Search Documents

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • IPMI
    The IPMI Journal 2022

    By IPMI Educational and Scientific Foundation

    It is with great pleasure that we announce the availability of this fourth issue of the IPMI Journal, a publication of the International Precious Metals Educational and Scientific Foundation. This dig

    Dec 1, 2022

  • AUSIMM
    The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines Limited (add9b255-f732-4157-b8bc-50ff50a1fd29)

    At Great Boulder Gold Mines Ltd. a number of attempts were made to remove water soluble copper and iron salts from calcined pyritic concentrates but variou~ problems arose and the methods were abandon

    Jan 1, 1964

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • AUSIMM
    Sulphuric Acid Production at Port Pirie

    The production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.

    Jan 1, 1956

  • AUSIMM
    Sulphide Vein Formation During Metamorphism of The Nairne Pyrite Deposit

    Two structurally and mineralogically distinct sulphiderich veins cross-cutting the disseminated sulphides of the Nairne Pyrite Member appear to be products of local remobilization of sulphides under f

    Jan 1, 1969

  • SME
    Mining and Sustainable Development at Red Dog

    By D. H. Horswill

    The Red Dog Mine is the world’s largest zinc mine. It is located 145 km (90 miles) north of the Arctic Circle in northwest Alaska on lands owned by the Inupiat Eskimo organization called the Northwest

    Jan 1, 2000

  • TMS
    Weibull Analysis of Tensile Tested Piassava Fibers with Different Diameters

    By Denise Cristina Oliveira Nascimento

    Environmental considerations in addition to technical, economical and societal benefits are increasingly promoting the substitution of natural fibers for glass fiber in polymer matrix composites. Howe

    Jan 1, 2010

  • DFI
    Urban Legends: Two Case Studies That Redefine "Impossible"

    By Grant R. J. Bearss

    Due to environmental concerns in urban construction, many typically simple projects become very complex or feasibly impossible. The introduction of relatively new concepts has redefined "impossible",

    Jan 1, 2002

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • AIME
    Institute of Metals Division - Wrought Alloys of the Tungsten-Tantalum-Molybdenum- Columbium System

    By E. J. Dulis, A. Kasak, R. C. Westgren

    The potential of uirought tungsten- and tantaluw-rich alloys of the W-Ta-Mo-Cb system was investigated for high-strength structural applications above 2500° F. Appreciable strengthening of tung-sten a

    Jan 1, 1964

  • SME
    Remote-Control Monitoring Cuts Maintenance Costs

    By Michael W. Lewis

    The latest downturn in the world’s metal prices has forced many mining companies to focus on cost reduction and productivity improvements to remain competitive. Maintenance represents a significant p

    Jan 1, 2000

  • SAIMM
    Process flow sheet development for the Corridor Sands Project

    By L. Rademeyer, P. Mazzoni, C. Kubank, F. Brown

    The Corridor Sands deposits of heavy mineral sands represent the largest known economic resource of titanium dioxide minerals. The West Block of Deposit 1 alone contains Measured and Indicated Mineral

    Jan 1, 2003

  • CIM
    Vegetative Studies on Sulphide and Slag Tailings

    By E. M. Watkin

    "Although Canada has achieved one of the highest living standards in the world, people and organizations have, over the past decade, begun to question the cost and means of this achievement. Concern h

    Jan 1, 1975

  • IIMP
    Optimización del proceso gold mill Yanacocha Minera Yanacocha

    By Luis Vente

    El presente texto describe las mejoras implementadas en el proceso Gold Mill de Minera Yanacocha luego de 3 años de operación desde marzo 2008 hasta la fecha. El desarrollo de diferentes diseños en lo

    Sep 12, 2011

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • SME
    Getting The Job Done: Esg Auditing And Reporting - SME Annual Meeting 2023

    By B. A. Filas, H. N. Lammers

    Responsible environmental, social, and governance (ESG) practices are not new to mining. It is the ESG acronym that has become the “flavor-of-the-day” with the stock markets, accounting firms, and inv

    Feb 1, 2023

  • AIME
    Turbo Blowers For Blast-Furnace Blowing (be90441e-2cd3-4376-b257-7753cb3c3421)

    By Richard Rice

    TURBO blowers for blast-furnace blowing have now been in use for some years, and a review of the experience gained and the present state of progress may be interesting. FIG. 1.-STEAM TURBINE DIRECT C

    Jan 5, 1914

  • SME-ICGCM
    Analysis Of Rockbolt Performance At The Waste Isolation Pilot Plant

    By Liane J. Terrill

    Rockbolt failures at the Waste Isolation Pilot Plant have been recorded since 1990 and are categorized in terms of mode of failure. The failures are evaluated in terms of physical location of installa

    Jan 1, 1995