Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Centrifuge Modeling of Temperature Effects on the Pullout Capacity of Energy Piles in Clay

    By John S. McCartney, Ismaail Ghaaowd

    This study presents the results from centrifuge modeling experiments performed to understand the effects of temperature changes on the pullout capacity of scale-model energy piles embedded in normally

    Jan 1, 2018

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • DFI
    A Simple Evaluation Of Dynamic Pile Tests

    By D. Kolymbas

    A simple formula is introduced which allows the evaluation of dynamic pile tests. The following case is considered: The pile top is dynamically loaded by an impact. The velocity v of the pile top is r

    Jan 1, 1989

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011

  • DFI
    American Practice In Design And Installation Of Driven Piles For Structure Support

    By Hal W. Hunt

    Heavier loading and more efficient equipment is helping to keep driven piles competitive in America. Better Knowledge and testing of soils and support materials make it practical to use higher stresse

    Jan 1, 1987

  • DFI
    Soil-Cement Walls For Excavation Support

    By David S. Yang

    The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab

    Jan 1, 2003

  • DFI
    Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour

    By Guo H. Lei

    Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro

    Jan 1, 2006

  • DFI
    Lateral Load Test on Piles with Large Free Stand

    By P. V. Chandramohan

    "In ports, piled berths are designed and constructed for berthing of ships with a finite draught. Piles in a bridge foundation also have a large free stand above scoured level. The piles of these stru

    Jan 1, 2015

  • DFI
    The Analysis Of Results From Routine Pile Load Tests

    By Bengt H. Fellenius

    THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma

    Jan 1, 1988

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Auger-Cast Piles Founded In Compressible Bearing Stratum

    By Alfred H. Brand

    New York City contains extensive deep deposits of glacial lake varved silt and clay, often overlain by organic soil. An 18 story building was proposed for Manhattan's upper East Side in one such

    Jan 1, 2003

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    Starsol Piles Foundation Of A Steel Structure At The San Martin De La Vega Resort Park (Madrid)

    By Claudio Olalla

    This paper relates to the foundation of a steel structure located at the San Martin de la Vega (Madrid) amusement park. The structure has more than 100 supports with various loading conditions, includ

    Jan 1, 2002

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • DFI
  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008