Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry AnalysisBy Olli Haavisto, Juha Timperi
"Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy
Jan 1, 2016
-
Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian MinesBy Michael I. Brittan, Craig M. Sams
"Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si
Jan 1, 2006
-
An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 mBy Wendy L. Naysmith
This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to
Oct 1, 2010
-
Rock Strength Characterization for Excavations in Brittle Failing RockBy B. H. Kim
It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength
May 1, 2009
-
Towards Optimum Value in Underground Mine SchedulingBy Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
Goldcorp’s Penasquito Pyrite Leach ProjectPeñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit
Jan 1, 2017
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Formation of Schwertmannite-Like and Scorodite-Like Coatings on Pyrite and its Implications in Acid Mine Drainage ControlBy N. Hiroyoshi, R. D. Corpuz, M. Ito, Hokkaido University, C. B. Tabelin, S. Veerawattananun
"Acid mine drainage (AMD), the very acidic and heavy metal-contaminated leachate generated when pyrite-bearing rocks are exposed to surface oxidizing conditions, is a serious environmental problem enc
Jan 1, 2016
-
Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problemsBy Stuart Elliot
Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over
Nov 1, 2011
-
Wireless Communications in Mineral Processing ApplicationsBy Peter Metcalfe
"Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen
Jan 1, 2014
-
150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebrationBy H. J. McQueen
ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA
May 1, 2011
-
Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)By N. Coli
The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant
May 1, 2009
-
Implementing Best Practices of Metal Accounting at the Strathcona MillBy Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney
"The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern
Jan 1, 2012
-
Recent research directions at CANMET’s Cape Breton Coal Research LaboratoryBy David J. Forrester
"CANMET’s research into underground coal mining is primarily conducted at the Cape Breton Coal Research Laboratory (CBCRL), established in 1981 to conduct safety research in underground coal mines. Lo
Jan 1, 1996
-
Assessing the Performance and Efficiency of Fine Grinding TechnologiesBy Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux
"The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp
Jan 1, 2006
-
Lifter Design Using a DOE Approach with a DEM Charge Motion ModelBy Ian Orford, Peter Radziszewski, Lud Strah
"An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha
Jan 1, 2003
-
Constancia Project Process Plant Design and Start UpBy David Stephenson, Hugo Granados, Steven Klohn
"HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv
Jan 1, 2016
-
Rubber Liners in the Service of Large Diameter Ball Mill at Hudbay, Constancia Mine, PeruBy Manuel Sanchez, Marcial Medina, Matt Hurley, Hugo Granados, Pramod Kumar, Raj Rajamani, Jose A. Delgadillo
"Large-diameter ball mills have traditionally used steel liners—steel being a highly durable material that can be shaped into any desired geometry, among which the double-wave has been the preferred d
Jan 1, 2017
-
Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil
May 1, 2007
-
Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, ManitobaBy P. Walford, C. Mealin, D. Good
"The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C
Jan 1, 2009