    Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - Synopsis

    By D. K. ] [Gupta

    The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and

    Jan 1, 1996

  • DFI
    New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure Foundations

    By Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer

    Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct

    Sep 8, 2021

  • DFI
    Improvement Of Toe Resistance Of Drilled Shaft Foundations Using Smart Cells

    By Mario A. Terceros Herrera, Mario Terceros Arce, Antonio Marinucci

    A Smart Cell is a closed-type tip post-grouting device that is attached to the bottom of the steel reinforcement cage of a drilled shaft and is used to enhance performance and to reduce uncertainty th

  • DFI
    Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility Tunnel

    By Amit Srivastava, Monica Malhotra

    In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through

    Sep 1, 2022

  • DFI
    Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles

    By Timothy C. Siegel

    Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi

    Jan 1, 2010

  • DFI
    Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And Overview

    By Edmund J. Cardoza

    WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM

    Jan 1, 2001

  • DFI
    The Progress Of Jet Grouting In The Last 10 Years In Japanese Market

    By H. Yoshida

    Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g

    Jan 1, 2010

  • DFI
    Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea Bissau

    By Frédéric Rocher-Lacoste

    On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da

    Jan 1, 2008

  • DFI
    Seismic and Lateral Load Design and Testing Guidelines

    By Don Deardorff, Ke Yang, Yingcai Han, Ken Sorensen, Robert Kruger, Mark Petersen, Diane Fiorelli, Larry Goldfarb, Kathryn Petek, Kwabena Ofori-Awuah

    Design of deep foundations for lateral loads requires an understanding of soil-foundation-structure response during loading. Lateral loads on a deep foundation (piles) could be due to earthquakes, win

    Jan 1, 2012

  • DFI
    Dynamic Load Testing of Drilled Deep Foundations

    By Paikowsky, Samuel G.

    "Due to the way drilled deep foundations are being constructed, their structural integrity and geotechnical capacity are highly variable. Drop weight systems are increasingly being used to dynamically

    Jan 1, 2015

  • DFI
  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • DFI
    Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design Format

    By Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker

    There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo

    May 1, 2022

  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006

  • DFI
    Implementation of Kalman Filtering Techniques for Filtering CPT Cone Tip Measurements

    By Gerald Verbeek, Erick Baziw

    Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils

    Sep 8, 2021

  • DFI
    Implementation Of Kalman Filtering Techniques For Filtering Cpt Cone Bearing Measurements

    By Gerald Verbeek, Erick Baziw

    Cone penetration testing (CPT) is a popular and cost effective tool for geotechnical site characterization. CPT consists of pushing at a constant rate an electronic penetrometer into penetrable soils

    Oct 1, 2021

  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991

  • DFI
    Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam

    By Mario Mauro

    Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-

    Jan 1, 2008

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007