Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines

    By William Shaw

    Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de

    Oct 1, 2009

  • CIM
    The ACACIA Reactor Improving Gravity Recovery!

    By Ish Grewal

    The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig

    May 1, 2002

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • CIM
    Geologic Setting of the Lush's Bight Group of Western Notre Dame Bay

    "The rocks of Notre Dame Bay form part of the Central Paleozoic Mobile Belt (Williams, 1964) of the Newfoundland Appalachians. The Central Paleozoic Mobile Belt of the northern part of the island cons

    Jan 1, 1972

  • CIM
    A coal processing characteristics index

    By N. Wang, A. I. A. Salama

    "An index to evaluate the amenability for processing of different coals is implemented. The index is based on the well-known Mayer-curve or M-curve. The index is superior to other existing indices and

    Jan 1, 2001

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • CIM
    Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc Ores

    By D. M. Wyslouzil

    "This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment

    Jan 1, 1984

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.

    By Pierre Gaucher

    It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob

    Oct 1, 2001

  • CIM
    Mining Automation Program

    By C. J. Preston, R. E. Ström, G. R. Baiden

    "On January 1st 1996 Inco Limited, Tamrock OY, Dyno Explosives Group and CANMET formed a consortium for the development of robotic mining equipment. This project is a five year research and developmen

    Jan 1, 1997

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975

  • CIM
    An Evaluation of Flotation Reagents at the Majdanpek Copper Mine

    By P. V. Avotins, I. Djurkovic, D. R. Nagaraj, M. Grunjic, A. Day

    "As part of a major reconstruction and expansion of the Majdanpek Copper Mine, an investigation and optimization of the flotation collector regime was undertaken. The flotation response of the major m

    Jan 1, 1992

  • CIM
    Effective Methods of Arsenic Removal from Gold Mine Wastes

    By J. Lee, R. G. Rosehart

    "The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a

    Jan 1, 1972

  • CIM
    Filtering and Shipping Concentrates at Britannia

    By E. R. Packer

    "The mill of Anaconda Britannia Mines is located on the eastern shore of Howe Sound, approximately 32 miles north of Vancouver, British Columbia. The mill has a daily capacity of 3400 to 3500 tons and

    Jan 1, 1972

  • CIM
    Milestones in the Mining Industry in Canada

    By John A. Allan

    Introduction There are times when meditation on the past is worth while. Too often does it happen that in the busy routine there appears t9 be little time for reflection, and little good or benefit t

    Jan 1, 1933

  • CIM
    Use of a Stereo-Topometric Measurement System for the Characterization Of Rock Joint Roughness In-Situ and in the Laboratory

    By B. S. A. Tatone

    The surface roughness of unfilled rock discontinuities has a major influence on the deformational and hydraulic behaviour of discontinuous rock masses. Although it is widely recognized that surface ro

    May 1, 2009