Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    New Aspects of Shock Waves in Underwater Blasting

    By Zoltan Susanszky

    The total available energy in an explosive charge is seldom fully utilized in industrial operations. For this reason more explosive is normally used to perform a job than we would calculate. In an exp

    Jan 1, 1976

  • ISEE
    The Real Relationship Between Cracks and Vibrations: Are Cracks in Buildings Really Created by Vibrations?

    By Thierry Bernard

    It was in the 1980s that USBM published one of the first regulations to protect constructions from the effects of vibrations caused by mine blasts. Several countries have made their own regulations or

    Jan 1, 2018

  • ISEE
    Blast Optimization Using both the Multiple Blasthole Fragmentation (MBF)and Multiple Seed Waveforms (MSW)Models at an Open Pit Metal Mine

    By J. P. Proulx, Richard O’Meara, Ruilin Yang

    A blast optimization project was carried out at an Open Pit Metal Mine using the Multiple Blasthole Fragmentation (MBF) Model and the Multiple Seed Waveform (MSW) blast vibration model. The aim of the

  • ISEE
    Pump Protection Systems on Mobile Equipment

    By Tom Watts

    This paper will focus on the design, manufacture and use of pump safety systems on MMUs (Mobile Manufacturing Units – Bulk Trucks) with progressive cavity pumps. The practice of pumping bulk blasting

    Jan 1, 2009

  • ISEE
    Study of the Detonation Process of Novel Hydrogen Peroxide-based Explosives Using High Speed Video

    By Italo Onederra, Miguel Araos

    "In order to characterize non-ideal explosives, the explosives industry rely on unconfined velocity ofdetonation tests and where possible underwater pond tests. The information obtained from such test

    Jan 1, 2017

  • ISEE
    How Genetic Algorithms and Cloud Processing Optimise

    By Mark Roberts

    Automation, data analytics and optimisation are key trends in the mining industry. Doing more, and better, while expending less resources targets KPIs around efficiency and productivity. With the expl

    Feb 6, 2023

  • ISEE
    A powder factor build-up model to quantify most common influencing factors at the Serra Sul mine

    By L. Chaves

    In rock blasting, due to numerous factors, both controllable and uncontrollable, the execution rarely meets the planning. The powder factor is an important KPI for blasting since it represents the amo

    Jan 1, 2024

  • ISEE
    Danger Tree Blasting In BC

    By Dave Weymer

    Falling timber in BC has always been a hazardous job. Huge, often rotting trees and steep, rugged terrain combine to create difficult and dangerous conditions. Death and injury rates are among the hig

    Jan 1, 2013

  • ISEE
    Seismic Modelling Control Of Blasts In A Nuclear Power Plant

    By Alain Blanchier, Pascal Bernasconi

    Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati

    Jan 1, 2008

  • ISEE
    Blasting: Strict Tort Liability or Negligence

    By Timothy Stark

    At present blasters are strictly liable under tort law for personal injury and property damage caused by ground vibrations and/or air overpressures. The application of strict tort liability to vibrati

    Jan 1, 2002

  • ISEE
    Airdek: an Update

    By Michael D. McGill, John L. Turner, Don Sieger, Doyle Newhouse

    Since its introduction by Atlas Powder Company in late 1986 as a means of highwall stabilization in surface coal mines (1), applications of the basic AirDek (2) blasting technique have multiplied rapi

    Jan 1, 1991

  • ISEE
    The Waiting Time Recovery Test

    By John T. Aler

    The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified

    Jan 1, 1991

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    A New Integrated Workflow to Increase Drilling Accuracy using Post Process Kinematics(PPK) Drones and Smart Drills

    By Ravi Sahu, Kris Jeremiah

    This paper aims to study the benefits of using Post Processed Kinematics(PPK) surveying methodology combined with Drone photogrammetry to achieve highly precise positioning (X, Y, Z) of drill holes b

    Feb 1, 2020

  • ISEE
    Underground Pillar Blasting with Bulk Emulsion explosives

    By H Russell

    An account of an experimental blast at the Sullivan Mine involving a small pillar drilled with 4 1/2" diameter up-holes, and loaded with emulsion explosives from a truck-mounted tank/pump unit.

    Jan 1, 1984

  • ISEE
    New Development in Mechanized Uphole Charging of Explosives

    By Bengt Ljung

    Manual charging of long upward drilled holes in mines is a heavy and risky job today. Mechanization of this work has been requested for some time by miners, their supervisors, industrial safety organi

    Jan 1, 1978

  • ISEE
    Review of flyrock incidents in surface mining and the limitations of current predictive models

    By T. Szendrei, S. Tose

    This paper will review several flyrock incidents that occurred recently in the South African mining industry to highlight that potential difficulties of the historical approaches to the problem of fly

    Jan 1, 2024

  • ISEE
    Isee Photography In Blasting Session

    By T. Palangio

    Most blasters wouldn’t think of initiating a shot without a seismograph to record vibration and air blast results. Some might even measure the velocity of detonation but few surprisingly record the ev

    Jan 1, 2008

  • ISEE
    Blast Optimisation at the Porgera Gold Mine in Papua New Guinea

    By Peter Bellairs, Anthony Bubb

    The Porgera Gold Mine is located at an altitude of 3000m in the central highlands of Papua New Guinea some 600 km Northwest of Port Moresby the capital city. Access to the mine is via a five hour trip

    Jan 1, 1997

  • ISEE
    World's Longest Highway-Tunnel Tests 'Site Sensitized Emulsion'

    By Bjoern R. Petterson, Lars Haakon Siem

    The world's longest highway-tunnel -- the Aurland Tunnel in western Norway -- is scheduled to be opened in the year 2000. A project to build a main highway between Oslo and Bergen with no ferry connec

    Jan 1, 1996