Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Integrated Dredging AutomationMost mining dredges are adapted from canal/harbour dredges. Their automation and control systems are generally not designed for integrated mining operations. Consequently they have a number of limitat
Jan 1, 2001
-
Mine Management - The Need for New SkillsA case is made for broader commercial education of executive and operational managers in Australian mining companies. The competitive advantages and disadvantages of Australian miners are examined. Ar
Jan 1, 1985
-
Building Business Cases for Maintenance Improvement ProjectsBy F Jullian, L Jofre
Many maintenance managers find it difficult to justify investments in maintenance improvement initiatives. In part, this is due to a tendency by mine managers to regard maintenance purely as a cost ce
Jan 1, 2006
-
A New Approach to Planning New Coal-Fired Power Stations in Developing CountriesBy Walsh V
The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to
Jan 1, 1987
-
Improving cobalt extraction through oxidative blowing of copper-nickel matteBy R A. Pakhomov, L V. Krupnov, P V. Malakhov, I M. Dymov
The article presents results of thermodynamic calculations and laboratory studies, focusing on the cobalt behaviour during oxidative smelting of copper-nickel mattes. The compositions of the studied s
Aug 21, 2024
-
Moving Broken Hill into the Third DimensionPasminco is actively addressing the optimal utilisation of the known orebody at the Broken Hill mine, in addition to actively exploring for economic mineralisation in the region. As part of the poli
Jan 1, 1997
-
Automatic search strategy for ROM stockpile recovery optimisationBy M Wagner, H Assimi, F Neumann, C Garcia, B Koch
Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the
Nov 10, 2020
-
A Method of Assessing the Efficiency of Powered Supports in ServiceBy Bigdy D. N
The paper describes a system for providing mine management with a continuous indication of the effectivness of longwall coalface powered supports in controlling roof-to-floor convergence. The syst
Jan 1, 1988
-
Compacted nickel Powders for Alloying and ElectroplatingBy Flann R. C
A small modification to current industrial practice should lead to better nickel powders for use in alloying, electroplating, and powder metallurgy. Nickel powder compacts sold for alloying are not
Jan 1, 1979
-
Continuous Haulage Prospects for Underground Coal MinesDetailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport
Jan 1, 1982
-
Considerations for Mechanised Excavation of Rock TunnersThis paper discusses considerations to be made for the selection of rock tunnelling machines, as opposed to drilling and blasting. A systematic approach is presented in terms of utilizing data frc
Jan 1, 1987
-
Overall Concepts in Drilling for Roof BoltingBy Tonegato S, Wood M
The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv
Jan 1, 1986
-
Operation of Filter Presses for Tailings DewateringBy D Pepper
Despite the limited literature regarding the pressure filtration of mine tailings (compared to the large number of papers published each year on paste thickening of tailings) the number of mines dry s
Oct 29, 2012
-
Slope Stability Radar for Monitoring Mine WallsSlope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f
Jan 1, 2003
-
A Laboratory Facility For Testing Cemented FillsThis case study describes various aspects of establishing a laboratory facility for testing chemically-cemented fill materials. The applicability of data obtained from such a facility related to m
Jan 1, 1973
-
Optimising Moisture Control for Zinc - Lead SinteringBy Bowden MW
Sintering of lead-zinc concentrates is practised by Sulphide Corporation to provide both desulfurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial Smelting Process bla
Jan 1, 1985
-
Remote Control Loaders for Longhole Open StopesThe paper is introduced by some general comments on the Electrolytic Zinc Company West Coast Mines operations. An outline of the geology of the Rosebery Mine orebodies preced- es a resume of the min
Jan 1, 1977
-
Benchmarking Estimation Methods for Coal Resource EstimationBy G Davies, D Dunn, C Mawdesley, O Bertoli
The coal industry in Australia has been actively working in recent years towards the (re)integration of geostatistical techniques to the process of coal resource estimation. The benefits of using geos
Jan 1, 2009
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Technology for Mine Water Management General ReportThis session comprises six papers: One paper is specifically on advances in drilling techniques, a paper presents a classification for water inrush rich with corresponding guidelines for protection,
Jan 1, 1988