Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Copper Tank House Technology Reviewed and Assessed

    The present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail

    Jan 1, 1985

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • AUSIMM
    Project Financing of Australian Resources

    The classic description of Project Finance as "the reliance by lenders on the cashflow of a project, supported by the assets of the project with no recourse to the project sponsor's corporate

    Jan 1, 1987

  • AUSIMM
    The Structural/Stratigraphic Development of the Sishen South (Welgevonden) Iron Ore Deposit, South Africa, as Deduced From Ground Gravity Data Modelling

    By W J. Botha

    The Palaeoproterozoic Transvaal Supergroup in the northern Cape Province of South Africa hosts high grade (>60 per cent Fe) hematitic and specularitic iron and manganese mineralisation. The mineralisa

    Jan 1, 2005

  • AUSIMM
    Mining and the Environmental Protection Legislation in N.S.W.

    In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open

    Jan 1, 1983

  • AUSIMM
    Granulation Behaviour of Specularite Fines in Ferrous Sinter Mixtures

    By J Pan, B-J Shi, X-B Li

    The granulation behavior of specularite fines which possess poor ballability was studied with limonite fines as a function of nuclei particles and adhering fines. The results show that the permeabilit

    Jul 13, 2015

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
  • AUSIMM
    Geothermal Resources and Developments in New Zealand and the South West Pacific (bba7e742-bfb8-4679-8fb3-fcaeb6b9d1e2)

    The Southwest Pacific is a region of active volcanism and geothermal systems. Only in New Zealand have the geothermal systems been exploited for electricity generation and industrial processing. At pr

    Jan 1, 1990

  • AUSIMM
    A study of heat and material balances in direct reduction plant with various conditions

    By H Kim, M J. Sun

    Global steel companies are actively combating climate change by reducing carbon emissions. Traditional steel production, using the blast furnace (BF) – basic oxygen furnace (BOF) process, heavily depe

    Aug 21, 2024

  • AUSIMM
    Water Management in the Fitzroy Basin ù Issues for the Mining Sector

    By E P. Donohue

    Changes to water industry practice are required as a consequence of the Council of Australian Governments water reform agenda which binds all states and territories to a range of measures intended to

    Jan 1, 2003

  • AUSIMM
    Gold Exploration in Australia How Long Will The Honeymoon Last?

    The Australian gold industry has in recent years experienced a tremendous growth period, though not to levels prevailing at the turn of the century. There are, however, a number of dynamic factors at

    Jan 1, 1986

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    Cannington Paste Fill System - Achieving Demand Capacity

    By M Revell

    The paste fill system at BHP CanningtonÆs underground silver-lead-zinc mine is described. The first of its type in Australia, the paste fill system has been operational since December 1997. Key techni

    Jan 1, 2000

  • AUSIMM
    Metallurgical Evaluation of an Ore Resource and its Effect on Ore Reserves

    The different stages of the metallurgical evaluation of an ore resource and their importance to overall project evaluation are described. Particular emphasis is placed on the liaison that is necessa

    Jan 1, 1987

  • AUSIMM
    The New Latent Conditions Clause in the Recent as 2124-1986, General Conditions of Contract and its Application in Tunnelling Contracts

    The latent conditions clause in various general conditions of contract have traditionally proved to be a source of significant disputes in tunnelling contracts, even when extensive geotechnical i

    Jan 1, 1987

  • AUSIMM
    In Plant Sampling for Gravity Recoverable Gold - ABSTRACT ONLY

    The implementation of robust, reliable and accurate sampling systems is the key to the successful management of any mineral processing plant. The representative sampling of a mineral processing plant

    Aug 1, 2010

  • AUSIMM
    Getting Optimum Value from Ore Characterisation Programs in Design and Geometallurgical Projects Associated with Comminution Circuits

    Inevitably the 'post-boom' era has changed the emphasis of many mining companies away from new project development and expansion to optimisation of existing operations. However, regardless o

    Jan 1, 2009