Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modelling Quench Sensitivity of Aluminium Alloys

    By Nigel Saunders, Zhanli Guo

    "Quench sensitivity of heat-treatable aluminium alloys is closely related to the precipitation process taking place during quenching. Faster cooling results in less precipitation of coarse phases duri

    Jan 1, 2018

  • CIM
    Notes on Block Caving at the King Mine of the Asbestos Corporation, Limited, Thetford Mines, Quebec

    By J. G. Ross

    A DESCRIPTION of the block-caving system of mining as practised at the King mine of Asbestos Corporation, Limited, Thetford Mines, Que., was presented. at the Annual Meeting of the Institute held in Q

    Jan 1, 1936

  • CIM
    Greenhills - a competitive transformation

    By E. Wusaty

    "Fording Coal is a wholly owned subsidiary of Canadian Pacific Limited. The company was founded in 1968 to mine metallurgical coalfor export at the Fording River operations in southeast British Columb

    Jan 1, 1994

  • CIM
    Yard and Dock Railways, Town of Wabush

    By E. W. Coderre, R. C. Baxter

    "This paper describes the townsite of Wabush and the two railways operated by Wabush Mines for the loading and unloading of iron ore concentrate. The town of Wabush is located approximately 200 air mi

    Jan 1, 1969

  • CIM
    A Brief Overview of the Process Modeling/Simulation and Design Capabilities of Metsim

    By Curtis Rempel, John Bartlett, Alex Holtzapple

    METSIM is a powerful program capable of modelling and simulating every known metallurgical and inorganic chemical process. METSIM is used by companies throughout the world to design, simulate and cont

    Jan 1, 2014

  • CIM
    Mine Dewatering Performance Improvement with Reduced GHG Footprint—Encased Electric Submersible Pump System

    By Agbo Chima

    Low-lying sections of open-pit mines accumulate water, especially during the rainy seasons, preventing access to resource-bearing areas. To sustain mining operations, the water must be lifted out of t

    Jan 1, 2023

  • CIM
    Treatment of Complex Feeds at Noranda Copper Smelting and Refining

    By Peter Godbehere, Christian Desroches, Viken Baboudjian

    "Noranda Copper Smelting and Refining is a unit of Noranda Metallurgy Inc., comprising the Home smelter in Rouyn-Noranda, Quebec and the C.C.R. Refinery in Montreal East. The Home smelter provides cus

    Jan 1, 1995

  • CIM
    Other conglomerate-hosted deposits

    By D. S. Robertson, G. E. Nutter, T. P. Podolsky

    "IntroductionBasal Proterozoic quartz-pebble conglomerates are found both west of Elliot Lake, in Duncan, Jarvis and Aweres Townships, north of Sault Ste. Marie and to the east and northeast of Sudbur

    Jan 1, 1986

  • CIM
    Copper-Nickel Separation Pilot Plant Evaluation of Flowsheet Options

    By Sadan Kelebek, Gerhard W. Heinrich, Peter F. Wells, Peter J. Whittaker

    "Based on plant mineralogical data & circuit modelling, a pilot plant campaign was conducted at Strathcona Mill to identify options for improving the performance and operating flexibility of the coppe

    Jan 1, 1995

  • CIM
    Effects of Warm Rolling Conditions on Deformability and Mechanical Properties of Magnesium Alloy Sheet

    By I. Yarita

    Magnesium alloys have the lowest density among the metals in practical use, and have properties such high specific strength, electromagnetic interference shielding and good vibration damping. Thus, th

    Jan 1, 2006

  • CIM
    The Influence of Jarosite Generation on the Indium Leach Rate during a Leaching Process of Secondary Zinc Oxide

    By Mei-Yan Yang, Qiu-Ying Wang, Ltd. Yunnan Yuntong Zinc Co., Guo-Mu Chen, Meng-Yang Huang, Peng Zeng, Guo-Feng Li

    "Historically, alot of jarosite was found in the leaching residue when leaching indium from secondary zinc oxide materials. The reasons for the formation of indium bearing jarosite were theoretically

    Jan 1, 2016

  • CIM
    The Importance of Mineralogy on Regrind Energy Consumption

    By David Rahal, Saul Ortiz, Maria Escobedo

    The general trend in the minerals industry is towards the processing of fine grained, disseminated mineral deposits. This has led to an increase in the number of fine/ultra-fine grinding installations

    Jan 1, 2016

  • CIM
    Interactive computer modelling of conveyor systems

    By A. W. Chan

    "An interactive computer simulation model of conveyor systems used in oil sands mining has been developed to aid in the selection of mining equipment and the evaluation of operating policies. The mate

    Jan 1, 1982

  • CIM
    Beneficiation of Rare Earth Element Enriched Eudialyte from the Norra Kärr Peralkaline Intrusion with Wet High Intensity Magnetic Separation

    By M. Leijd, K. S. Forrester, M. Saxon, M. Oczlon

    This paper provides an introduction to wet high intensity magnetic separation (WHIMS) and its successful application to the beneficiation of rare earth element (REE) enriched eudialyte. The analysis i

    Jan 1, 2014

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    The Development and Mineral Resources of Northern British Columbia

    By Forrest A. Kerr

    Northern British Columbia is a term which probably conveys to various individuals quite different meanings. To the average person it signifies an area of indefinite size and indefinite position which

    Jan 1, 1929

  • CIM
    Gold Eagle Mine

    By H. Clare Horwood

    "Two structures, a fracture zone and a shear zone, contained the two orebodies that yielded all the ore mined at the Gold Eagle mine. The orebodies are known as the Gold Eagle vein and the No. 1 shear

    Jan 1, 1954

  • CIM
    Increasing Paste and Hydraulic Backfilling Efficiency Through Instrumentation

    By B. D. Thompson

    Many mines adopt necessarily conservative backfilling strategies due to a lack of understanding of their backfill behaviour. In the past five years, extensive instrumentation campaigns have focused on

    Aug 1, 2013

  • CIM
    Multiscale Modeling of Nanoindentation: Significance of Local Temperature

    By W. Beres, R. E. Miller, B. Shiari, L. R. Zhao

    A dynamic multiscale (MD/FE) method has been used to study dislocation generation and plastic deformation during a nanoindentation process which is physically associated with the generation of heat wi

    Jan 1, 2006

  • CIM
    Quemont Mine (db50601f-ad6f-4d87-b861-feb5f8261048)

    By J. S. Scott

    "The Quemont property comprises 640 acres lying directly north of and adjoining the Noranda (Horne) mine. During 1926 to 1928, United Verde Extension Mining Corporation sank a shaft 235 feet and did 3

    Jan 1, 1954