Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Continuous Hyperbaric Filtration of Copper Concentrates

    By Ehlert G, Steinlechner E

    The paper describes a new process for filtration which combines the continuous operation of conventional vacuum filters with the low final moisture contents hitherto only achievable with plate and f

    Jan 1, 1993

  • AUSIMM
    The Preparation and Consolidation of Tantalum Powder

    Following the preparation of tantalum oxide and carbide (1) an investigation of the details relating to the production of tantalum metal powder was planned. From the literature (2) it was evident that

    Jan 1, 1946

  • AUSIMM
    Process optimization of Mount Morgan gold tailing retreatment plant

    By Hampshire MJ

    The tailing retreatment project rated at 10 000 t/day commenced operations in October 1982. The operation consists of dredging, feed preparation, cyanide leaching and carbon-in-pulp (CIP) gold reco

    Jan 1, 1986

  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • AUSIMM
    Welcome to the University

    Mr. President, Ladies and Gentlemen, it gives me great pleasure to welcome you, on behalf of the Council and Administration, to this University and extend to you our very best wishes for a most succe

    Jan 1, 1975

  • AUSIMM
    Underground Ore Handling Systems

    By B Olsson, C Glassock

    Computer simulation modelling (discrete event) has been used at Olympic Dam (OD) to model the handling of ore from the point of extraction at the stope drawpoint through to the ore stockpile on the su

    Jan 1, 2005

  • AUSIMM
    Benchmarking versus Test Work - How Should You Manage Process Risk?

    By D Jeffery, R Whittering, G Lane

    Most aspects of process design are best addressed via bench scale or pilot plant scale test work. However, as experience is gained, fundamental or indicative data can provide more than adequate inform

    May 24, 2012

  • AUSIMM
    The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning Issues

    The Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the

    Jan 1, 1999

  • AUSIMM
    Ethics in the Minerals Industry

    By L Brodie-Hally

    In the early-1990s, Tad Golosinski, the former the head of mining department at WASM participated in a review mining engineering courses in Australia. The review team asked various industry executives

    Jan 1, 2002

  • AUSIMM
    Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, Australia

    By Read T. A

    THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to

    Jan 1, 1921

  • AUSIMM
    High Pressure Particle Bed Comminution of Ores Minerals a Challenge

    By Kellerwessei H, Oberheuser G

    A major breakthrough in extending the life of the wear material of high pressure roll crushers when treating moist, highly abrasive material has removed the last impediment to the widespread accepta

    Jan 1, 1993

  • AUSIMM
    Increasing the Reliability and Safety of Mining Machines by Application of the Vibration Diagnostic (Experiences and Results)

    The reduction in the number and duration of machinery and equipment failures is an important source of economical efficiency enhancement in the Polish coal mining industry.Non-dismantling methods have

    Jan 1, 1991

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    Return to Hillgrove

    By C Dell

    Hillgrove, situated on the New England plateau of New South Wales, is an area rich in history and resources. Key resources are predominantly antimony, gold and scheelite and the area surrounding the h

    Jan 1, 2008

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Reducing ventilation change downtime and increasing operational uptime

    By J A. Rowland

    When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during

    Oct 12, 2022

  • AUSIMM
    The McArthur Lead-Zinc-Silver Deposit (6bbc0ffa-ed17-44c3-ba3c-758c85cd106f)

    By Jephcott S

    The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralized bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo

    Jan 1, 1980