Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AUSIMM
    Containment of Mineral Sands Processing Wastes in Saline Water Products

    By C Doblin

    Any value addition to the mineral sands in the Murray Basin (Australia) will generate waste that needs to be disposed of safely. For example, conversion of ilmenite and synthetic rutile to titania (Ti

    Jan 1, 2002

  • AUSIMM
    Low pH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit

    By H Sofatzis, J Kinal, J Siliezar, B Kirkwood

    Ernest Henry Mining (EHM) is a copper, gold and magnetite mining and processing operation located 38 kilometres north east of Cloncurry in the Mount Isa - Cloncurry mineral district of north west Quee

    Jul 15, 2013

  • AUSIMM
    Base Metals Concentrate Sales Contracts - Change Pavlov and the Dog

    By S E. Munro, P D. Munro

    The commonly traded base metals concentrates of copper, lead, tin and zinc are sold by miners to custom smelters using contracts whose terms were generally established at the beginning of the 20th cen

    Sep 7, 2015

  • AUSIMM
    Precipitation of Gold and Silver in Cyanide Solutions by Carbon

    THIS paper is the outcome of experiments carried on and experience gained. at the Waihi-Paeroa Gold Extraction Company's tailings plant at Waihi, New Zealand. The plant was erected to treat accum

    Jan 1, 1912

  • AUSIMM
    Contributed Discussion to "A Study of Mine Subsidence at Two Collieries in the Southern Coalfield, New South Wales" by W. A. Kapp (Proceedings No. 276, December, 1980)

    Mr Kapp's paper helps considerably to clarify the subsidence/mine geometry relationships in New South Wales. It is in the best tradition of the presentation of field investigations such as has bu

    Jan 1, 1981

  • AUSIMM
    The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View

    The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference

    Jan 1, 2008

  • AUSIMM
    Electroformed Gold from Gold Mine Solutions ù A New Approach to Gold Recovery

    Laboratory and pilot plant investigations aimed at recovering gold as an electroformed sheet from gold eluate and gold leach solutions and slurries are discussed. The electrolytic test work undertaken

    Jan 1, 2007

  • AUSIMM
    Paleodepth Studies of Epithermal Au-Ag Deposits in the North Island of New Zealand û Progress Toward a 4D Model

    By R L. Brathwaite

    Previous paleodepth studies of low-sulphidation epithermal Au-Ag deposits in the Coromandel region indicated that economic gold mineralisation was generally limited to a depth zone of 100 to 400 m bel

    Jan 1, 2003

  • AUSIMM
    Do All MetPlants Work Well? PlantMets can Ensure They Do

    By P Cameron

    MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not

    Sep 7, 2015

  • AUSIMM
    Determination of Low Concentrations of Tin in Ores

    By Alvin J. F

    Tin in ores containing 0·025 to 1·5 per cent tin can be determined polarographically by the reduction of the chlorostannite ion at the dropping mercury electrode in 2M hydrochloric acid solu

    Jan 1, 1962

  • AUSIMM
    Optimization and Control of Laboratory Sulphidization of Oxidized Copper Ores with an Ion Selective Electrode

    By Woodcock J. T

    A sulphide ion selective electrode (ISE) is suitable for control of sodium sulphide additions in flotation because it has a rapid response to changeS in S2- concentrations, can indicate -low concentra

    Jan 1, 1978

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • AUSIMM
    On Mining and Metallurgical Education

    In New York City, on the walls of the library of the United Engineering Societies are these words:"Engineering-the art of organising and directing men and of controlling the forces and materials

    Jan 1, 1941

  • AUSIMM
    Alluvial Sapphire Mining in the New England Region of New South Wales

    The richer, shallower sapphire deposits of the New England region of New South Wales which have been traditionally mined by the small miner are almost worked out. Larger mining and exploration compani

    Jan 1, 1990

  • AUSIMM
    Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting Conditions

    For small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not

    Jan 1, 1979

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    The Evolution in Design of Longhole Open Stoping at Zinc Corporation Limited/New Broken Hill Consolidated Limited Mines with Particular Reference to Sloped Wall Mining

    By Solomons S. S, Tillmann V. H

    The progress of longhole open stoping (LHOS) at Zinc Corporation Limited and New Broken Hill Consolidated Limited (ZC/NBIIC) is described together with the design of a novel sloped wall longhole stopi

    Jan 1, 1981

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015

  • AUSIMM
    Towards More Sustainable Minefills - Replacement of Ordinary Portland Cement with Geopolymer Cements

    By G F. Brent, R D. Hart, C Carr, F Felipe

    In underground operations, where copper, gold and other metals are mined, the open stopes can be backfilled to stabilise surrounding workings. This fill may consist of tailings from the processing pla

    Jan 1, 2007