Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Computer Aided Mineral IdentificationA microcomputer based expert system is presented for fast and cheap mineral identification. Because of the increasing pipularityof and interest for minerals and precious stones (selling, hobby polishi
Jan 1, 1985
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
Metso SmartTag - The Next Generation and BeyondBy K J. Riihioja, E Nozawa
SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f
Sep 26, 2011
-
Circum-Pacific Porphyry Copper, Gold and Molybdenum DepositsBy P Hollings, J Holliday
Porphyry copper, gold and molybdenum deposits form in subduction-related settings in association with calc-alkalic or alkalic magmatism. Hydrothermal alteration assemblages are zoned, with potassic co
Jan 1, 2008
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine SchedulingBy R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
Operating Performance of the Phu Kham IsaMill™By G Harbort, D Zoetbrood
"The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit
Oct 10, 2016
-
Expansion of the Mount Isa Mines Copper Concentrator Phase One Cleaner Circuit ExpansionBy G Harbort, V Lawson
Mount Isa Mines Limited operates one of the worldÆs largest underground mines in North West Queensland. ItÆs mining and smelting complex produces copper anode, crude lead bullion (containing silver),
Jan 1, 2003
-
The Ore Minerals of Webb's Silver Mine, Emmaville, N.S.W.The Emmaville district is located in the northern part of the New England region of New South Wales some 400 miles north of Sypney. Better known for its substantial production of tin and tungsten ores
Jan 1, 1961
-
Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economyBy B D. Saffron
In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co
Aug 2, 2023
-
Risk assessment tool for mines using diesel-powered mobile equipmentBy A Reid, A W. Musk, O Jones
In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa
Oct 16, 2017
-
Strategic Decision-making in Mining – Business Optimisation Using Flexible Evaluation ModelsBy B E. Hall, D B. Kahler
"'Optimisation' has become a catchcry among many mining companies looking to tell the market how mining businesses will be improved and shareholder value increased. Consequently, the term 'optimisatio
Mar 8, 2016
-
Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau MineBy G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic
The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t
Sep 1, 2014
-
Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine PlanningBy G Williams
Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me
Oct 5, 2011
-
Coal Mine Ventilation and the LawBy M Parcell
"Ventilation risks in an underground mine have essentially remained the same for centuries, yet theevidence suggests that there are many coal mines that have failed to adequately control these risks.T
Jun 1, 2012
-
Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mineBy A Nugraha, H Thanasekaran, K Tatetdagat
The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa
Aug 29, 2018
-
A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West QueenslandBy K George
The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The
Sep 20, 2017
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017