eagle’s first m

    Jan 1, 2015

  • SME
    Mining in Cuba

    By Louis W. Cope

    Since its discovery, Cuba has been called the “Pearl of the Antilles.” The country remains that, albeit a little tarnished these days. In Havana, many of the buildings are being refurbished, while s

    Jan 1, 2003

  • SME
    Linear Programming Optimization Of Asphalt Mix Design - Preprint 09-032

    By K. Awuah-Offei

    The objective of asphalt mix design is to produce a mix with optimal performance using available aggregate stockpiles. Often, this process does not take into consideration aggregate plant stockpile in

    Jan 1, 2009

  • SME
    Design and construction of a surface air cooling and refrigeration installation at a South African mine

    Impala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum

    Jan 1, 2009