Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of an Online Elemental Analyser to Optimise the Sinter Process at ThyssenKrupp Steel Europe, Duisburg, GermanyBy C Delwig
ThyssenKrupp specialises in the manufacture of high-grade steel-sheet products. Its main customers include the automotive, construction, household appliance, energy and packaging industries.At its wor
Jul 11, 2011
-
Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustmentBy Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li
The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit
Jun 19, 2024
-
Advances in downhole assay measurements and calibration techniquesBy H Rossiter, C Simpson, J Market, P Jeanneau
Downhole Assay tools are a geophysical method to collect an instigated response from the material surrounding a drill hole and deliver a multielement proxy-assay. They were first tested in the Pilbara
Nov 8, 2021
-
Zonations, Mineralisation Paragenesis and Rock Types of the Nena High Sulphidation Copper-Gold Deposit, Papua New GuineaBy Espi J
The Nena high sulphidation deposit, located in the Sandaun Province, PNG, contains a measured and indicated resource of 51 Mt of copper ore grading 0.5% Cu and 0.6 g/t Au at a 0.5% Cu cut-off. The
Jan 1, 1997
-
An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement InitiativesAn Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives
Sep 13, 2010
-
Scenario-based Project Evaluation – Full Mineral Value Chain Stochastic Simulation to Evaluate Development and Operational AlternativesBy S Coward, S Jackson, S Moayer, J E. Vann
The variability and uncertainty of mineralisation, coupled with subsequent uncertainty in mining and processing, is often paid scant regard or overlooked during the evaluation of mining projects. In m
Aug 18, 2014
-
Project Hobson – New Technology in AucklandBy T Ireland
The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug
Mar 8, 2011
-
Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG millBy N S. Weerasekara, S Town, E Lessing, J A. De Torres
Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi
Aug 29, 2018
-
Reducing the environmental and economic cost of metal extraction by optimal blast designBy A Tsang, D La Rosa, L Julian, W Hunt, R Pratama
Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It
Sep 1, 2024
-
Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn DepositBy B Armstrong
The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value
Sep 5, 2011
-
An Overview of Surface Rock Support for Deformable Ground ConditionsBy M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson
"Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface
Mar 24, 2014
-
Challenges in Modelling Large Complex Orebodies at the George Fisher North MineBy M Haydon
How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?
Jan 1, 2006
-
A Simplified Creep Analysis for Low Strength Seams in Rock PillarsBy M Habte
This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a
Mar 8, 2011
-
Optimisation in Long Hole Stope Production DrillingBy R LEATHAM
Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho
Jan 1, 1992
-
Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operationsBy H Rossiter, A Maddever, J Market, P Jeanneau, A Virani
It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai
Nov 10, 2020
-
Ventilation Officers or Mine Managers? Who should Ultimately be Responsible for Mine Ventilation? A Comparison between Western Australia and QueenslandBy A Halim
"There is still debate about who should ultimately be responsible for the ventilation system in anunderground mine. The Queensland Coal Mining Safety and Health Regulation 2001, states that adedicated
Jun 1, 2012
-
Effect of alumina on microstructures of iron ore sinters from the perspective of the phase equilibria of the CaO-SiO2-Fe2O3-Al2O3 systemBy A Takahashi, Y Uchisawa, M Hayashi, T Watanabe, M Susa
Owing to the deterioration of iron ore, the Al2O3 concentration in iron ore increases, and thus it is important to investigate the effect of increment in Al2O3 concentration on the microstructures of
Jun 19, 2024
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri MineBy M Brady, O Salisbury, C Claassen, B Beamish, H Baxter
Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp
Aug 31, 2015
-
New Materials Technology Applied in Longwall MiningCoal slurry pumping was introduced into the U.K. in 1973. Gateside packs were prepared in areas of containment using R.O.M. coal and a special fast setting cement. The packs restricted roadway con
Jan 1, 1986