Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underground Mining Operations at The Selwyn Project

    Since the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill

    Jan 1, 1988

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    Characterisation and Carbothermal Reduction of a Murray Basin Ilmenite Concentrate

    By Y Li

    An ilmenite ore from the Murray Basin was initially characterised using combined X-ray Fluorescence Spectroscopy (XRF), X-Ray Diffraction (XRD), Scanning Electron Microscope (SEM) and Electron Probe M

    Oct 5, 2011

  • AUSIMM
    Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" Project

    Brief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s

    Jan 1, 1987

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Recent Experiences at the Kangaroo Flat Mine, Bendigo

    By M Hernan

    Bendigo Mining Limited has established a modern underground gold mine and processing plant at Bendigo in central Victoria. The Bendigo goldfield produced around 22 000 000 oz of gold between 1851 and

    Jan 1, 2008

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • AUSIMM
    A Computer Program for Analysing Rock Behaviour Based on the Bieniawski Criterion

    Development of a global failure criterion for rocks has been a desired goal in rock mechanics. Due to variations in factors affecting rock specifications and their mechanical properties, proposing a s

    Nov 25, 2010

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    Sampling in Block Cave Mines

    By I T. Ross

    Sampling drawpoints in block cave mines has been a contentious issue for many years. Doubts have been expressed as to the validity of the process used at most mines. This paper outlines the sampling p

    Aug 21, 2012

  • AUSIMM
    A Review of the Kapit Orebody, Lihir Island Group, Papua New Guinea

    By J R. Robinson

    Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio

    Jan 1, 2004

  • AUSIMM
    Costerfield – a Narrow Vein Case Study

    By M McCarthy

    Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n

    Jun 22, 2016

  • AUSIMM
    Some Notes on Diamond Drilling Practice at Mount Isa

    The Black Star lead and zinc ore-bodies, situated in the western zone of mineralisation at Mount Isa occupy an area 2000 ft. long with varying widths from 100 ft. to 300 ft. The strike is N5°W, a

    Jan 1, 1932

  • AUSIMM
    A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels

    By T Ireland, B Wright, S Weaver

    All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei

    Sep 17, 2014

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    Design of Yield Pillars for Improved Stability of Colliery Roadways

    By Bhattacharyya A. K

    A major constraint on sustaining high rates of production in the collieries of the Southern Coalfield of New South Wales is the inability to develop panels fast enough to match the rates of extraction

    Jan 1, 1995

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    HORIZONTAL - A Matrix-Independent Generic Sampling Standard

    We outline a first version of an ambitious goal: The world's first horizontal (matrix-independent) generic sampling standard. The specific needs and requirements are overwhelming, as all the worl

    Mar 1, 2010