Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-52-82 Mine Grounding Systems - Development Of Tests And Criteria To Evaluate Grounding SystemsBy Wils L. Cooley
The report covers tests and criteria for the establishment of safe grounding systems for coal mines. The work deals primarily with under-ground coal mines, but much is applicable to surface mines as w
Jan 1, 1979
-
Teck – Aurubis: Un enfoque integrado desde la mina hasta el metal para desarrollar depósitos de cobre con alto contenido de arsénico usando el proceso CESLBy Keith Mayhew
Ante la alta demanda de cobre por el crecimiento urbano e industrial y para la construcción de infraestructuras, la industria del cobre necesita una solución para el desarrollo sustentable de los recu
Sep 12, 2011
-
A Case Study of Longwall Roof-Supports InteractionBy Y. H. Wang
During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research
Jan 1, 1986
-
MLA 28-84 - Mineral Investigation Of The Bristol/Granite Mountains Wilderness Study Area (BLM No. CDCA-256), San Bernardino County, CaliforniaBy Charles Sabine
The U.S. Bureau of Mines studied mines and prospects in the Bristol/Granite Mountains Wilderness Study Area (WSA) in 1982. The 45,000 acre WSA, located in the eastern Mojave Desert of California, is u
Jan 1, 1984
-
IC 7982 Survey Of Oil Production In West Virginia By Waterflooding, 1959 (In Three Parts) 2. Maxton Sand, Burton Field, Wetzel County ? Introduction And SummaryBy Charles E. Whieldon
The importance of producing more oil from known petroleum reserves has placed increased emphasis on the application of secondary-recovery methods. Recently published reports3 4/ describe the resul
Jan 1, 1961
-
OFR-39-91-V1 Maintainability Design [Guidline For] Of Underground Mining Equipment: Volume I - Final Technical ReportBy E. J. (Kirk) Conway
The objectives of this project were to: (1) determine the extent to which maintainability design concepts and principles have been applied to the design of underground coal mining equipment, (2) try t
Jan 1, 1988
-
Does Thickening Save Water? ? SynopsisBy A. J. Vietti
A pilot plant paste thickening campaign was conducted at the Anglo Platinum Limited Mogalakwena South Concentrator plant in South Africa in order to determine the water saving capability of P&TT techn
Jan 1, 2011
-
Mining Engineering's 1977 Annual ReviewIt is probably safe to say that, as the economic well-being of the mining industry goes, so goes the fortunes of mineral explorationists. And in 1977 the industry was not well at all. The year-long de
Jan 5, 1978
-
Thermophysical properties of rocks from the Bushveld ComplexBy M. Q. W. Jones
This paper presents a compilation of physical properties of rocks from the Bushveld Complex. The database consists of more than 900 measurements each of thermal conductivity and density. The data are
Jan 1, 2015
-
The Ministry of Commerce Investigation into the Proposed North West South Island National Park - An OverviewThe Ministry of Commerce has been carrying out an evaluation of the resources of the Northwest Nelson region. In part this was to revisit the issues covered in the earlier proposal to close part of No
Jan 1, 1993
-
Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development AgreementBy D. M. Doyle, P. J. Hannon
"The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to
Jan 1, 1987
-
Mineral Investigation Of The Lake Fork Rare II Area (No. 6290), Baker And Wallowa Counties, Oregon ? Introduction ? Summary StatementBy Martin D. Conyac
Results of the minerals survey indicate low potential for the discovery of placer gold along Deck Creek aid for copper, silver, and gold in PreTertiary rocks within the boundaries of the Lake Fork RAR
Jan 1, 1983
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Lothological Recognition Based on Monitored Drilling Performance ParametersBy Jonathan Peck, Doug Pollitt, Malcolm Scoble
Over the past 5 years the Department of Mining and Metallurgical Engineering, McGill University, has been involved in the performance monitoring of both percussive and rotary drills. Studies conducted
Jan 1, 1991
-
OFR-180-84 Remote Manual Control Roof BolterBy Peter de Bakker
The objective of this contract was to develop a simple, reliable, economical, remote-control roof bolting module for installation of mechanical and resin bolts. It was to be capable of placing longer
Jan 1, 1983
-
Quantification of the impacts of coalmine water irrigation on the underlying aquifers - SynopsisIt is predicted that vast volumes of affected mine water will be produced by mining activities in the Mpumalanga coalfields of South Africa. The potential environmental impact of this excess water is
Jan 1, 2009
-
IC 8092 Sand And Gravel Operations And Costs, Construction Aggregates Corp., Ferrysburg, Mich. ? SummaryBy William A. Beck
The Construction Aggregates Corp. operates a plant for processing sand and gravel from two deposits in Ottawa County, Mich. The bulk of the sand is obtained from a sand dune on the shore of Lake Michi
Jan 1, 1962
-
OFR-62-79 Geotechnical Assessment Of Potential Methods Of Underground Mining Of The Copper-Nickel Deposits Of Northeastern MinnesotaBy M. P. Hardy
Copper-Nickel ores in northeastern Minnesota could establish a new industry in a region where underground mining has not been active. This study reviews geotechnical data relevant to the selection and
Jan 1, 1978
-
Analysis Method into True Detonator Delay Element DiscrepanciesBy Joseph Daly
An investigation into inaccurate scatter of pyrotechnic detonators led to the innovation of utilising existing (every day) equipment in a manner to accurately determine the true scatter of detonators.
Jan 1, 2014
-
OFR-56-78 Implementation Of A High Speed, Heavy Current, DC Switching SystemBy Howard B. Hamilton
Laboratory performance of mercury filled current limiting devices (CLD) used for high speed switching of DC circuits (600 volts and below, up to 1000 amperes) using a system involving a parallel conne
Jan 1, 1978