Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate

    By Carlos Avalos Casillas, Saul Ortiz Landeros

    The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a

    Jan 1, 2014

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009

  • CIM
    Metallurgical Testing: Modeling Recovery versus Ore Grade

    By Manqiu Xu

    "Ore grades are decreasing and ore deposits are becoming more complex. In order to make a sound economical decision about a mining project, metallurgical testwork must be carried out. A few large “rep

    Jan 1, 2013

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    Study of Relationship between Pyrochlore Matrix Composition and Surface Chemistry Effects on Collector Adsorption

    By B. Hart, J. Marois

    "Scanning electron microscopy coupled with energy dispersive X-ray spectroscopy (SEM–EDX), and Time of flight secondary ion mass spectroscopy (TOF-SIMS)were used to analyze pyrochlore grains from Niob

    Jan 1, 2013

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Non-Explosive Continuous Mining Methods Being Developed By CSIR: Miningtek

    By R. Patrick

    As a unique South African organisation, CSIR: Division of Mining Technology (Miningtek) strives to support the mining industry by improving health, safety and productivity through developing, adapting

    Oct 1, 2001

  • CIM
    Achieving the Benefits of Information Technology in Surface and Underground Mining Processes

    By Sean Dessureault

    Information technology (IT) initiatives in the past have tended to be sold on their ability to maximize resource output and return on capital by using assets more effectively and efficiently. Many IT

    May 1, 2002

  • CIM
    A Protocol for Conducting Plant Trials Testing Grinding Media to Determine Recovery Improvements: The Ernest Henry Mine Plant Trial

    By Allen Chung, John Twomey, Christopher J. Greet

    "It is widely accepted that the type of grinding media has an impact on the grinding chemistry and subsequent flotation behaviour of the sulphide minerals being separated. There are countless laborato

    Jan 1, 2011

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Comminution, Flotation and Gravity Separations

    By James A. Finch

    "I offer a personal view of what the next 30 years holds for mineral processing. Re-stating that mineral processing will remain a vibrant industry in raw material production, growth opportunities in w

    Jan 1, 1998

  • CIM
    Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic Method

    By Robert E. McIvor

    "The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe

    Jan 1, 2011